Download as PDF mstockstill on DSK30JT082PROD with NOTICES 22136 Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 706-foot-long, 8foot-diameter steel penstock lining the existing concrete conduit; (2) an 8-footlong, 8-foot-wide bifurcation structure attached to the proposed penstock, with one branch extending to the proposed powerhouse, and the other branch providing an outlet point for the release of floodwaters; (3) a 70-foot-long, 55foot-wide powerhouse containing two Francis generating units with a total capacity of 10.6 megawatts; (4) a 55foot-long, 70-foot-wide switchyard; and (5) a 21,900-foot-long, 12.7 kilovolt transmission line. The estimated annual generation of the project would be 48.6 gigawatt-hours, and would operate as directed by the U.S. Army Corps of Engineers. Applicant Contact: Mr. Craig Dalton, Watterra Energy, LLC, 220 West Main Street, Hamilton, MT 59840; phone: (406) 384–0080. FERC Contact: Navreet Deo; phone: (202) 502–6304. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14818–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14818) in the docket number field to access the VerDate Sep<11>2014 17:41 May 11, 2017 Jkt 241001 document. For assistance, contact FERC Online Support. Dated: May 5, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09627 Filed 5–11–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3279–001; ER10–3274 001; ER10–3275 001; ER10– 3277 001; ER10–3278–001. Applicants: Basin Creek Equity Partners L.L.C., Capitol District Energy Center Cogeneration Associates, Pawtucket Power Associates Limited Partnership, Forked River Power LLC, Pittsfield Generating Company, L.P. Description: Notice of Change in Status of Basin Creek Equity Partners L.L.C., et al. Filed Date: 5/1/17. Accession Number: 20170501–5519. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER13–1536–014; ER10–2178–030; ER10–2181–034; ER10–2182–033; ER10–2192–030; ER15–1537–007; ER15–1539–007. Applicants: Exelon Generation Company, LLC, Constellation Energy Commodities Group Maine, LLC, Constellation Energy Services of New York, Inc., Constellation Energy Services, Inc., Constellation NewEnergy, Inc., Nine Mile Point Nuclear Station, LLC, R.E. Ginna Nuclear Power Plant, LLC. Description: Notice of Change in Status of the Exelon MBR Entities. Filed Date: 5/1/17. Accession Number: 20170501–5500. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1543–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: TriState Construct Agmt ? Monolith Tap IC to be effective 7/5/2017. Filed Date: 5/4/17. Accession Number: 20170504–5098. Comments Due: 5 p.m. ET 5/25/17. Docket Numbers: ER17–1545–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: Cost Reimbursement Agreement (SA 2335)— NMPC and New Athens Generating Company to be effective 4/5/2017. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Filed Date: 5/5/17. Accession Number: 20170505–5039. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1547–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Queue Position AB2–061, Original Service Agreement No. 4695 to be effective 4/25/2017. Filed Date: 5/5/17. Accession Number: 20170505–5095. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1548–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Two True-Up SGIA’s Golden Springs Development Company, LLC SA Nos. 541 & 545 to be effective 7/5/2017. Filed Date: 5/5/17. Accession Number: 20170505–5121. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1549–000. Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc. Description: Application of Entergy Services, Inc., on behalf of the Entergy Operating Companies for 2016 Transmission Formula Rate for PostRetirement Benefits Other than Pensions. Filed Date: 5/1/17. Accession Number: 20170501–5526. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1550–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to SA Nos. 3071 and 3072; Queue No. U1–059 and W1–056 re: Assignment to be effective 8/30/2011. Filed Date: 5/5/17. Accession Number: 20170505–5128. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1551–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Amendment to Rate Schedule No. 286— 4CA Participant Services Agreement to be effective 7/6/2017. Filed Date: 5/5/17. Accession Number: 20170505–5148. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1552–000. Applicants: West Penn Power Company, Monongahela Power Company, Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: West Penn et al submits revised Interconnection Agreement 1395 to be effective 6/1/2017. E:\FR\FM\12MYN1.SGM 12MYN1 Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices Filed Date: 5/5/17. Accession Number: 20170505–5149. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1553–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEPFayetteville RS No. 184 Revised PPA to be effective 7/1/2017. Filed Date: 5/5/17. Accession Number: 20170505–5150. Comments Due: 5 p.m. ET 5/26/17. Docket Numbers: ER17–1554–000. Applicants: Puget Sound Energy, Inc. Description: § 205(d) Rate Filing: Open Access Transmission Tariff Housekeeping Revisions to be effective 5/8/2017. Filed Date: 5/5/17. Accession Number: 20170505–5152. Comments Due: 5 p.m. ET 5/26/17. Take notice that the Commission received the following qualifying facility filings: mstockstill on DSK30JT082PROD with NOTICES Docket Numbers: QF16–823–000. Applicants: Gloversville-Johnstown Joint Wastewater. Description: Refund Report of Gloversville-Johnstown Joint Wastewater Treatment Facility. Filed Date: 5/1/17. Accession Number: 20170501–5492. Comments Due: 5 p.m. ET 5/22/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 5, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09622 Filed 5–11–17; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:41 May 11, 2017 Jkt 241001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14837–000] Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 24, 2017, Advanced Hydropower, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the McNary Dam Advanced Hydropower Project (project) to be located at U.S. Corps of Engineer’s (Corps) McNary Dam near Plymouth in Benton County, Washington and Umatilla in Umatilla County, Oregon. The purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would use the Corps’ existing spillway bays 1 and 2 at the McNary Dam, and would consist of the following new facilities: (1) A 110foot-wide, 440-foot-high intake channel with gates and trash racks from the existing spillway bays 1 and 2 of the McNary Dam spillway; (2) a 38-footwide, 40-foot-high, 50-foot-long concrete penstock; (3) a 49-megawatt Alden turbine; (4) a draft tube discharging flows to the existing tailrace; (5) a 1.5-mile-long, 13.8- or 23kilovolt transmission line interconnecting with the existing McNary Dam switchyard; and (6) appurtenant facilities.1 The estimated annual generation of the project would be 190 gigawatt-hours. Applicant Contact: Mr. Kurt Ross, Advanced Hydropower, Inc., 925 1 In a letter filed on April 11, 2017, the Corps states it believes the Commission lacks jurisdiction over hydropower development at the McNary Dam. However, the Corps also states it does not oppose the issuance of a preliminary permit on operational grounds despite noting several potential concerns with the proposal. Compare Advanced Hydropower, Inc., 155 FERC ¶ 61,007 (2016) (denying preliminary permit application following Corps’ February 8, 2016 comments opposing the project) and Loxbridge Partners, LLC, 156 FERC ¶ 62,163 (2016) (denying preliminary permit application following Corps’ August 2, 2016 comments opposing the project and requesting that staff reject the permit application), with Rivertec Partners, LLC, 156 FERC ¶ 62,060 (2016) (issuing preliminary permit following Corps’ April 13, 2016 comments that it has no objections to the permit application). PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 22137 Fairgrounds Road, Goldendale, Washington 98620; phone: (509) 773– 5650. FERC Contact: Kim Nguyen; phone: (202) 502–6105. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14837–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14837) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 8, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09677 Filed 5–11–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2684–010] Flambeau Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. E:\FR\FM\12MYN1.SGM 12MYN1

Agencies

[Federal Register Volume 82, Number 91 (Friday, May 12, 2017)]
[Notices]
[Pages 22136-22137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09622]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-3279-001; ER10-3274 001; ER10-3275 001; ER10-
3277 001; ER10-3278-001.
    Applicants: Basin Creek Equity Partners L.L.C., Capitol District 
Energy Center Cogeneration Associates, Pawtucket Power Associates 
Limited Partnership, Forked River Power LLC, Pittsfield Generating 
Company, L.P.
    Description: Notice of Change in Status of Basin Creek Equity 
Partners L.L.C., et al.
    Filed Date: 5/1/17.
    Accession Number: 20170501-5519.
    Comments Due: 5 p.m. ET 5/22/17.

    Docket Numbers: ER13-1536-014; ER10-2178-030; ER10-2181-034; ER10-
2182-033; ER10-2192-030; ER15-1537-007; ER15-1539-007.
    Applicants: Exelon Generation Company, LLC, Constellation Energy 
Commodities Group Maine, LLC, Constellation Energy Services of New 
York, Inc., Constellation Energy Services, Inc., Constellation 
NewEnergy, Inc., Nine Mile Point Nuclear Station, LLC, R.E. Ginna 
Nuclear Power Plant, LLC.
    Description: Notice of Change in Status of the Exelon MBR Entities.
    Filed Date: 5/1/17.
    Accession Number: 20170501-5500.
    Comments Due: 5 p.m. ET 5/22/17.

    Docket Numbers: ER17-1543-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: Tri-State Construct Agmt ? 
Monolith Tap IC to be effective 7/5/2017.
    Filed Date: 5/4/17.
    Accession Number: 20170504-5098.
    Comments Due: 5 p.m. ET 5/25/17.

    Docket Numbers: ER17-1545-000.
    Applicants: Niagara Mohawk Power Corporation, New York Independent 
System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: Cost Reimbursement Agreement 
(SA 2335)--NMPC and New Athens Generating Company to be effective 4/5/
2017.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5039.
    Comments Due: 5 p.m. ET 5/26/17.

    Docket Numbers: ER17-1547-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Queue Position AB2-061, 
Original Service Agreement No. 4695 to be effective 4/25/2017.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5095.
    Comments Due: 5 p.m. ET 5/26/17.

    Docket Numbers: ER17-1548-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: Two True-Up SGIA's Golden 
Springs Development Company, LLC SA Nos. 541 & 545 to be effective 7/5/
2017.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5121.
    Comments Due: 5 p.m. ET 5/26/17.

    Docket Numbers: ER17-1549-000.
    Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy 
Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc.
    Description: Application of Entergy Services, Inc., on behalf of 
the Entergy Operating Companies for 2016 Transmission Formula Rate for 
Post-Retirement Benefits Other than Pensions.
    Filed Date: 5/1/17.
    Accession Number: 20170501-5526.
    Comments Due: 5 p.m. ET 5/22/17.

    Docket Numbers: ER17-1550-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to SA Nos. 3071 
and 3072; Queue No. U1-059 and W1-056 re: Assignment to be effective 8/
30/2011.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5128.
    Comments Due: 5 p.m. ET 5/26/17.

    Docket Numbers: ER17-1551-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Amendment to Rate Schedule 
No. 286--4CA Participant Services Agreement to be effective 7/6/2017.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5148.
    Comments Due: 5 p.m. ET 5/26/17.

    Docket Numbers: ER17-1552-000.
    Applicants: West Penn Power Company, Monongahela Power Company, 
Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: West Penn et al submits 
revised Interconnection Agreement 1395 to be effective 6/1/2017.

[[Page 22137]]

    Filed Date: 5/5/17.
    Accession Number: 20170505-5149.
    Comments Due: 5 p.m. ET 5/26/17.
    Docket Numbers: ER17-1553-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Sec.  205(d) Rate Filing: DEP-Fayetteville RS No. 184 
Revised PPA to be effective 7/1/2017.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5150.
    Comments Due: 5 p.m. ET 5/26/17.

    Docket Numbers: ER17-1554-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Sec.  205(d) Rate Filing: Open Access Transmission 
Tariff Housekeeping Revisions to be effective 5/8/2017.
    Filed Date: 5/5/17.
    Accession Number: 20170505-5152.
    Comments Due: 5 p.m. ET 5/26/17.

    Take notice that the Commission received the following qualifying 
facility filings:

    Docket Numbers: QF16-823-000.
    Applicants: Gloversville-Johnstown Joint Wastewater.
    Description: Refund Report of Gloversville-Johnstown Joint 
Wastewater Treatment Facility.
    Filed Date: 5/1/17.
    Accession Number: 20170501-5492.
    Comments Due: 5 p.m. ET 5/22/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 5, 2017.
Kimberly D. Bose,