Watterra Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 22135-22136 [2017-09627]

Download as PDF Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P–10773–030] mstockstill on DSK30JT082PROD with NOTICES Southern Southeast Regional Aquaculture Association; Notice of Application Accepted for Filing, Ready for Environmental Analysis, Soliciting Motions To Intervene and Protests, Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of License. b. Project No.: 10773–030. c. Date Filed: October 27, 2016. d. Applicant: Southern Southeast Regional Aquaculture Association. e. Name of Project: Burnett River Hatchery Hydroelectric Project. f. Location: The project is located on the Burnett River in the Wrangell Borough of Alaska. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Bill Gass, Production Manager, Southern Southeast Regional Aquaculture Association, 14 Borch Street, Ketchikan, AK 99901, (907) 228–4390, gass@ ssraa.org. i. FERC Contact: Anumzziatta Purchiaroni, (202) 502–6191, anumzziatta.purchiaroni@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 60 days from the issuance of this notice by the Commission; reply comments are due 105 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file any comments, motions to intervene, protests, recommendations, terms and conditions, and/or fishway prescriptions using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. VerDate Sep<11>2014 17:41 May 11, 2017 Jkt 241001 The first page of any filing should include docket number P–10773–030. k. Description of Request: The licensee is proposing to install at the powerhouse an additional 140-kilowatt (kW) generating unit coupled to the existing 80-kW unit, for a combined project installed capacity of 220 kW. The new unit will result in an increase of the project’s hydraulic capacity from 6 to 15 cubic feet per second. The installation of the new unit will not require any physical changes to the project features since the powerhouse was designed to accommodate an additional generating unit. All work will occur within the existing powerhouse. The licensee is requesting the amendment to increase hatchery production at the project. l. Locations of the Applications: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. The filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document (i.e., P–10773). You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Motions to Intervene or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘MOTION TO INTERVENE’’, ‘‘PROTEST’’, ‘‘TERMS AND CONDITIONS’’ or ‘‘FISHWAY PRESCRIPTIONS’’, as applicable; (2) set PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 22135 forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, protests, recommendations, terms and conditions, or prescriptions should relate to project works which are the subject of the amendment request. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: May 8, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09676 Filed 5–11–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14818–000] Watterra Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 17, 2017, Watterra Energy, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Green River Lake Dam Hydroelectric Project (project), to be located at the existing U.S. Army Corps of Engineers’ Green River Lake Dam on the Green River near the City of Campbellsville, Taylor County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application E:\FR\FM\12MYN1.SGM 12MYN1 mstockstill on DSK30JT082PROD with NOTICES 22136 Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 706-foot-long, 8foot-diameter steel penstock lining the existing concrete conduit; (2) an 8-footlong, 8-foot-wide bifurcation structure attached to the proposed penstock, with one branch extending to the proposed powerhouse, and the other branch providing an outlet point for the release of floodwaters; (3) a 70-foot-long, 55foot-wide powerhouse containing two Francis generating units with a total capacity of 10.6 megawatts; (4) a 55foot-long, 70-foot-wide switchyard; and (5) a 21,900-foot-long, 12.7 kilovolt transmission line. The estimated annual generation of the project would be 48.6 gigawatt-hours, and would operate as directed by the U.S. Army Corps of Engineers. Applicant Contact: Mr. Craig Dalton, Watterra Energy, LLC, 220 West Main Street, Hamilton, MT 59840; phone: (406) 384–0080. FERC Contact: Navreet Deo; phone: (202) 502–6304. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14818–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14818) in the docket number field to access the VerDate Sep<11>2014 17:41 May 11, 2017 Jkt 241001 document. For assistance, contact FERC Online Support. Dated: May 5, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09627 Filed 5–11–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3279–001; ER10–3274 001; ER10–3275 001; ER10– 3277 001; ER10–3278–001. Applicants: Basin Creek Equity Partners L.L.C., Capitol District Energy Center Cogeneration Associates, Pawtucket Power Associates Limited Partnership, Forked River Power LLC, Pittsfield Generating Company, L.P. Description: Notice of Change in Status of Basin Creek Equity Partners L.L.C., et al. Filed Date: 5/1/17. Accession Number: 20170501–5519. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER13–1536–014; ER10–2178–030; ER10–2181–034; ER10–2182–033; ER10–2192–030; ER15–1537–007; ER15–1539–007. Applicants: Exelon Generation Company, LLC, Constellation Energy Commodities Group Maine, LLC, Constellation Energy Services of New York, Inc., Constellation Energy Services, Inc., Constellation NewEnergy, Inc., Nine Mile Point Nuclear Station, LLC, R.E. Ginna Nuclear Power Plant, LLC. Description: Notice of Change in Status of the Exelon MBR Entities. Filed Date: 5/1/17. Accession Number: 20170501–5500. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1543–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: TriState Construct Agmt ? Monolith Tap IC to be effective 7/5/2017. Filed Date: 5/4/17. Accession Number: 20170504–5098. Comments Due: 5 p.m. ET 5/25/17. Docket Numbers: ER17–1545–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: Cost Reimbursement Agreement (SA 2335)— NMPC and New Athens Generating Company to be effective 4/5/2017. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Filed Date: 5/5/17. Accession Number: 20170505–5039. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1547–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Queue Position AB2–061, Original Service Agreement No. 4695 to be effective 4/25/2017. Filed Date: 5/5/17. Accession Number: 20170505–5095. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1548–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Two True-Up SGIA’s Golden Springs Development Company, LLC SA Nos. 541 & 545 to be effective 7/5/2017. Filed Date: 5/5/17. Accession Number: 20170505–5121. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1549–000. Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc. Description: Application of Entergy Services, Inc., on behalf of the Entergy Operating Companies for 2016 Transmission Formula Rate for PostRetirement Benefits Other than Pensions. Filed Date: 5/1/17. Accession Number: 20170501–5526. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1550–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to SA Nos. 3071 and 3072; Queue No. U1–059 and W1–056 re: Assignment to be effective 8/30/2011. Filed Date: 5/5/17. Accession Number: 20170505–5128. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1551–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Amendment to Rate Schedule No. 286— 4CA Participant Services Agreement to be effective 7/6/2017. Filed Date: 5/5/17. Accession Number: 20170505–5148. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1552–000. Applicants: West Penn Power Company, Monongahela Power Company, Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: West Penn et al submits revised Interconnection Agreement 1395 to be effective 6/1/2017. E:\FR\FM\12MYN1.SGM 12MYN1

Agencies

[Federal Register Volume 82, Number 91 (Friday, May 12, 2017)]
[Notices]
[Pages 22135-22136]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09627]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14818-000]


Watterra Energy, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments and Motions To Intervene

    On January 17, 2017, Watterra Energy, LLC filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Green River Lake Dam 
Hydroelectric Project (project), to be located at the existing U.S. 
Army Corps of Engineers' Green River Lake Dam on the Green River near 
the City of Campbellsville, Taylor County, Kentucky. The sole purpose 
of a preliminary permit, if issued, is to grant the permit holder 
priority to file a license application

[[Page 22136]]

during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A 706-
foot-long, 8-foot-diameter steel penstock lining the existing concrete 
conduit; (2) an 8-foot-long, 8-foot-wide bifurcation structure attached 
to the proposed penstock, with one branch extending to the proposed 
powerhouse, and the other branch providing an outlet point for the 
release of floodwaters; (3) a 70-foot-long, 55-foot-wide powerhouse 
containing two Francis generating units with a total capacity of 10.6 
megawatts; (4) a 55-foot-long, 70-foot-wide switchyard; and (5) a 
21,900-foot-long, 12.7 kilovolt transmission line. The estimated annual 
generation of the project would be 48.6 gigawatt-hours, and would 
operate as directed by the U.S. Army Corps of Engineers.
    Applicant Contact: Mr. Craig Dalton, Watterra Energy, LLC, 220 West 
Main Street, Hamilton, MT 59840; phone: (406) 384-0080.
    FERC Contact: Navreet Deo; phone: (202) 502-6304.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14818-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14818) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09627 Filed 5-11-17; 8:45 am]