Reuel Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 22659 [2017-09953]

Download as PDF Federal Register / Vol. 82, No. 94 / Wednesday, May 17, 2017 / Notices Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: May 10, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09944 Filed 5–16–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: May 11, 2017. Kimberly D. Bose, Secretary. [Docket No. ER17–1577–000] nlaroche on DSK30NT082PROD with NOTICES Reuel Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2017–09953 Filed 5–16–17; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding of Reuel Energy LLC‘s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 31, 2017. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the VerDate Sep<11>2014 15:18 May 16, 2017 Jkt 241001 eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1267–119] Greenwood County, South Carolina; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Federal Energy Regulatory Commission and is available for public inspection: a. Type of Application: Non-project use of project lands and water. b. Project No: 1267–119. c. Date Filed: February 15, 2017 and supplemented on April 12, 2017. d. Applicant: Greenwood County, South Carolina (licensee). e. Name of Project: Buzzards Roost Hydroelectric Project. f. Location: Lake Greenwood in Laurens County, South Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Toby Chappell, County Manager, Greenwood County, South Carolina, 600 Monument Street, Box P–103, Suite 10, Greenwood, South Carolina 29646; phone (864) 942–8596. i. FERC Contact: Ms. Joy Kurtz at 202– 502–6760, or joy.kurtz@ferc.gov. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 22659 j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–1267–119. k. Description of Request: The licensee requests Commission approval to grant Laurens County Water and Sewer Commission permission to use project lands and water within the project boundary to construct a raw water intake and raw water line on Lake Greenwood in order to meet demands for public drinking water. Construction activities within the project boundary would include installation of an intake pipe and air burst line, placement of rip rap along the stream bank and intake pipe, and installation of intake screening and supporting structures for the screening. The through-slot velocity at the intake screen will not exceed 0.5 feet per second. The raw water line would leave the project boundary and follow road right of ways to a water treatment plant, which is not yet constructed. Once constructed, the facility would withdrawal up to 18 million gallons per day (mgd) from Lake Greenwood. Of the 18 mgd withdrawn from Lake Greenwood, up to 2.7 mgd would be transferred to the Broad River Basin (i.e. an ‘‘interbasin transfer’’), pending approval from the South Carolina Department of Health and Environmental Control. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling 202–502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online E:\FR\FM\17MYN1.SGM 17MYN1

Agencies

[Federal Register Volume 82, Number 94 (Wednesday, May 17, 2017)]
[Notices]
[Page 22659]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09953]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER17-1577-000]


Reuel Energy LLC; Supplemental Notice That Initial Market-Based 
Rate Filing Includes Request for Blanket Section 204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Reuel Energy LLC`s application for market-based rate authority, with an 
accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is May 31, 2017.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: May 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09953 Filed 5-16-17; 8:45 am]
 BILLING CODE 6717-01-P