22136
Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 706-foot-long, 8foot-diameter steel penstock lining the
existing concrete conduit; (2) an 8-footlong, 8-foot-wide bifurcation structure
attached to the proposed penstock, with
one branch extending to the proposed
powerhouse, and the other branch
providing an outlet point for the release
of floodwaters; (3) a 70-foot-long, 55foot-wide powerhouse containing two
Francis generating units with a total
capacity of 10.6 megawatts; (4) a 55foot-long, 70-foot-wide switchyard; and
(5) a 21,900-foot-long, 12.7 kilovolt
transmission line. The estimated annual
generation of the project would be 48.6
gigawatt-hours, and would operate as
directed by the U.S. Army Corps of
Engineers.
Applicant Contact: Mr. Craig Dalton,
Watterra Energy, LLC, 220 West Main
Street, Hamilton, MT 59840; phone:
(406) 384–0080.
FERC Contact: Navreet Deo; phone:
(202) 502–6304.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14818–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14818) in
the docket number field to access the
VerDate Sep<11>2014
17:41 May 11, 2017
Jkt 241001
document. For assistance, contact FERC
Online Support.
Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09627 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3279–001;
ER10–3274 001; ER10–3275 001; ER10–
3277 001; ER10–3278–001.
Applicants: Basin Creek Equity
Partners L.L.C., Capitol District Energy
Center Cogeneration Associates,
Pawtucket Power Associates Limited
Partnership, Forked River Power LLC,
Pittsfield Generating Company, L.P.
Description: Notice of Change in
Status of Basin Creek Equity Partners
L.L.C., et al.
Filed Date: 5/1/17.
Accession Number: 20170501–5519.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER13–1536–014;
ER10–2178–030; ER10–2181–034;
ER10–2182–033; ER10–2192–030;
ER15–1537–007; ER15–1539–007.
Applicants: Exelon Generation
Company, LLC, Constellation Energy
Commodities Group Maine, LLC,
Constellation Energy Services of New
York, Inc., Constellation Energy
Services, Inc., Constellation NewEnergy,
Inc., Nine Mile Point Nuclear Station,
LLC, R.E. Ginna Nuclear Power Plant,
LLC.
Description: Notice of Change in
Status of the Exelon MBR Entities.
Filed Date: 5/1/17.
Accession Number: 20170501–5500.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1543–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: TriState Construct Agmt ? Monolith Tap IC
to be effective 7/5/2017.
Filed Date: 5/4/17.
Accession Number: 20170504–5098.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17–1545–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: Cost
Reimbursement Agreement (SA 2335)—
NMPC and New Athens Generating
Company to be effective 4/5/2017.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Filed Date: 5/5/17.
Accession Number: 20170505–5039.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1547–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Queue Position AB2–061, Original
Service Agreement No. 4695 to be
effective 4/25/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5095.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1548–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: Two
True-Up SGIA’s Golden Springs
Development Company, LLC SA Nos.
541 & 545 to be effective 7/5/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5121.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1549–000.
Applicants: Entergy Arkansas, Inc.,
Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans,
Inc., Entergy Texas, Inc.
Description: Application of Entergy
Services, Inc., on behalf of the Entergy
Operating Companies for 2016
Transmission Formula Rate for PostRetirement Benefits Other than
Pensions.
Filed Date: 5/1/17.
Accession Number: 20170501–5526.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1550–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to SA Nos. 3071 and 3072;
Queue No. U1–059 and W1–056 re:
Assignment to be effective 8/30/2011.
Filed Date: 5/5/17.
Accession Number: 20170505–5128.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1551–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule No. 286—
4CA Participant Services Agreement to
be effective 7/6/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5148.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1552–000.
Applicants: West Penn Power
Company, Monongahela Power
Company, Trans-Allegheny Interstate
Line Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: West
Penn et al submits revised
Interconnection Agreement 1395 to be
effective 6/1/2017.
E:\FR\FM\12MYN1.SGM
12MYN1
Federal Register / Vol. 82, No. 91 / Friday, May 12, 2017 / Notices
Filed Date: 5/5/17.
Accession Number: 20170505–5149.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1553–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing: DEPFayetteville RS No. 184 Revised PPA to
be effective 7/1/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5150.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17–1554–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing:
Open Access Transmission Tariff
Housekeeping Revisions to be effective
5/8/2017.
Filed Date: 5/5/17.
Accession Number: 20170505–5152.
Comments Due: 5 p.m. ET 5/26/17.
Take notice that the Commission
received the following qualifying
facility filings:
mstockstill on DSK30JT082PROD with NOTICES
Docket Numbers: QF16–823–000.
Applicants: Gloversville-Johnstown
Joint Wastewater.
Description: Refund Report of
Gloversville-Johnstown Joint
Wastewater Treatment Facility.
Filed Date: 5/1/17.
Accession Number: 20170501–5492.
Comments Due: 5 p.m. ET 5/22/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09622 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:41 May 11, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14837–000]
Advanced Hydropower, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 24, 2017, Advanced
Hydropower, Inc. filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the McNary Dam Advanced
Hydropower Project (project) to be
located at U.S. Corps of Engineer’s
(Corps) McNary Dam near Plymouth in
Benton County, Washington and
Umatilla in Umatilla County, Oregon.
The purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would use the
Corps’ existing spillway bays 1 and 2 at
the McNary Dam, and would consist of
the following new facilities: (1) A 110foot-wide, 440-foot-high intake channel
with gates and trash racks from the
existing spillway bays 1 and 2 of the
McNary Dam spillway; (2) a 38-footwide, 40-foot-high, 50-foot-long
concrete penstock; (3) a 49-megawatt
Alden turbine; (4) a draft tube
discharging flows to the existing
tailrace; (5) a 1.5-mile-long, 13.8- or 23kilovolt transmission line
interconnecting with the existing
McNary Dam switchyard; and (6)
appurtenant facilities.1 The estimated
annual generation of the project would
be 190 gigawatt-hours.
Applicant Contact: Mr. Kurt Ross,
Advanced Hydropower, Inc., 925
1 In a letter filed on April 11, 2017, the Corps
states it believes the Commission lacks jurisdiction
over hydropower development at the McNary Dam.
However, the Corps also states it does not oppose
the issuance of a preliminary permit on operational
grounds despite noting several potential concerns
with the proposal. Compare Advanced Hydropower,
Inc., 155 FERC ¶ 61,007 (2016) (denying
preliminary permit application following Corps’
February 8, 2016 comments opposing the project)
and Loxbridge Partners, LLC, 156 FERC ¶ 62,163
(2016) (denying preliminary permit application
following Corps’ August 2, 2016 comments
opposing the project and requesting that staff reject
the permit application), with Rivertec Partners, LLC,
156 FERC ¶ 62,060 (2016) (issuing preliminary
permit following Corps’ April 13, 2016 comments
that it has no objections to the permit application).
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
22137
Fairgrounds Road, Goldendale,
Washington 98620; phone: (509) 773–
5650.
FERC Contact: Kim Nguyen; phone:
(202) 502–6105.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14837–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14837) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 8, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09677 Filed 5–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2684–010]
Flambeau Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
E:\FR\FM\12MYN1.SGM
12MYN1
Agencies
[Federal Register Volume 82, Number 91 (Friday, May 12, 2017)]
[Notices]
[Pages 22136-22137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09622]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-3279-001; ER10-3274 001; ER10-3275 001; ER10-
3277 001; ER10-3278-001.
Applicants: Basin Creek Equity Partners L.L.C., Capitol District
Energy Center Cogeneration Associates, Pawtucket Power Associates
Limited Partnership, Forked River Power LLC, Pittsfield Generating
Company, L.P.
Description: Notice of Change in Status of Basin Creek Equity
Partners L.L.C., et al.
Filed Date: 5/1/17.
Accession Number: 20170501-5519.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER13-1536-014; ER10-2178-030; ER10-2181-034; ER10-
2182-033; ER10-2192-030; ER15-1537-007; ER15-1539-007.
Applicants: Exelon Generation Company, LLC, Constellation Energy
Commodities Group Maine, LLC, Constellation Energy Services of New
York, Inc., Constellation Energy Services, Inc., Constellation
NewEnergy, Inc., Nine Mile Point Nuclear Station, LLC, R.E. Ginna
Nuclear Power Plant, LLC.
Description: Notice of Change in Status of the Exelon MBR Entities.
Filed Date: 5/1/17.
Accession Number: 20170501-5500.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17-1543-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Tri-State Construct Agmt ?
Monolith Tap IC to be effective 7/5/2017.
Filed Date: 5/4/17.
Accession Number: 20170504-5098.
Comments Due: 5 p.m. ET 5/25/17.
Docket Numbers: ER17-1545-000.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Cost Reimbursement Agreement
(SA 2335)--NMPC and New Athens Generating Company to be effective 4/5/
2017.
Filed Date: 5/5/17.
Accession Number: 20170505-5039.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1547-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Queue Position AB2-061,
Original Service Agreement No. 4695 to be effective 4/25/2017.
Filed Date: 5/5/17.
Accession Number: 20170505-5095.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1548-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Two True-Up SGIA's Golden
Springs Development Company, LLC SA Nos. 541 & 545 to be effective 7/5/
2017.
Filed Date: 5/5/17.
Accession Number: 20170505-5121.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1549-000.
Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc.
Description: Application of Entergy Services, Inc., on behalf of
the Entergy Operating Companies for 2016 Transmission Formula Rate for
Post-Retirement Benefits Other than Pensions.
Filed Date: 5/1/17.
Accession Number: 20170501-5526.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17-1550-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to SA Nos. 3071
and 3072; Queue No. U1-059 and W1-056 re: Assignment to be effective 8/
30/2011.
Filed Date: 5/5/17.
Accession Number: 20170505-5128.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1551-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
No. 286--4CA Participant Services Agreement to be effective 7/6/2017.
Filed Date: 5/5/17.
Accession Number: 20170505-5148.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1552-000.
Applicants: West Penn Power Company, Monongahela Power Company,
Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: West Penn et al submits
revised Interconnection Agreement 1395 to be effective 6/1/2017.
[[Page 22137]]
Filed Date: 5/5/17.
Accession Number: 20170505-5149.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1553-000.
Applicants: Duke Energy Progress, LLC.
Description: Sec. 205(d) Rate Filing: DEP-Fayetteville RS No. 184
Revised PPA to be effective 7/1/2017.
Filed Date: 5/5/17.
Accession Number: 20170505-5150.
Comments Due: 5 p.m. ET 5/26/17.
Docket Numbers: ER17-1554-000.
Applicants: Puget Sound Energy, Inc.
Description: Sec. 205(d) Rate Filing: Open Access Transmission
Tariff Housekeeping Revisions to be effective 5/8/2017.
Filed Date: 5/5/17.
Accession Number: 20170505-5152.
Comments Due: 5 p.m. ET 5/26/17.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF16-823-000.
Applicants: Gloversville-Johnstown Joint Wastewater.
Description: Refund Report of Gloversville-Johnstown Joint
Wastewater Treatment Facility.
Filed Date: 5/1/17.
Accession Number: 20170501-5492.
Comments Due: 5 p.m. ET 5/22/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 5, 2017.
Kimberly D. Bose,
Secretary.