Archer Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 23241-23242 [2017-10368]
Download as PDF
Federal Register / Vol. 82, No. 97 / Monday, May 22, 2017 / Notices
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14831–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14831) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10371 Filed 5–19–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–438–000]
mstockstill on DSK30JT082PROD with NOTICES
Algonquin Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on May 5, 2017,
Algonquin Gas Transmission, LLC
(Algonquin), P.O. Box 1642, Houston,
Texas 77251–1642, filed in Docket No.
CP17–438–000 a prior notice request
pursuant to sections 157.205 and
157.208 of the Commission’s regulations
under the Natural Gas Act (NGA), as
amended, requesting authorization to
replace a segment of 24-inch-diameter
pipeline at a crossing of the Mystic
River with an offset located adjacent to
the existing pipeline at the confluence
of the Mystic River and Alewife Brook
(Mystic River Project). Specifically,
Algonquin proposes to install a new,
approximate 1,300-foot section of 24inch-diameter pipeline on its J–1
VerDate Sep<11>2014
23:17 May 19, 2017
Jkt 241001
System underneath the channel of the
Mystic River and Alewife Brook in
Somerville, Medford, and Arlington,
Massachusetts. Algonquin states that the
Mystic River Project will have no
impact on the certificated capacity of
Algonquin system, and there will be no
abandonment or reduction in service to
any customer of Algonquin as a result
of the project. Algonquin estimates the
cost of the Mystic River Project to be
approximately $15 million, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Lisa A.
Connolly, Director, Rates and
Certificates, Algonquin Gas
Transmission, LLC, P.O. Box 1642,
Houston, Texas 77251–1642, by
telephone at (713) 627–4102, by fax at
(713) 627–5947, or by email at
lisa.connolly@enbridge.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefor, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
23241
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
Dated: May 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10384 Filed 5–19–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1594–000]
Archer Energy, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Archer
Energy, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
E:\FR\FM\22MYN1.SGM
22MYN1
23242
Federal Register / Vol. 82, No. 97 / Monday, May 22, 2017 / Notices
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 5, 2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
mstockstill on DSK30JT082PROD with NOTICES
Dated: May 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10368 Filed 5–19–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
23:17 May 19, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14752–001]
Rivertec Partners LLC; Notice of Intent
To File License Application, Filing of
Pre-Application Document, and
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14752–001.
c. Date Filed: April 6, 2017.
d. Submitted By: Rivertec Partners
LLC.
e. Name of Project: Sherman
Hydroelectric Project.
f. Location: On the Columbia River
near Rufus in Sherman County, Oregon.
The project is located at the U.S. Corps
of Engineers’ John Day Dam Juvenile
Fish Sampling and Monitoring Facility.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mark
Steinley, Rivertec Partners LLC, 521
Thorn Street, #331, Sewickley, PA
15143; email—msteinley@
bkmcapital.com; (480) 435–0846.
i. FERC Contact: Kim Nguyen at (202)
502–6105; or email at kim.nguyen@
ferc.gov.
j. Rivertec Partners LLC filed its
request to use the Traditional Licensing
Process on April 6, 2017. Rivertec
Partners LLC provided public notice of
its request on May 8, 2017. In a letter
dated May 16, 2017, the Director of the
Division of Hydropower Licensing
approved Rivertec Partners LLC’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Oregon State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Rivertec Partners LLC as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Rivertec Partners LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: May 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–10381 Filed 5–19–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–117–000.
Applicants: Dynegy Zimmer, LLC,
Dynegy Miami Fort, LLC, The Dayton
Power and Light Company, AES Ohio
Generation, LLC.
Description: Joint Application for
Authorization of Disposition of
Jurisdictional Assets Under Section
203(a)(1) of the Federal Power Act of
Dynegy Buyers and AES Sellers.
Filed Date: 5/12/17.
Accession Number: 20170512–5219.
Comments Due: 5 p.m. ET 6/2/17.
Docket Numbers: EC17–118–000.
Applicants: Meadow Lake Wind Farm
V LLC, Quilt Block Wind Farm LLC,
Redbed Plains Wind Farm LLC.
Description: Application for
Authorization for Disposition of
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 82, Number 97 (Monday, May 22, 2017)]
[Notices]
[Pages 23241-23242]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-10368]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER17-1594-000]
Archer Energy, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Archer Energy, LLC's application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR
[[Page 23242]]
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is June 5, 2017.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Dated: May 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-10368 Filed 5-19-17; 8:45 am]
BILLING CODE 6717-01-P