Northwest Pipeline LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed North Fork Nooksack Line Lowering Project Request for Comments on Environmental Issues, 22533-22535 [2017-09802]

Download as PDF Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices to 700 cfs; (10) a switchyard on the eastern bank of Schoharie Creek adjacent to the powerhouse; and (11) appurtenant facilities. During operation, the BlenheimGilboa Project’s pump-turbines may be turned on or off several times throughout the day, but the project typically generates electricity during the day when consumer demand is high and other power resources are more expensive. Pumping usually occurs at night and on weekends when there is excess electricity in the system available for use. According to a July 30, 1975, settlement agreement, NYPA releases a minimum flow of 10 cubic feet per second (cfs) during low-flow periods when 1,500 acre-feet of water is in storage, and 7 cfs when less than 1,500 acre-feet is in storage. For the period 2007 through 2016, the project’s average annual generation was about 374,854 megawatt-hours (MWh) and average annual energy consumption from pumping was about 540,217 MWh. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: On September 6, 2016, Commission staff issued a revised process plan and schedule with milestones and dates for the filing and review of NYPA’s remaining study reports. NYPA filed its remaining study report on February 17, 2017. The Director, Office of Energy Projects will make a final determination on the need to modify the approved study plan for the remaining study by June 18, 2017. At this time, the application is expected to be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made following the Director’s determination on the remaining study, and as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis ............................................................................................ Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ......................................................... Commission issues Draft Environmental Assessment (EA) or Environmental Impact Statement (EIS) .................................... Comments on Draft EA or EIS .................................................................................................................................................... Modified terms and conditions ..................................................................................................................................................... Commission issues Final EA or EIS ............................................................................................................................................ o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: May 9, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09799 Filed 5–15–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–133–000] sradovich on DSK3GMQ082PROD with NOTICES Northwest Pipeline LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed North Fork Nooksack Line Lowering Project Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the North Fork Nooksack Line Lowering Project (Nooksack Lowering Project or Project) involving construction and operation of facilities by Northwest Pipeline LLC (Northwest) in Whatcom VerDate Sep<11>2014 16:42 May 15, 2017 Jkt 241001 County, Washington. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before June 8, 2017. If you sent comments on this project to the Commission before the opening of this docket on April 6, 2017, you will need to refile those comments in Docket No. CP17–133–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this PO 00000 Frm 00057 Fmt 4703 22533 Sfmt 4703 June 2017. August 2017. February 2018. April 2018. June 2018. September 2018. proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. Northwest provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Public Participation For your convenience, there are three methods you can use to submit your comments to the Commission. The E:\FR\FM\16MYN1.SGM 16MYN1 22534 Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’ as the filing type; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP17–133– 000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Summary of the Proposed Project sradovich on DSK3GMQ082PROD with NOTICES Northwest proposes to remove, replace, and lower about 1,700 feet of 30-inch-diameter pipeline in the north floodplain of the North Fork Nooksack River. The project also includes removal of about 1,550 feet of previously abandoned in place 26-inch-diameter pipeline that will become exposed during the replacement of the 30-inch pipeline. The Project is located in Whatcom County, near Deming, Washington. According to Northwest the Project would: (1) ensure system reliability; (2) preserve service continuity; and 3) to comply with Whatcom County requirements to complete a long-term solution and reduce long-term impediments to facilitate future natural channel migration. The general location of the project facilities is shown in appendix 1.1 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. VerDate Sep<11>2014 16:42 May 15, 2017 Jkt 241001 Land Requirements for Construction Construction of the proposed facilities would disturb a total of about 24.3 acres of land for lowering of the 30-inch diameter pipeline and removal of 26inch-diameter pipeline. No new permanent easement would be required. Following construction, all construction work areas would be restored and revert to former uses. The pipeline corridor in the Project area includes three existing pipelines and work would be completed within its existing right-of-way. About 100 percent of the proposed pipeline route parallels its existing pipeline. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife including migratory birds; • air quality and noise; • endangered and threatened species; • public safety; and • cumulative impacts. We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our 2 We, us, and our refer to the environmental staff of the Commission’s Office of Energy Projects. PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the applicable State Historic Preservation Office (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/ pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\16MYN1.SGM 16MYN1 Federal Register / Vol. 82, No. 93 / Tuesday, May 16, 2017 / Notices project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). sradovich on DSK3GMQ082PROD with NOTICES Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an intervenor which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the Document-less Intervention Guide under the e-filing link on the Commission’s Web site. Motions to intervene are more fully described at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP17–133–000. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document VerDate Sep<11>2014 16:42 May 15, 2017 Jkt 241001 summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: May 9, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09802 Filed 5–15–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–113–000. Applicants: TigerGenCo, LLC, Red Oak Power, LLC. Description: Joint Application of TigerGenCo, LLC, et al. for Authorization Under Section 203 of the Federal Power Act and Requests for Waivers, Confidential Treatment and Expedited Action. Filed Date: 5/8/17. Accession Number: 20170508–5202. Comments Due: 5 p.m. ET 5/30/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–792–002. Applicants: New Harquahala Generating Company, LLC. Description: Compliance filing: Compliance Filing to be effective N/A. Filed Date: 5/8/17. Accession Number: 20170508–5162. Comments Due: 5 p.m. ET 5/30/17. Docket Numbers: ER16–793–002. Applicants: Talen Montana, LLC. Description: Compliance filing: Compliance Filing to be effective N/A. Filed Date: 5/8/17. Accession Number: 20170508–5159. Comments Due: 5 p.m. ET 5/30/17. Docket Numbers: ER16–795–002. Applicants: Talen Energy Marketing, LLC. Description: Compliance filing: Compliance Filing to be effective N/A. Filed Date: 5/8/17. Accession Number: 20170508–5163. Comments Due: 5 p.m. ET 5/30/17. Docket Numbers: ER16–893–002; ER15–1065 002; ER15–1066 002; ER15– 1676 002; ER16–1371 003; ER16–1990 002; ER16–892 001; ER17–239 001. Applicants: 62SK 8ME LLC,63SU 8ME LLC, Balko Wind, LLC, Balko PO 00000 Frm 00059 Fmt 4703 Sfmt 9990 22535 Wind Transmission, LLC, North Star Solar PV LLC, Red Horse III, LLC, Red Horse Wind 2, LLC, TPE Alta Luna, LLC. Description: Notice of Change in Status of the DESRI MBR Sellers. Filed Date: 5/8/17. Accession Number: 20170508–5200. Comments Due: 5 p.m. ET 5/30/17. Docket Numbers: ER17–1569–000. Applicants: ITC Great Plains, LLC. Description: § 205(d) Rate Filing: License Agreement to be effective 7/7/2017. Filed Date: 5/8/17. Accession Number: 20170508–5166. Comments Due: 5 p.m. ET 5/30/17. Docket Numbers: ER17–1570–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2017– 05–08_Energy Offer Cap Order 831 Final Rule Compliance Filing to be effective 12/1/2017. Filed Date: 5/8/17. Accession Number: 20170508–5171. Comments Due: 5 p.m. ET 5/30/17. Docket Numbers: ER17–1571–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–05–08_Operating Reserve Demand Curve revisions related to Order 831 to be effective 12/1/2017. Filed Date: 5/8/17. Accession Number: 20170508–5173. Comments Due: 5 p.m. ET 5/30/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 9, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09795 Filed 5–15–17; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\16MYN1.SGM 16MYN1

Agencies

[Federal Register Volume 82, Number 93 (Tuesday, May 16, 2017)]
[Notices]
[Pages 22533-22535]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09802]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-133-000]


Northwest Pipeline LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed North Fork Nooksack Line 
Lowering Project Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the North Fork Nooksack Line 
Lowering Project (Nooksack Lowering Project or Project) involving 
construction and operation of facilities by Northwest Pipeline LLC 
(Northwest) in Whatcom County, Washington. The Commission will use this 
EA in its decision-making process to determine whether the project is 
in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before June 8, 2017.
    If you sent comments on this project to the Commission before the 
opening of this docket on April 6, 2017, you will need to refile those 
comments in Docket No. CP17-133-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Northwest provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The

[[Page 22534]]

Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or 
FercOnlineSupport@ferc.gov. Please carefully follow these instructions 
so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP17-133-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Northwest proposes to remove, replace, and lower about 1,700 feet 
of 30-inch-diameter pipeline in the north floodplain of the North Fork 
Nooksack River. The project also includes removal of about 1,550 feet 
of previously abandoned in place 26-inch-diameter pipeline that will 
become exposed during the replacement of the 30-inch pipeline. The 
Project is located in Whatcom County, near Deming, Washington. 
According to Northwest the Project would: (1) ensure system 
reliability; (2) preserve service continuity; and 3) to comply with 
Whatcom County requirements to complete a long-term solution and reduce 
long-term impediments to facilitate future natural channel migration.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb a total of 
about 24.3 acres of land for lowering of the 30-inch diameter pipeline 
and removal of 26-inch-diameter pipeline. No new permanent easement 
would be required. Following construction, all construction work areas 
would be restored and revert to former uses. The pipeline corridor in 
the Project area includes three existing pipelines and work would be 
completed within its existing right-of-way. About 100 percent of the 
proposed pipeline route parallels its existing pipeline.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ We, us, and our refer to the environmental staff of the 
Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife including migratory birds;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for

[[Page 22535]]

project purposes, or who own homes within certain distances of 
aboveground facilities, and anyone who submits comments on the project. 
We will update the environmental mailing list as the analysis proceeds 
to ensure that we send the information related to this environmental 
review to all individuals, organizations, and government entities 
interested in and/or potentially affected by the proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an intervenor which is an official party to the Commission's 
proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are in the Document-
less Intervention Guide under the e-filing link on the Commission's Web 
site. Motions to intervene are more fully described at https://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP17-
133-000. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: May 9, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-09802 Filed 5-15-17; 8:45 am]