Reuel Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 22659 [2017-09953]
Download as PDF
Federal Register / Vol. 82, No. 94 / Wednesday, May 17, 2017 / Notices
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collection of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: May 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09944 Filed 5–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: May 11, 2017.
Kimberly D. Bose,
Secretary.
[Docket No. ER17–1577–000]
nlaroche on DSK30NT082PROD with NOTICES
Reuel Energy LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
[FR Doc. 2017–09953 Filed 5–16–17; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Reuel
Energy LLC‘s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 31,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
VerDate Sep<11>2014
15:18 May 16, 2017
Jkt 241001
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1267–119]
Greenwood County, South Carolina;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Federal Energy Regulatory
Commission and is available for public
inspection:
a. Type of Application: Non-project
use of project lands and water.
b. Project No: 1267–119.
c. Date Filed: February 15, 2017 and
supplemented on April 12, 2017.
d. Applicant: Greenwood County,
South Carolina (licensee).
e. Name of Project: Buzzards Roost
Hydroelectric Project.
f. Location: Lake Greenwood in
Laurens County, South Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Toby Chappell,
County Manager, Greenwood County,
South Carolina, 600 Monument Street,
Box P–103, Suite 10, Greenwood, South
Carolina 29646; phone (864) 942–8596.
i. FERC Contact: Ms. Joy Kurtz at 202–
502–6760, or joy.kurtz@ferc.gov.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
22659
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file motions to intervene,
protests, and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–1267–119.
k. Description of Request: The
licensee requests Commission approval
to grant Laurens County Water and
Sewer Commission permission to use
project lands and water within the
project boundary to construct a raw
water intake and raw water line on Lake
Greenwood in order to meet demands
for public drinking water. Construction
activities within the project boundary
would include installation of an intake
pipe and air burst line, placement of rip
rap along the stream bank and intake
pipe, and installation of intake
screening and supporting structures for
the screening. The through-slot velocity
at the intake screen will not exceed 0.5
feet per second. The raw water line
would leave the project boundary and
follow road right of ways to a water
treatment plant, which is not yet
constructed. Once constructed, the
facility would withdrawal up to 18
million gallons per day (mgd) from Lake
Greenwood. Of the 18 mgd withdrawn
from Lake Greenwood, up to 2.7 mgd
would be transferred to the Broad River
Basin (i.e. an ‘‘interbasin transfer’’),
pending approval from the South
Carolina Department of Health and
Environmental Control.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
202–502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
E:\FR\FM\17MYN1.SGM
17MYN1
Agencies
[Federal Register Volume 82, Number 94 (Wednesday, May 17, 2017)]
[Notices]
[Page 22659]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09953]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER17-1577-000]
Reuel Energy LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Reuel Energy LLC`s application for market-based rate authority, with an
accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is May 31, 2017.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: May 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09953 Filed 5-16-17; 8:45 am]
BILLING CODE 6717-01-P