Notch Butte Hydro Company, Inc., Koosh, Inc.; Notice of Transfer of Exemption, 22660 [2017-09957]
Download as PDF
nlaroche on DSK30NT082PROD with NOTICES
22660
Federal Register / Vol. 82, No. 94 / Wednesday, May 17, 2017 / Notices
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call 202–502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’; ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the non-project
use application. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
VerDate Sep<11>2014
15:18 May 16, 2017
Jkt 241001
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09943 Filed 5–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7548–021]
Notch Butte Hydro Company, Inc.,
Koosh, Inc.; Notice of Transfer of
Exemption
1. By letter filed March 15, 2017,
Notch Butte Hydro Company, Inc.
informed the Commission that the
exemption from licensing for the GeoBon #2 Hydropower Project No. 7548,
originally issued April 13, 1984 1 has
been transferred to Koosh, Inc. The
project is located on the Little Wood
River in Lincoln County, Idaho. The
transfer of an exemption does not
require Commission approval.
2. Koosh, Inc. is now the exemptee of
the Geo-Bon #2 Hydropower Project No.
7548. All correspondence should be
forwarded to: Koosh, Inc., PO Box 59,
Gooding, ID 83330.
Dated: May 11, 2017.
Kimberly D. Bose
Secretary.
[FR Doc. 2017–09957 Filed 5–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–436–000]
Colorado Interstate Gas Company,
L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on May 03, 2017,
Colorado Interstate Gas Company, L.L.C.
(‘‘CIG’’), P.O. Box 1087, Colorado
Springs, Colorado 80944, filed a prior
notice application pursuant to sections
157.205, 157.213(b) of the Federal
Energy Regulatory Commission’s
(Commission) regulations under the
Natural Gas Act (NGA), and CIG’s
blanket certificate issued in Docket No.
CP83–21–000. CIG requests
authorization to reclassify thirteen
injection/withdrawal (I/W) wells to
1 Order Granting Exemption from Licensing of a
Small Project of 5 MW or Less. Mr. George Arkoosh,
27 FERC 62,039 (1984).
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
observation wells at the Latigo Natural
Gas Storage Field (Latigo) located in
Arapahoe County, Colorado and at the
Flank Natural Gas Storage Field (Flank)
located in Baca County, Colorado, all as
more fully set forth in the request,
which is on file with the Commission
and open to public inspection. The
proposed application is referred to as
the CIG’s Well Conversion Application.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically CIG proposes to reclassify
seven (7) I/W wells at Latigo and six (6)
I/W wells at Flank to observation status.
CIG states the proposed reclassification
of these I/W wells involves no change
in the certificated physical parameters
of either storage field.
Any questions regarding this
application should be directed to
Francisco Tarin Director, Regulatory
Affairs Department, Colorado Interstate
Gas Company, L.L.C., P.O. Box 1087,
Colorado Springs, Colorado 80904 or
phone (719) 667–7517.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
E:\FR\FM\17MYN1.SGM
17MYN1
Agencies
[Federal Register Volume 82, Number 94 (Wednesday, May 17, 2017)]
[Notices]
[Page 22660]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09957]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7548-021]
Notch Butte Hydro Company, Inc., Koosh, Inc.; Notice of Transfer
of Exemption
1. By letter filed March 15, 2017, Notch Butte Hydro Company, Inc.
informed the Commission that the exemption from licensing for the Geo-
Bon #2 Hydropower Project No. 7548, originally issued April 13, 1984
\1\ has been transferred to Koosh, Inc. The project is located on the
Little Wood River in Lincoln County, Idaho. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ Order Granting Exemption from Licensing of a Small Project
of 5 MW or Less. Mr. George Arkoosh, 27 FERC 62,039 (1984).
---------------------------------------------------------------------------
2. Koosh, Inc. is now the exemptee of the Geo-Bon #2 Hydropower
Project No. 7548. All correspondence should be forwarded to: Koosh,
Inc., PO Box 59, Gooding, ID 83330.
Dated: May 11, 2017.
Kimberly D. Bose
Secretary.
[FR Doc. 2017-09957 Filed 5-16-17; 8:45 am]
BILLING CODE 6717-01-P