Flambeau Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 22137-22139 [2017-09624]
Download as PDF
Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices
Filed Date: 5/5/17.
Accession Number: 20170505–5149.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1553–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing: DEPFayetteville RS No. 184 Revised PPA to
be effective 7/1/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5150.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1554–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing:
Open Access Transmission Tariff
Housekeeping Revisions to be effective
5/8/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5152.
Comments Due: 5 p.m. ET 5/26/17.
Take notice that the Commission
received the following qualifying
facility filings:
mstockstill on DSK30JT082PROD with NOTICES
Docket Numbers: QF16–823–000.
Applicants: Gloversville-Johnstown
Joint Wastewater.
Description: Refund Report of
Gloversville-Johnstown Joint
Wastewater Treatment Facility.
Filed Date: 5/1/17.
Accession Number: 20170501–5492.
Comments Due: 5 p.m. ET 5/22/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09622 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:41 May 11, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14837–000]
Advanced Hydropower, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 24, 2017, Advanced
Hydropower, Inc. filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the McNary Dam Advanced
Hydropower Project (project) to be
located at U.S. Corps of Engineer’s
(Corps) McNary Dam near Plymouth in
Benton County, Washington and
Umatilla in Umatilla County, Oregon.
The purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would use the
Corps’ existing spillway bays 1 and 2 at
the McNary Dam, and would consist of
the following new facilities: (1) A 110foot-wide, 440-foot-high intake channel
with gates and trash racks from the
existing spillway bays 1 and 2 of the
McNary Dam spillway; (2) a 38-footwide, 40-foot-high, 50-foot-long
concrete penstock; (3) a 49-megawatt
Alden turbine; (4) a draft tube
discharging flows to the existing
tailrace; (5) a 1.5-mile-long, 13.8- or 23kilovolt transmission line
interconnecting with the existing
McNary Dam switchyard; and (6)
appurtenant facilities.1 The estimated
annual generation of the project would
be 190 gigawatt-hours.
Applicant Contact: Mr. Kurt Ross,
Advanced Hydropower, Inc., 925
1 In a letter filed on April 11, 2017, the Corps
states it believes the Commission lacks jurisdiction
over hydropower development at the McNary Dam.
However, the Corps also states it does not oppose
the issuance of a preliminary permit on operational
grounds despite noting several potential concerns
with the proposal. Compare Advanced Hydropower,
Inc., 155 FERC ¶ 61,007 (2016) (denying
preliminary permit application following Corps’
February 8, 2016 comments opposing the project)
and Loxbridge Partners, LLC, 156 FERC ¶ 62,163
(2016) (denying preliminary permit application
following Corps’ August 2, 2016 comments
opposing the project and requesting that staff reject
the permit application), with Rivertec Partners, LLC,
156 FERC ¶ 62,060 (2016) (issuing preliminary
permit following Corps’ April 13, 2016 comments
that it has no objections to the permit application).
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
22137
Fairgrounds Road, Goldendale,
Washington 98620; phone: (509) 773–
5650.
FERC Contact: Kim Nguyen; phone:
(202) 502–6105.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14837–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14837) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09677 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2684–010]
Flambeau Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
E:\FR\FM\12MYN1.SGM
12MYN1
22138
Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices
mstockstill on DSK30JT082PROD with NOTICES
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2684–010.
c. Date Filed: April 26, 2017.
d. Applicant: Flambeau Hydro, LLC
(Flambeau Hydro).
e. Name of Project: Arpin
Hydroelectric Project.
f. Location: On the Chippewa River in
Sawyer County, Wisconsin. There are
no federal or tribal lands within the
project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jason
Kreuscher, Renewable World Energies,
LLC, 100 State Street, P.O. Box 264,
Neshkoro, WI 54960; (855) 994–9376,
ext. 102.
i. FERC Contact: Amy Chang, (202)
502–8250 or amy.chang@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of the
Commission’s regulations, if any
resource agency, Indian Tribe, or person
believes that an additional scientific
study should be conducted in order to
form an adequate factual basis for a
complete analysis of the application on
its merit, the resource agency, Indian
Tribe, or person must file a request for
a study with the Commission not later
than 60 days from the date of filing of
the application, and serve a copy of the
request on the applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: June 25, 2017.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–2684–010.
m. This application is not ready for
environmental analysis at this time.
n. The existing Arpin Hydroelectric
Project consists of: (1) A 742.5-foot-long
masonry dam (West dam) that includes:
(a) A 120.5-foot-long ungated, nonoverflow section; (b) a 318.9-foot-long
overflow spillway with a crest elevation
of 1,227.55 feet North American Vertical
Datum of 1988 (NAVD 88); and (c) a
303.1-foot long gated section that
includes a 16.9-foot-wide timber stoplog
spillway and a 15.9-foot-wide timber
stoplog spillway; (2) a 452.2-foot-long
masonry dam (Middle dam) that
includes: (a) A 63.5-foot-long ungated,
non-overflow section; (b) a 237.9-footlong overflow spillway with a crest
elevation of 1,227.65 feet NAVD 88; and
(c) a 150.8-foot-long gated section that
includes two 19.5-foot-wide steel
vertical lift gates; (3) a 319.8-foot-long
masonry dam (East dam) that includes:
(a) A 25.5-foot long ungated, nonoverflow section; (b) a 108-foot-long
overflow spillway with a crest elevation
of 1,227.8 feet NAVD 88; and (c) a
186.3-foot-long gated section that
includes a 15.9-foot-wide, 6.25-foot-tall
tainter gate and a 16.3-foot-wide, 6.25foot-tall tainter gate; (4) a 294-acre
impoundment with a normal maximum
elevation of 1,227.32 feet NAVD 88; (5)
a 3,200-foot-long, 60-foot-wide, 9- to 14foot-deep earthen embankment power
canal that includes 37-foot-long, 11.5foot-wide, 14-foot-deep headworks; (6) a
48-foot-long, 13.5-foot-wide, 14.5-foottall concrete forebay and intake area that
includes inclined trash racks with 2inch spacing and three metal slide gates;
(7) a 79-foot-long, 7-foot-diameter steel
penstock and two 79-foot-long, 8-footdiameter steel penstocks, each
dedicated to a single turbine-generator
unit; (8) a 52-foot-wide, 24-foot-long, 25foot-tall cement block powerhouse
containing two 600-kilowatt (kW) and
one 250-kW vertical Francis turbinegenerator units for a total capacity of
1,450-kW; (9) a 15-foot-long, 2.4-kilovolt
(kV) underground generator lead that
connects the turbine-generator units to
three step-up transformers; (10) a 3,645foot-long, 22.9-kV overhead
transmission line that connects the stepup transformers to the regional
distribution line; and (11) appurtenant
facilities.
Flambeau Hydro operates the project
in a run-of-river mode with an annual
average generation of approximately
7,336 megawatt-hours. Flambeau Hydro
is not proposing any new project
facilities or changes in project
operation.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary) ......................................................................................................
Request Additional Information ...............................................................................................................
Issue Acceptance Letter ............................................................................................................................
Issue Scoping Document 1 for comments ...............................................................................................
Request Additional Information (if necessary) .......................................................................................
Issue Scoping Document 2 .......................................................................................................................
Issue notice of ready for environmental analysis ...................................................................................
Commission issues EA or draft EA ..........................................................................................................
Comments on EA or draft EA ...................................................................................................................
Commission issues final EA .....................................................................................................................
VerDate Sep<11>2014
17:41 May 11, 2017
Jkt 241001
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
E:\FR\FM\12MYN1.SGM
July 2017.
July 2017.
October 2017.
October 2017.
December 2017.
January 2018.
March 2018.
September 2018.
October 2018.
January 2019.
12MYN1
Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09624 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK30JT082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–80–000.
Applicants: Ebensburg Power
Company, Babcock & Wilcox Ebensburg
Power, LLC, Ebensburg Investors
Limited Partnership.
Description: Supplement to February
16, 2017 Application for Authorization
of Disposition of Jurisdictional Facilities
under Section 203 of the Federal Power
Act of Ebensburg Power Company, et al.
Filed Date: 5/3/17.
Accession Number: 20170503–5163.
Comments Due: 5 p.m. ET 5/15/17.
Docket Numbers: EC17–110–000.
Applicants: U.S. Gas & Electric, Inc.,
Energy Services Providers, Inc.,
Massachusetts Gas & Electric, Inc.,
Connecticut Gas & Electric, Inc., Equus
Total Return, Inc.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Waivers, Confidential Treatment and
Expedited Action of U.S. Gas & Electric,
Inc., et al.
Filed Date: 4/28/17.
Accession Number: 20170428–5620.
Comments Due: 5 p.m. ET 5/19/17.
Docket Numbers: EC17–111–000.
Applicants: CSOLAR IV West, LLC.
Description: Application of CSOLAR
IV West, LLC for Approval Under
Section 203 of the Federal Power Act
and Request for Expedited Action.
Filed Date: 5/1/17.
Accession Number: 20170501–5436.
Comments Due: 5 p.m. ET 5/22/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–453–007.
Applicants: Northeast Transmission
Development, LLC, PJM
Interconnection, L.L.C.
Description: Compliance filing: NTD
submits compliance filing to Order
VerDate Sep<11>2014
17:41 May 11, 2017
Jkt 241001
issued April 6, 2017 re: NTD Formula
Rate to be effective 2/1/2016.
Filed Date: 5/3/17.
Accession Number: 20170503–5128.
Comments Due: 5 p.m. ET 5/24/17.
Docket Numbers: ER17–1160–001.
Applicants: Entergy Arkansas, Inc.
Description: Tariff Amendment: EAI
MSS–4 Amended PPAs to be effective 5/
9/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5096.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17–1324–001.
Applicants: Playa Solar 2, LLC.
Description: Tariff Amendment:
Amendment to MBR Tariff Application
to be effective 3/29/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5068.
Comments Due: 5 p.m. ET 5/15/17.
Docket Numbers: ER17–1536–000.
Applicants: Southern Power
Company.
Description: Petition for Limited
Waiver of Southern Power Company
and Request for Shortened Comment
Period and Expedited Action.
Filed Date: 5/3/17.
Accession Number: 20170503–5170.
Comments Due: 5 p.m. ET 5/10/17.
Docket Numbers: ER17–1537–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–Tex–La SPP PSA 456 Change
to be effective 5/15/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5062.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17–1538–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–Tex–La ERCOT PSA 456
Change to be effective 5/15/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5064.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17–1539–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–ETEC PSA 456 Change to be
effective 5/15/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5065.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17–1540–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–NTEC PSA 456 Change to be
effective 5/15/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5066.
Comments Due: 5 p.m. ET 5/25/17.
PO 00000
Frm 00043
Fmt 4703
Sfmt 9990
22139
Docket Numbers: ER17–1541–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO–ETEC–NTEC PSA 456 Change
to be effective 5/15/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5067.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17–1542–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: § 205(d) Rate Filing:
Market Rule 1 Revisions to Cap Offers
from Fast-Start Resources to be effective
7/3/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5094.
Comments Due: 5 p.m. ET 5/25/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–32–000.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Golden Spread Electric Cooperative, Inc.
Filed Date: 5/1/17.
Accession Number: 20170501–5435.
Comments Due: 5 p.m. ET 5/22/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
Time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09681 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\12MYN1.SGM
12MYN1
Agencies
[Federal Register Volume 82, Number 91 (Friday, May 12, 2017)]
[Notices]
[Pages 22137-22139]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09624]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2684-010]
Flambeau Hydro, LLC; Notice of Application Tendered for Filing
With the Commission and Establishing Procedural Schedule for Licensing
and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
[[Page 22138]]
a. Type of Application: Subsequent Minor License.
b. Project No.: 2684-010.
c. Date Filed: April 26, 2017.
d. Applicant: Flambeau Hydro, LLC (Flambeau Hydro).
e. Name of Project: Arpin Hydroelectric Project.
f. Location: On the Chippewa River in Sawyer County, Wisconsin.
There are no federal or tribal lands within the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Jason Kreuscher, Renewable World
Energies, LLC, 100 State Street, P.O. Box 264, Neshkoro, WI 54960;
(855) 994-9376, ext. 102.
i. FERC Contact: Amy Chang, (202) 502-8250 or amy.chang@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of the Commission's regulations,
if any resource agency, Indian Tribe, or person believes that an
additional scientific study should be conducted in order to form an
adequate factual basis for a complete analysis of the application on
its merit, the resource agency, Indian Tribe, or person must file a
request for a study with the Commission not later than 60 days from the
date of filing of the application, and serve a copy of the request on
the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: June 25, 2017.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-2684-010.
m. This application is not ready for environmental analysis at this
time.
n. The existing Arpin Hydroelectric Project consists of: (1) A
742.5-foot-long masonry dam (West dam) that includes: (a) A 120.5-foot-
long ungated, non-overflow section; (b) a 318.9-foot-long overflow
spillway with a crest elevation of 1,227.55 feet North American
Vertical Datum of 1988 (NAVD 88); and (c) a 303.1-foot long gated
section that includes a 16.9-foot-wide timber stoplog spillway and a
15.9-foot-wide timber stoplog spillway; (2) a 452.2-foot-long masonry
dam (Middle dam) that includes: (a) A 63.5-foot-long ungated, non-
overflow section; (b) a 237.9-foot-long overflow spillway with a crest
elevation of 1,227.65 feet NAVD 88; and (c) a 150.8-foot-long gated
section that includes two 19.5-foot-wide steel vertical lift gates; (3)
a 319.8-foot-long masonry dam (East dam) that includes: (a) A 25.5-foot
long ungated, non-overflow section; (b) a 108-foot-long overflow
spillway with a crest elevation of 1,227.8 feet NAVD 88; and (c) a
186.3-foot-long gated section that includes a 15.9-foot-wide, 6.25-
foot-tall tainter gate and a 16.3-foot-wide, 6.25-foot-tall tainter
gate; (4) a 294-acre impoundment with a normal maximum elevation of
1,227.32 feet NAVD 88; (5) a 3,200-foot-long, 60-foot-wide, 9- to 14-
foot-deep earthen embankment power canal that includes 37-foot-long,
11.5-foot-wide, 14-foot-deep headworks; (6) a 48-foot-long, 13.5-foot-
wide, 14.5-foot-tall concrete forebay and intake area that includes
inclined trash racks with 2-inch spacing and three metal slide gates;
(7) a 79-foot-long, 7-foot-diameter steel penstock and two 79-foot-
long, 8-foot-diameter steel penstocks, each dedicated to a single
turbine-generator unit; (8) a 52-foot-wide, 24-foot-long, 25-foot-tall
cement block powerhouse containing two 600-kilowatt (kW) and one 250-kW
vertical Francis turbine-generator units for a total capacity of 1,450-
kW; (9) a 15-foot-long, 2.4-kilovolt (kV) underground generator lead
that connects the turbine-generator units to three step-up
transformers; (10) a 3,645-foot-long, 22.9-kV overhead transmission
line that connects the step-up transformers to the regional
distribution line; and (11) appurtenant facilities.
Flambeau Hydro operates the project in a run-of-river mode with an
annual average generation of approximately 7,336 megawatt-hours.
Flambeau Hydro is not proposing any new project facilities or changes
in project operation.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)......... July 2017.
Request Additional Information................. July 2017.
Issue Acceptance Letter........................ October 2017.
Issue Scoping Document 1 for comments.......... October 2017.
Request Additional Information (if necessary).. December 2017.
Issue Scoping Document 2....................... January 2018.
Issue notice of ready for environmental March 2018.
analysis.
Commission issues EA or draft EA............... September 2018.
Comments on EA or draft EA..................... October 2018.
Commission issues final EA..................... January 2019.
[[Page 22139]]
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09624 Filed 5-11-17; 8:45 am]
BILLING CODE 6717-01-P