Combined Notice of Filings #1, 25281-25282 [2017-11270]
Download as PDF
Federal Register / Vol. 82, No. 104 / Thursday, June 1, 2017 / Notices
[FR Doc. 2017–11277 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–C
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK30JT082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–122–000.
Applicants: Bishop Hill Energy LLC,
Blue Sky East, LLC, California Ridge
Wind Energy LLC, Canandaigua Power
Partners, LLC, Canandaigua Power
Partners II, LLC, Erie Wind, LLC,
Evergreen Wind Power, LLC, Evergreen
Wind Power III, LLC, Imperial Valley
Solar 1, LLC, Niagara Wind Power, LLC,
Prairie Breeze Wind Energy LLC,
Regulus Solar, LLC, Stetson Holdings,
LLC, Stetson Wind II, LLC, Vermont
Wind, LLC, Orion US Holdings 1 L.P.,
BRE TERP Holdings Inc.
Description: Application for
Authorization under Section 203 of the
Federal Power Act and Request for
Waivers, Confidential Treatment and
Expedited Consideration of Bishop Hill
Energy LLC, et al.
Filed Date: 5/25/17.
Accession Number: 20170525–5206.
Comments Due: 5 p.m. ET 6/15/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1470–001.
Applicants: Duke Energy Progress,
LLC.
Description: Tariff Amendment: DEP–
PPA RS Nos. 174–177 Supplemental
Filing to be effective 7/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5195.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1553–001.
Applicants: Duke Energy Progress,
LLC.
Description: Tariff Amendment: DEP–
Fayetteville RS No. 184 Supplemental
Filing to be effective 7/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5197.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1557–001.
Applicants: Duke Energy Progress,
LLC.
Description: Tariff Amendment: DEP–
NCEMPA RS No. 200 Supplemental
Filing to be effective 7/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5199.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1678–000.
VerDate Sep<11>2014
18:32 May 31, 2017
Jkt 241001
Applicants: Saddleback Ridge Wind,
LLC.
Description: § 205(d) Rate Filing:
Shared Facilities Agreement to be
effective 6/1/2017.
Filed Date: 5/24/17.
Accession Number: 20170524–5178.
Comments Due: 5 p.m. ET 6/14/17.
Docket Numbers: ER17–1679–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: PJM
Transmission Owners submit revisions
to OATT, Sch 12 for technical
amendment to be effective 7/24/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5096.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1680–000.
Applicants: Wabash Valley Power
Association, Inc.
Description: § 205(d) Rate Filing:
Corrections to eTariff Table of Contents
to be effective 8/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5113.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1681–000.
Applicants: Wabash Valley Power
Association, Inc.
Description: § 205(d) Rate Filing:
Amendments to Rate Schedules—Parke
County to be effective 7/25/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5117.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1682–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Wholesale Market Participation
Agreement No. 4705; Queue No. AC1–
197 to be effective 5/8/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5127.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1683–000.
Applicants: American Transmission
Systems, Incorporated, Mid-Atlantic
Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI and MAIT submit ECA, Service
Agreement Nos. 4560, 4561, 4683 to be
effective 5/26/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5130.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1684–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Wholesale Market Participation
Agreement No. 4706; Queue No. AC1–
198 to be effective 5/8/2017.
Filed Date: 5/25/17.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
25281
Accession Number: 20170525–5151.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1685–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
and Distribution Service Agreement
SCEBESS–007 Project to be effective
5/26/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5166.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1686–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of an Amended & Restated
Interconnection, Interchange and
Construction to be effective 7/24/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5182.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1687–000.
Applicants: AEP Texas Central
Company.
Description: § 205(d) Rate Filing: TCCLa Paloma Energy Center IA Fourth
Amend & Restated Cancellation to be
effective 5/23/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5184.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1688–000.
Applicants: Public Service Company
of Oklahoma.
Description: § 205(d) Rate Filing:
PSO–OGE Cemetery Road Delivery
Point Agreement to be effective
5/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5185.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17–1689–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing: AEP
TX-Buckthorn Westex Interconnection
Agreement to be effective 5/8/2017.
Filed Date: 5/25/17.
Accession Number: 20170525–5189.
Comments Due: 5 p.m. ET 6/15/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
E:\FR\FM\01JNN1.SGM
01JNN1
25282
Federal Register / Vol. 82, No. 104 / Thursday, June 1, 2017 / Notices
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11270 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1672–000]
mstockstill on DSK30JT082PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Gulf Coast Solar Center
III, LLC
This is a supplemental notice in the
above-referenced proceeding of Gulf
Coast Solar Center III, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 14,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
VerDate Sep<11>2014
18:32 May 31, 2017
Jkt 241001
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11273 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14819–000]
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Allamuchy Pumped Storage
Hydroelectric Project to be located near
the town of Budd Lake, New Jersey in
Morris County, New Jersey. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 70 acres and a
storage capacity of 1,050 acre-feet at a
surface elevation of approximately 1,150
feet above mean sea level (msl) created
through construction of new rollercompacted concrete or rock-filled dam;
(2) excavating a new lower reservoir
with a surface area of 39 acres and a
total storage capacity of 1,260 acre-feet
at a surface elevation of 780 feet msl; (3)
a new 1,328-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (5) a new 150-foot-
PO 00000
Frm 00059
Fmt 4703
Sfmt 9990
long, 50-foot-wide powerhouse
containing two turbine-generator units
with a total rated capacity of 32
megawatts; (6) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (7)
appurtenant facilities. Possible initial
fill water and make-up water would
come from the Musconetcong River. The
proposed project would have an annual
generation of 116,253 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: (267) 254–6107.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14819–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14819) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–11276 Filed 5–31–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\01JNN1.SGM
01JNN1
Agencies
[Federal Register Volume 82, Number 104 (Thursday, June 1, 2017)]
[Notices]
[Pages 25281-25282]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11270]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC17-122-000.
Applicants: Bishop Hill Energy LLC, Blue Sky East, LLC, California
Ridge Wind Energy LLC, Canandaigua Power Partners, LLC, Canandaigua
Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind Power, LLC,
Evergreen Wind Power III, LLC, Imperial Valley Solar 1, LLC, Niagara
Wind Power, LLC, Prairie Breeze Wind Energy LLC, Regulus Solar, LLC,
Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC, Orion
US Holdings 1 L.P., BRE TERP Holdings Inc.
Description: Application for Authorization under Section 203 of the
Federal Power Act and Request for Waivers, Confidential Treatment and
Expedited Consideration of Bishop Hill Energy LLC, et al.
Filed Date: 5/25/17.
Accession Number: 20170525-5206.
Comments Due: 5 p.m. ET 6/15/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-1470-001.
Applicants: Duke Energy Progress, LLC.
Description: Tariff Amendment: DEP-PPA RS Nos. 174-177 Supplemental
Filing to be effective 7/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5195.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1553-001.
Applicants: Duke Energy Progress, LLC.
Description: Tariff Amendment: DEP-Fayetteville RS No. 184
Supplemental Filing to be effective 7/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5197.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1557-001.
Applicants: Duke Energy Progress, LLC.
Description: Tariff Amendment: DEP-NCEMPA RS No. 200 Supplemental
Filing to be effective 7/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5199.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1678-000.
Applicants: Saddleback Ridge Wind, LLC.
Description: Sec. 205(d) Rate Filing: Shared Facilities Agreement
to be effective 6/1/2017.
Filed Date: 5/24/17.
Accession Number: 20170524-5178.
Comments Due: 5 p.m. ET 6/14/17.
Docket Numbers: ER17-1679-000.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: PJM Transmission Owners
submit revisions to OATT, Sch 12 for technical amendment to be
effective 7/24/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5096.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1680-000.
Applicants: Wabash Valley Power Association, Inc.
Description: Sec. 205(d) Rate Filing: Corrections to eTariff Table
of Contents to be effective 8/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5113.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1681-000.
Applicants: Wabash Valley Power Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendments to Rate
Schedules--Parke County to be effective 7/25/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5117.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1682-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Wholesale Market
Participation Agreement No. 4705; Queue No. AC1-197 to be effective 5/
8/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5127.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1683-000.
Applicants: American Transmission Systems, Incorporated, Mid-
Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI and MAIT submit ECA,
Service Agreement Nos. 4560, 4561, 4683 to be effective 5/26/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5130.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1684-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Wholesale Market
Participation Agreement No. 4706; Queue No. AC1-198 to be effective 5/
8/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5151.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1685-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: GIA and Distribution Service
Agreement SCEBESS-007 Project to be effective 5/26/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5166.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1686-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) Rate Filing: Filing of an Amended &
Restated Interconnection, Interchange and Construction to be effective
7/24/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5182.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1687-000.
Applicants: AEP Texas Central Company.
Description: Sec. 205(d) Rate Filing: TCC-La Paloma Energy Center
IA Fourth Amend & Restated Cancellation to be effective 5/23/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5184.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1688-000.
Applicants: Public Service Company of Oklahoma.
Description: Sec. 205(d) Rate Filing: PSO-OGE Cemetery Road
Delivery Point Agreement to be effective 5/1/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5185.
Comments Due: 5 p.m. ET 6/15/17.
Docket Numbers: ER17-1689-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEP TX-Buckthorn Westex
Interconnection Agreement to be effective 5/8/2017.
Filed Date: 5/25/17.
Accession Number: 20170525-5189.
Comments Due: 5 p.m. ET 6/15/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings
[[Page 25282]]
can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: May 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-11270 Filed 5-31-17; 8:45 am]
BILLING CODE 6717-01-P