Download as PDF 21538 Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RD17–5–000 and IC17–6–000] Commission Information Collection Activities (FERC–725E); Comment Request; Revision and Extension Federal Energy Regulatory Commission. ACTION: Notice of revised information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on revisions to the information collection, FERC–725E (Mandatory Reliability Standards for the Western Electric Coordinating Council) and will be submitting FERC–725E to the Office of Management and Budget (OMB) for review of the information collection requirements. DATES: Comments on the collection of information are due July 10, 2017. ADDRESSES: You may submit comments identified by Docket Nos. RD17–5–000 and IC17–6–000 by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC–725E, Mandatory Reliability Standards for the Western Electric Coordinating Council. OMB Control No.: 1902–0246. Type of Request: Three-year approval of the FERC–725E information mstockstill on DSK30JT082PROD with NOTICES SUMMARY: VerDate Sep<11>2014 18:19 May 08, 2017 Jkt 241001 collection requirements, as modified by Docket No. RD17–5–000. Abstract: The information collected by the FERC–725E is required to implement the statutory provisions of section 215 of the Federal Power Act (FPA) (16 U.S.C. 824o). Section 215 of the FPA buttresses the Commission’s efforts to strengthen the reliability of the interstate grid through the grant of new authority by providing for a system of mandatory Reliability Standards developed by the Electric Reliability Organization (ERO). Reliability Standards that the ERO proposes to the Commission may include Reliability Standards that are proposed to the ERO by a Regional Entity.1 A Regional Entity is an entity that has been approved by the Commission to enforce Reliability Standards under delegated authority from the ERO.2 On June 8, 2008, the Commission approved eight regional Reliability Standards submitted by the ERO that were proposed by the Western Electricity Coordinating Council (WECC).3 WECC promotes bulk electric system reliability in the Western Interconnection. WECC is the Regional Entity responsible for compliance monitoring and enforcement. In addition, WECC provides an environment for the development of Reliability Standards and the coordination of the operating and planning activities of its members as set forth in the WECC Bylaws. There are several regional Reliability Standards in the WECC region. These regional Reliability Standards generally require entities to document compliance with substantive requirements, retain documentation, and submit reports to WECC. BAL–002–WECC–2a (Contingency Reserve) 4 requires balancing authorities and reserve sharing groups to document compliance with the contingency 1 16 U.S.C. 824o(e)(4). U.S.C. 824o(a)(7) and (e)(4). 3 North American Electric Reliability Corp., 119 FERC 61,260 (2007). 4 BAL–002–WECC–2 is included in the OMBapproved inventory for FERC–725E. On November 9, 2016, NERC and WECC submitted a joint petition for approval of an interpretation of BAL–002– WECC–2, to be designated BAL–002–WECC–2a. BAL–002–WECC–2a was approved by order in Docket No. RD17–3–000 on January 24, 2017. The Order determined: The proposed interpretation provides clarification regarding the types of resources that may be used to satisfy Contingency Reserve requirements in regional Reliability Standard BAL–002–WECC–2. BAL–002–WECC–2a did not trigger the Paperwork Reduction Act and did not affect the burden estimate. BAL–002– WECC–2a is being included in this Notice and the Commission’s submittal to OMB as part of the FERC–725E. 2 16 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 reserve requirements described in the standard. • BAL–004–WECC–02 (Automatic Time Error Correction) requires balancing authorities to document that time error corrections and primary inadvertent interchange payback were conducted according the requirements in the standard. • FAC–501–WECC–1 (Transmission Maintenance) requires transmission owners with certain transmission paths to have a transmission maintenance and inspection plan and to document maintenance and inspection activities according to the plan. • IRO–006–WECC–2 (Qualified Transfer Path Unscheduled Flow (USF) Relief) 5 requires balancing authorities and reliability coordinators document actions taken to mitigate unscheduled flow. • PRC–004–WECC–2 (Protection System and Remedial Action Scheme Misoperation) 6 requires transmission owners, generator owners and transmission operators to document their analysis and/or mitigation due to certain misoperations on major transfer 5 On December 20, 2013, NERC and WECC submitted a joint petition for approval of IRO–006– WECC–2 and retirement of IRO–006–WECC–1. IRO–006–WECC–2 was approved by order in Docket No. RD14–9–000 on May 13, 2014. Because the reporting burden for IRO–006–WECC–2 did not increase for entities that operate within the Western Interconnection, FERC submitted the order to OMB for information only. The burden related to IRO– 006–WECC–2 does not differ from the burden of IRO–006–WECC–1, which is included in the OMBapproved inventory. IRO–006–WECC–2 is being included in this Notice and the Commission’s submittal to OMB as part of FERC–725E. 6 Order No. 818, issued on November 19, 2015 in Docket Nos. RM15–7, RM15–12, and RM15–13, stated in part: ‘‘NERC requested approval of the following Reliability Standards to incorporate the proposed definition of Remedial Action Scheme and eliminate use of the term Special Protection System: . . . PRC–004–WECC–2, . . . NERC did not propose any changes to the Violation Risk Factors or Violation Severity Levels for the modified standards.’’ Revisions to Emergency Operations Reliability Standards; Revisions to Undervoltage Load Shedding Reliability Standards; Revisions to the Definition of ‘‘Remedial Action Scheme’’ and Related Reliability Standards, Order No. 818, 153 FERC ¶ 61,228, at P 23 n.31 (2015). In addition, Order No. 818 stated: ‘‘The Commission approved the definition of Special Protection System (Remedial Action Scheme) in Order No. 693. We approve a revision to the previously approved definition. The revisions to the Remedial Action Scheme definition and related Reliability Standards are not expected to result in changes to the scope of systems covered by the Reliability Standards and other Reliability Standards that include the term Remedial Action Scheme. Therefore, the Commission does not expect the revisions to affect applicable entities’ current reporting burden.’’ Id. P 67. The change to the definition did not affect the burden of PRC–004–WECC–1 (which is included in the current OMB-approved inventory). PRC–004– WECC–2 (the current version of the standard) is being included in this Notice and the Commission’s submittal to OMB as part of the FERC–725E. E:\FR\FM\09MYN1.SGM 09MYN1 21539 Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices paths. This standard requires that documentation be kept for six years. • VAR–002–WECC–2 (Automatic Voltage Regulators (AVR)) 7 requires generator operators and transmission operators to provide quarterly reports to the compliance monitor and have evidence related to their synchronous generators, synchronous condensers, and automatic voltage regulators. The associated reporting and recordkeeping requirements included in the standards above are not being revised, and the Commission will be submitting a request to OMB to extend these requirements for three years. The Commission’s request to OMB will also reflect the following: • Eliminating the burden associated with regional Reliability Standard TOP– 007–WECC–1a, which is being retired (addressed in Docket No. RD16–10); 8 and • Implementing the regional Reliability Standard VAR–501–WECC–3 and the retirement of regional Reliability Standard VAR–501–WECC–2 (addressed in Docket No. RD17–5 and discussed below). On March 10, 2017, NERC and WECC filed a joint petition in Docket No. RD17–5–000 9 requesting Commission approval of: (a) Regional Reliability Standard VAR–501–WECC–3 (Power System Stabilizers), and (b) the retirement of then-existing regional Reliability Standard VAR–501–WECC– 2. The petition states: ‘‘Regional Reliability Standard VAR–501–WECC–3 establishes the performance criteria for power system stabilizers to help ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions.’’ VAR–501– WECC–3 was approved by order in Docket No. RD17–5–000 on April 28, 2017. In this document, we provide estimates of the burden and cost related to those revisions to FERC–725E. Type of Respondents: Balancing authorities, reserve sharing groups, transmission owners, reliability coordinators, transmission operators, generator operators, and generator owners. Estimate of Annual Burden 10: Details follow on the changes in Docket No. RD17–5–000, and on the continuing burdens, which will be submitted to OMB for approval in a consolidated package under FERC–725E. Estimate of Changes to Burden Due to Docket No. RD17–5: The joint petition requested Commission approval of regional Reliability Standard VAR–501– WECC–3 and retirement of then-existing regional Reliability Standard VAR–501– WECC–2. The estimated effects on burden and cost 11 are as follow: FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, CHANGES IN DOCKET NO. RD17–5–000 Number of respondents 12 Annual number of responses per respondent Annual number of responses Average burden hrs. & cost per response ($) Total annual burden hours & total annual cost ($) Cost per respondent ($) (1) Entity (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) = (6) Retirement Of Former Standard VAR–501–WECC–2 and Associated Reductions Reporting Requirements (Annually) Generator Operators ........................ 249 4 996 1 hr.; $76.22 ............... 996 hrs.; $75,915.12 (reduction). $304.88 (reduction) Recordkeeping Requirements (Annually) Generator Operators ........................ 249 4 996 0.5 hrs.; $31.19 .......... $62.38 (reduction) Reductions (Annually) ...................... ........................ ........................ .......................... ..................................... 498 hrs.; $15,532.62 (reduction). 1,494 hrs.; $91,447.74 (reduction). New Standard VAR–501–WECC–3 mstockstill on DSK30JT082PROD with NOTICES Reporting Requirements. Generator Owners and/or Operators, in Year 1. Generator Owners and/or Operators, in Year 2 and Ongoing. Recordkeeping Requirements Generator Owners and/or Operators, in Year 1. Generator Owners and/or Operators, in Year 2 and Ongoing. New Burden, in Year 1 .................... New Burden, in Year 2 & Ongoing .. Net Burden Change in Year 1 ......... 291 3 873 1 hr.; $76.99 ............... 873 hrs.; $67,212.27 .. $230.97 291 2 582 1 hr.; $76.99 ............... 582 hrs.; $44,808.18 .. $153.98 291 3 873 1 hr.; $31.19 ............... 873 hrs.; $27,228.87 .. $93.57 291 2 582 0.5 hrs.; $15.595 ........ 291 hrs.; $9,076.29 .... $31.19 ........................ ........................ ........................ ........................ ........................ ........................ .......................... .......................... .......................... ..................................... ..................................... ..................................... 1,746 hrs.; $94,441.14 873 hrs.; $53,884.47 .. +252 hrs (increase) .... 7 VAR–002–WECC–2 was approved by order in Docket No. RD15–1 on March 3, 2015. Regional Reliability Standard VAR–002–WECC–2 made a non-material or non-substantive change to the reporting and recordkeeping requirements associated with VAR–002–WECC–1 (currently included in the OMB-approved inventory). VAR– 002–WECC–2 (the current version of the standard) is being included in this Notice and the Commission’s submittal to OMB as part of FERC– 725E. 8 The Commission approved the retirement of regional Reliability Standard TOP–007–WECC–1a (System Operating Limits (SOL)) by order in Docket No. RD16–10–000 on March 10, 2017. On March 31, 2017, the Commission issued a 60-day Notice VerDate Sep<11>2014 18:19 May 08, 2017 Jkt 241001 requesting public comment on the effect on burden. The Notice is available at 82 FR 16823 (April 6, 2017). Comments are due in Docket No. RD16–10– 000 by June 5, 2017. See Docket No. RD16–10–000 for additional information (including the estimated annual burden reduction of 1,188 hours). 9 The joint petition and exhibits are posted in the Commission’s eLibrary system in Docket No. RD17– 5–000. 10 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to 5 Code of Federal Regulations 1320.3. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 11 For VAR–501–WECC–3, the hourly cost (for salary plus benefits) uses the figures from the Bureau of Labor Statistics for three positions involved in the reporting and recordkeeping requirements. These figures include salary (https:// bls.gov/oes/current/naics2_22.htm) and benefits (https://www.bls.gov/news.release/ecec.nr0.htm) and are: • Manager: $89.07/hour • Engineer: $64.91/hour • File Clerk: $31.19/hour The hourly cost for the reporting requirements ($76.99) is an average of the cost of a manager and engineer. The hourly cost for recordkeeping requirements uses the cost of a file clerk. E:\FR\FM\09MYN1.SGM 09MYN1 21540 Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, CHANGES IN DOCKET NO. RD17–5–000—Continued Net Burden Change in Year 2 and Ongoing. Number of respondents 12 Annual number of responses per respondent Annual number of responses Average burden hrs. & cost per response ($) Total annual burden hours & total annual cost ($) Cost per respondent ($) (1) Entity (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) = (6) ........................ ........................ .......................... ..................................... ¥621 hrs. (decrease) Estimate of Continuing Annual Burden for Renewal and New Reliability Standard VAR–501–WECC–3: 13 The Commission estimates the annual public reporting burden and cost 14 as follows for FERC–725E. (This information will be submitted to OMB for approval.) These estimates reflect: • Reliability Standards in FERC–725E which continue and remain unchanged (BAL–002–WECC–2a, BAL–004–WECC– 02, FAC–501–WECC–1, IRO–006– WECC–2, PRC–004–WECC–2, and VAR– 002–WECC–2); • Removal of burden due to the retirement of TOP–007–WECC–1a (discussed in Docket No. RD16–10–000) • Additional burden due to VAR– 501–WECC–3, and removal of burden due to the retirement of VAR–501– WECC–2 (detailed above and in Docket No. RD17–5–000). (The burdens and costs related to TOP–007–WECC–1a and VAR–501– WECC–2 [the standards being retired] are omitted from the table below, which describes the new and continuing information collection requirements.) FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL [New and Continuing Information Collection Requirements] Number of respondents 15 Annual number of responses per respondent Annual number of responses Average burden hrs. & cost per response ($) Total annual burden hours & total annual cost ($) Cost per respondent ($) (1) Entity (2) (1)*(2) = (3) (4) (3)*(4) = (5) (5)÷(1) = (6) $3,079.60 Reporting Requirements Balancing Authorities ....................... Generator Operators ........................ 34 228 1 1 34 228 21 hrs., $1,616.79 ...... 10 hrs., $769.90 ......... Transmission Operators applicable to standard VAR–002. Transmission Owners that operate qualified transfer paths. Reliability Coordinators .................... Reserve Sharing Group ................... Generator Owners and/or Operators , in Year 1, per RD17–5 for VAR– 501–WECC–3. Generator Owners and/or Operators, in Year 2 and Ongoing, per RD17–5 for VAR–501–WECC–3. Sub-Total for Reporting Requirement in Year 1. Sub-Total for Reporting Requirement Burden in Year 2 & ongoing. 86 4 344 10 hrs., $769.90 ......... 5 3 15 40 hrs., $3,079.60 ...... 714 hrs., $54,970.86 .. 2,280 hrs., $175,537.20. 3,440 hrs., $264,845.60. 600 hrs., $46,194.00 .. $1,616.79 $769.90 1 3 291 1 1 3 1 3 873 1 hr., $76.99 ............... 1 hr., $76.99 ............... 1 hr.; $76.99 ............... 1 hr., $76.99 ............... 3 hrs., $230.97 ........... 873 hrs.; $67,212.27 .. $76.99 $76.99 $230.97 291 2 582 1 hr.; $76.99 ............... 582 hrs.; $44,808.18 .. $153.98 ........................ ........................ .......................... ..................................... ........................ ........................ .......................... ..................................... 7,911 hrs.; $609,067.89. 7,620 hrs.; $586,663.80. $769.90 Recordkeeping Requirements mstockstill on DSK30JT082PROD with NOTICES Balancing Authorities ....................... Balancing Authorities (IRO–006) ..... Generator Operators ........................ Transmission Operator (VAR–002) .. Transmission Owner that operate qualified transfer paths. Reliability Coordinator ...................... Generator Owners and/or Operators, in Year 1, per RD17–5 for VAR–501–WECC–3. 34 34 228 86 5 1 1 1 1 1 34 34 228 86 5 2.1 hrs., $65.50 .......... 1 hr., $31.19 ............... 1 hr., $31.19 ............... 4 hrs., $124.76 ........... 12 hrs., $374.28 ......... 71.4 hrs., $2,226.97 ... 34 hrs., $1,060.46 ...... 228 hrs., $7,111.32 .... 344 hrs., $10,729.36 .. 60 hrs., $1,871.40 ...... $65.50 $31.19 $31.19 $124.76 $374.28 1 291 1 3 1 873 1 hr.; $31.19 ............... 1 hr.; $31.19 ............... 1 hr.; $31.19 ............... 873 hrs.; $27,228.87 .. $31.19 $93.57 12 The number of respondents is derived from the NERC Compliance Registry as of March 10, 2017. 13 The Commission is also removing 36 one-time burden hours associated with the requirements in Docket No. RM13–13. The one-time burden has been completed and will now be administratively removed on submittal to OMB. Those hours are not included in the table. VerDate Sep<11>2014 19:20 May 08, 2017 Jkt 241001 14 The hourly cost (for salary plus benefits) uses the figures from the Bureau of Labor Statistics for three positions involved in the reporting and recordkeeping requirements. These figures include salary (https://bls.gov/oes/current/naics2_22.htm) and other associated benefits (https://www.bls.gov/ news.release/ecec.nr0.htm) and are: • Manager: $89.07/hour PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 • Engineer: $64.91/hour • File Clerk: $31.19/hour The hourly cost for the reporting requirements ($76.99) is an average of the cost of a manager and engineer. The hourly cost for recordkeeping requirements uses the cost of a file clerk. E:\FR\FM\09MYN1.SGM 09MYN1 21541 Federal Register / Vol. 82, No. 88 / Tuesday, May 9, 2017 / Notices FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL—Continued [New and Continuing Information Collection Requirements] Number of respondents 15 Annual number of responses per respondent Annual number of responses Average burden hrs. & cost per response ($) Total annual burden hours & total annual cost ($) Cost per respondent ($) (1) Entity (2) (1)*(2) = (3) (4) (3)*(4) = (5) (5)÷(1) = (6) Generator Owners and/or Operators, in Year 2 and Ongoing, per RD17–5 for VAR–501–WECC–3. 291 2 582 0.5 hrs.; $15.595 ........ 291 hrs.; $9,076.29 .... Sub-Total for Recordkeeping Requirements in Yr. 1. Sub-Total for Recordkeeping Requirements in Yr. 2 & ongoing. TOTAL FOR FERC–725E, IN YR. 1. TOTAL FOR FERC–725E, IN YR. 2 & ONGOING. ........................ ........................ .......................... ..................................... ........................ ........................ .......................... ..................................... 1,611.4 hrs.; $50,259.57. 1,029.4 hrs.; $32,106.99. ........................ ........................ .......................... ..................................... ........................ ........................ .......................... ..................................... Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: May 3, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09341 Filed 5–8–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–239–000] mstockstill on DSK30JT082PROD with NOTICES Equitrans, L.P.; Notice of Request Under Blanket Authorization Take notice that on April 25, 2017, Equitrans, L.P. (Equitrans), 625 Liberty Avenue, Suite 1700, Pittsburgh, Pennsylvania 15222 filed a prior notice request pursuant to sections 157.205 and 157.216(b) of the Commission’s regulations under the Natural Gas Act for authorization to abandon two wells in Equitrans’ Logansport Storage Field located in Marion County, West Virginia. Specifically, Equitrans seeks to plug and abandon two natural gas storage injection and withdrawal wells, Logansport 6188 and Logansport 8271, VerDate Sep<11>2014 18:19 May 08, 2017 Jkt 241001 which were damaged as a result of undermining activity that took place in 2010 and are at risk for gas loss. The abandonment will have no effect on the certificated physical parameters of the field, and there will be no effect on service to any of Equitrans’ customers, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Paul W. Diehl, Counsel, Midstream at Equitrans, L.P., 625 Liberty Avenue, Suite 1700, Pittsburgh, Pennsylvania 15222, by phone (412) 395–5540, or by fax (412) 553–7781, or by email at pdiehl@eqt.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 $31.19 9,522.4 hrs.; $659,327.46. 8,649.4 hrs.; $618,770.79. authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 82, Number 88 (Tuesday, May 9, 2017)]
[Notices]
[Pages 21538-21541]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09341]



[[Page 21538]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. RD17-5-000 and IC17-6-000]


Commission Information Collection Activities (FERC-725E); Comment 
Request; Revision and Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of revised information collection and request for 
comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on revisions to the information 
collection, FERC-725E (Mandatory Reliability Standards for the Western 
Electric Coordinating Council) and will be submitting FERC-725E to the 
Office of Management and Budget (OMB) for review of the information 
collection requirements.

DATES: Comments on the collection of information are due July 10, 2017.

ADDRESSES: You may submit comments identified by Docket Nos. RD17-5-000 
and IC17-6-000 by either of the following methods:
     eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.

Instructions: All submissions must be formatted and filed in accordance 
with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support by email at 
ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), 
or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725E, Mandatory Reliability Standards for the Western 
Electric Coordinating Council.
    OMB Control No.: 1902-0246.
    Type of Request: Three-year approval of the FERC-725E information 
collection requirements, as modified by Docket No. RD17-5-000.
    Abstract: The information collected by the FERC-725E is required to 
implement the statutory provisions of section 215 of the Federal Power 
Act (FPA) (16 U.S.C. 824o). Section 215 of the FPA buttresses the 
Commission's efforts to strengthen the reliability of the interstate 
grid through the grant of new authority by providing for a system of 
mandatory Reliability Standards developed by the Electric Reliability 
Organization (ERO). Reliability Standards that the ERO proposes to the 
Commission may include Reliability Standards that are proposed to the 
ERO by a Regional Entity.\1\ A Regional Entity is an entity that has 
been approved by the Commission to enforce Reliability Standards under 
delegated authority from the ERO.\2\ On June 8, 2008, the Commission 
approved eight regional Reliability Standards submitted by the ERO that 
were proposed by the Western Electricity Coordinating Council 
(WECC).\3\
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824o(e)(4).
    \2\ 16 U.S.C. 824o(a)(7) and (e)(4).
    \3\ North American Electric Reliability Corp., 119 FERC 61,260 
(2007).
---------------------------------------------------------------------------

    WECC promotes bulk electric system reliability in the Western 
Interconnection. WECC is the Regional Entity responsible for compliance 
monitoring and enforcement. In addition, WECC provides an environment 
for the development of Reliability Standards and the coordination of 
the operating and planning activities of its members as set forth in 
the WECC Bylaws.
    There are several regional Reliability Standards in the WECC 
region. These regional Reliability Standards generally require entities 
to document compliance with substantive requirements, retain 
documentation, and submit reports to WECC.
    BAL-002-WECC-2a (Contingency Reserve) \4\ requires balancing 
authorities and reserve sharing groups to document compliance with the 
contingency reserve requirements described in the standard.
---------------------------------------------------------------------------

    \4\ BAL-002-WECC-2 is included in the OMB-approved inventory for 
FERC-725E. On November 9, 2016, NERC and WECC submitted a joint 
petition for approval of an interpretation of BAL-002-WECC-2, to be 
designated BAL-002-WECC-2a. BAL-002-WECC-2a was approved by order in 
Docket No. RD17-3-000 on January 24, 2017. The Order determined: The 
proposed interpretation provides clarification regarding the types 
of resources that may be used to satisfy Contingency Reserve 
requirements in regional Reliability Standard BAL-002-WECC-2. BAL-
002-WECC-2a did not trigger the Paperwork Reduction Act and did not 
affect the burden estimate. BAL-002-WECC-2a is being included in 
this Notice and the Commission's submittal to OMB as part of the 
FERC-725E.
---------------------------------------------------------------------------

     BAL-004-WECC-02 (Automatic Time Error Correction) requires 
balancing authorities to document that time error corrections and 
primary inadvertent interchange payback were conducted according the 
requirements in the standard.
     FAC-501-WECC-1 (Transmission Maintenance) requires 
transmission owners with certain transmission paths to have a 
transmission maintenance and inspection plan and to document 
maintenance and inspection activities according to the plan.
     IRO-006-WECC-2 (Qualified Transfer Path Unscheduled Flow 
(USF) Relief) \5\ requires balancing authorities and reliability 
coordinators document actions taken to mitigate unscheduled flow.
---------------------------------------------------------------------------

    \5\ On December 20, 2013, NERC and WECC submitted a joint 
petition for approval of IRO-006-WECC-2 and retirement of IRO-006-
WECC-1. IRO-006-WECC-2 was approved by order in Docket No. RD14-9-
000 on May 13, 2014. Because the reporting burden for IRO-006-WECC-2 
did not increase for entities that operate within the Western 
Interconnection, FERC submitted the order to OMB for information 
only. The burden related to IRO-006-WECC-2 does not differ from the 
burden of IRO-006-WECC-1, which is included in the OMB-approved 
inventory. IRO-006-WECC-2 is being included in this Notice and the 
Commission's submittal to OMB as part of FERC-725E.
---------------------------------------------------------------------------

     PRC-004-WECC-2 (Protection System and Remedial Action 
Scheme Misoperation) \6\ requires transmission owners, generator owners 
and transmission operators to document their analysis and/or mitigation 
due to certain misoperations on major transfer

[[Page 21539]]

paths. This standard requires that documentation be kept for six years.
---------------------------------------------------------------------------

    \6\ Order No. 818, issued on November 19, 2015 in Docket Nos. 
RM15-7, RM15-12, and RM15-13, stated in part: ``NERC requested 
approval of the following Reliability Standards to incorporate the 
proposed definition of Remedial Action Scheme and eliminate use of 
the term Special Protection System: . . . PRC-004-WECC-2, . . . NERC 
did not propose any changes to the Violation Risk Factors or 
Violation Severity Levels for the modified standards.'' Revisions to 
Emergency Operations Reliability Standards; Revisions to 
Undervoltage Load Shedding Reliability Standards; Revisions to the 
Definition of ``Remedial Action Scheme'' and Related Reliability 
Standards, Order No. 818, 153 FERC ] 61,228, at P 23 n.31 (2015). In 
addition, Order No. 818 stated: ``The Commission approved the 
definition of Special Protection System (Remedial Action Scheme) in 
Order No. 693. We approve a revision to the previously approved 
definition. The revisions to the Remedial Action Scheme definition 
and related Reliability Standards are not expected to result in 
changes to the scope of systems covered by the Reliability Standards 
and other Reliability Standards that include the term Remedial 
Action Scheme. Therefore, the Commission does not expect the 
revisions to affect applicable entities' current reporting burden.'' 
Id. P 67. The change to the definition did not affect the burden of 
PRC-004-WECC-1 (which is included in the current OMB-approved 
inventory). PRC-004-WECC-2 (the current version of the standard) is 
being included in this Notice and the Commission's submittal to OMB 
as part of the FERC-725E.
---------------------------------------------------------------------------

     VAR-002-WECC-2 (Automatic Voltage Regulators (AVR)) \7\ 
requires generator operators and transmission operators to provide 
quarterly reports to the compliance monitor and have evidence related 
to their synchronous generators, synchronous condensers, and automatic 
voltage regulators.
---------------------------------------------------------------------------

    \7\ VAR-002-WECC-2 was approved by order in Docket No. RD15-1 on 
March 3, 2015. Regional Reliability Standard VAR-002-WECC-2 made a 
non-material or non-substantive change to the reporting and 
recordkeeping requirements associated with VAR-002-WECC-1 (currently 
included in the OMB-approved inventory). VAR-002-WECC-2 (the current 
version of the standard) is being included in this Notice and the 
Commission's submittal to OMB as part of FERC-725E.
---------------------------------------------------------------------------

    The associated reporting and recordkeeping requirements included in 
the standards above are not being revised, and the Commission will be 
submitting a request to OMB to extend these requirements for three 
years. The Commission's request to OMB will also reflect the following:
     Eliminating the burden associated with regional 
Reliability Standard TOP-007-WECC-1a, which is being retired (addressed 
in Docket No. RD16-10); \8\ and
---------------------------------------------------------------------------

    \8\ The Commission approved the retirement of regional 
Reliability Standard TOP-007-WECC-1a (System Operating Limits (SOL)) 
by order in Docket No. RD16-10-000 on March 10, 2017. On March 31, 
2017, the Commission issued a 60-day Notice requesting public 
comment on the effect on burden. The Notice is available at 82 FR 
16823 (April 6, 2017). Comments are due in Docket No. RD16-10-000 by 
June 5, 2017. See Docket No. RD16-10-000 for additional information 
(including the estimated annual burden reduction of 1,188 hours).
---------------------------------------------------------------------------

     Implementing the regional Reliability Standard VAR-501-
WECC-3 and the retirement of regional Reliability Standard VAR-501-
WECC-2 (addressed in Docket No. RD17-5 and discussed below).
    On March 10, 2017, NERC and WECC filed a joint petition in Docket 
No. RD17-5-000 \9\ requesting Commission approval of: (a) Regional 
Reliability Standard VAR-501-WECC-3 (Power System Stabilizers), and (b) 
the retirement of then-existing regional Reliability Standard VAR-501-
WECC-2. The petition states: ``Regional Reliability Standard VAR-501-
WECC-3 establishes the performance criteria for power system 
stabilizers to help ensure the Western Interconnection is operated in a 
coordinated manner under normal and abnormal conditions.'' VAR-501-
WECC-3 was approved by order in Docket No. RD17-5-000 on April 28, 
2017. In this document, we provide estimates of the burden and cost 
related to those revisions to FERC-725E.
---------------------------------------------------------------------------

    \9\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD17-5-000.
---------------------------------------------------------------------------

    Type of Respondents: Balancing authorities, reserve sharing groups, 
transmission owners, reliability coordinators, transmission operators, 
generator operators, and generator owners.
    Estimate of Annual Burden \10\: Details follow on the changes in 
Docket No. RD17-5-000, and on the continuing burdens, which will be 
submitted to OMB for approval in a consolidated package under FERC-
725E.
---------------------------------------------------------------------------

    \10\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.
---------------------------------------------------------------------------

    Estimate of Changes to Burden Due to Docket No. RD17-5: The joint 
petition requested Commission approval of regional Reliability Standard 
VAR-501-WECC-3 and retirement of then-existing regional Reliability 
Standard VAR-501-WECC-2. The estimated effects on burden and cost \11\ 
are as follow:
---------------------------------------------------------------------------

    \11\ For VAR-501-WECC-3, the hourly cost (for salary plus 
benefits) uses the figures from the Bureau of Labor Statistics for 
three positions involved in the reporting and recordkeeping 
requirements. These figures include salary (https://bls.gov/oes/current/naics2_22.htm) and benefits (https://www.bls.gov/news.release/ecec.nr0.htm) and are:
     Manager: $89.07/hour
     Engineer: $64.91/hour
     File Clerk: $31.19/hour
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.

                                   FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Changes in Docket No. RD17-5-000
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual  number
                                           Number of     of  responses   Annual  number   Average burden hrs. &  cost per      Total annual  burden hours &
                Entity                    respondents         per        of  responses             response  ($)                  total annual cost  ($)            Cost per respondent  ($)
                                             \12\         respondent
                                                   (1)             (2)  (1) * (2) = (3)  (4)..............................  (3) * (4) = (5)..................  (5) / (1) = (6)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             Retirement Of Former Standard VAR-501-WECC-2 and Associated Reductions
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Reporting Requirements (Annually)
Generator Operators...................             249               4              996  1 hr.; $76.22....................  996 hrs.; $75,915.12 (reduction).  $304.88 (reduction)
Recordkeeping Requirements (Annually)
Generator Operators...................             249               4              996  0.5 hrs.; $31.19.................  498 hrs.; $15,532.62 (reduction).  $62.38 (reduction)
Reductions (Annually).................  ..............  ..............  ...............  .................................  1,494 hrs.; $91,447.74             .................................
                                                                                                                             (reduction).
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   New Standard VAR-501-WECC-3
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Reporting Requirements................
Generator Owners and/or Operators, in              291               3              873  1 hr.; $76.99....................  873 hrs.; $67,212.27.............  $230.97
 Year 1.
Generator Owners and/or Operators, in              291               2              582  1 hr.; $76.99....................  582 hrs.; $44,808.18.............  $153.98
 Year 2 and Ongoing.
Recordkeeping Requirements
Generator Owners and/or Operators, in              291               3              873  1 hr.; $31.19....................  873 hrs.; $27,228.87.............  $93.57
 Year 1.
Generator Owners and/or Operators, in              291               2              582  0.5 hrs.; $15.595................  291 hrs.; $9,076.29..............  $31.19
 Year 2 and Ongoing.
New Burden, in Year 1.................  ..............  ..............  ...............  .................................  1,746 hrs.; $94,441.14...........  .................................
New Burden, in Year 2 & Ongoing.......  ..............  ..............  ...............  .................................  873 hrs.; $53,884.47.............  .................................
Net Burden Change in Year 1...........  ..............  ..............  ...............  .................................  +252 hrs (increase)..............  .................................

[[Page 21540]]

 
Net Burden Change in Year 2 and         ..............  ..............  ...............  .................................  -621 hrs. (decrease).............  .................................
 Ongoing.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Estimate of Continuing Annual Burden for Renewal and New 
Reliability Standard VAR-501-WECC-3: \13\ The Commission estimates the 
annual public reporting burden and cost \14\ as follows for FERC-725E. 
(This information will be submitted to OMB for approval.) These 
estimates reflect:
---------------------------------------------------------------------------

    \12\ The number of respondents is derived from the NERC 
Compliance Registry as of March 10, 2017.
    \13\ The Commission is also removing 36 one-time burden hours 
associated with the requirements in Docket No. RM13-13. The one-time 
burden has been completed and will now be administratively removed 
on submittal to OMB. Those hours are not included in the table.
    \14\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics for three positions involved in 
the reporting and recordkeeping requirements. These figures include 
salary (https://bls.gov/oes/current/naics2_22.htm) and other 
associated benefits (https://www.bls.gov/news.release/ecec.nr0.htm) 
and are:
     Manager: $89.07/hour
     Engineer: $64.91/hour
     File Clerk: $31.19/hour
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.
---------------------------------------------------------------------------

     Reliability Standards in FERC-725E which continue and 
remain unchanged (BAL-002-WECC-2a, BAL-004-WECC-02, FAC-501-WECC-1, 
IRO-006-WECC-2, PRC-004-WECC-2, and VAR-002-WECC-2);
     Removal of burden due to the retirement of TOP-007-WECC-1a 
(discussed in Docket No. RD16-10-000)
     Additional burden due to VAR-501-WECC-3, and removal of 
burden due to the retirement of VAR-501-WECC-2 (detailed above and in 
Docket No. RD17-5-000).
    (The burdens and costs related to TOP-007-WECC-1a and VAR-501-WECC-
2 [the standards being retired] are omitted from the table below, which 
describes the new and continuing information collection requirements.)

                                                    FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council
                                                                    [New and Continuing Information Collection Requirements]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                           Number of     Annual number
                Entity                    respondents    of responses    Annual number     Average burden hrs. & cost per      Total annual  burden hours &         Cost per respondent  ($)
                                             \15\       per respondent    of responses             response  ($)                  total annual cost  ($)
                                                   (1)             (2)    (1)*(2) = (3)  (4)..............................  (3)*(4) = (5)....................  (5)/(1) = (6)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                     Reporting Requirements
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Balancing Authorities.................              34               1               34  21 hrs., $1,616.79...............  714 hrs., $54,970.86.............  $1,616.79
Generator Operators...................             228               1              228  10 hrs., $769.90.................  2,280 hrs., $175,537.20..........  $769.90
Transmission Operators applicable to                86               4              344  10 hrs., $769.90.................  3,440 hrs., $264,845.60..........  $769.90
 standard VAR-002.
Transmission Owners that operate                     5               3               15  40 hrs., $3,079.60...............  600 hrs., $46,194.00.............  $3,079.60
 qualified transfer paths.
Reliability Coordinators..............               1               1                1  1 hr., $76.99....................  1 hr., $76.99....................  $76.99
Reserve Sharing Group.................               3               1                3  1 hr., $76.99....................  3 hrs., $230.97..................  $76.99
Generator Owners and/or Operators , in             291               3              873  1 hr.; $76.99....................  873 hrs.; $67,212.27.............  $230.97
 Year 1, per RD17-5 for VAR-501-WECC-3.
Generator Owners and/or Operators, in              291               2              582  1 hr.; $76.99....................  582 hrs.; $44,808.18.............  $153.98
 Year 2 and Ongoing, per RD17-5 for
 VAR-501-WECC-3.
    Sub-Total for Reporting             ..............  ..............  ...............  .................................  7,911 hrs.; $609,067.89..........  .................................
     Requirement in Year 1.
    Sub-Total for Reporting             ..............  ..............  ...............  .................................  7,620 hrs.; $586,663.80..........  .................................
     Requirement Burden in Year 2 &
     ongoing.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                   Recordkeeping Requirements
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Balancing Authorities.................              34               1               34  2.1 hrs., $65.50.................  71.4 hrs., $2,226.97.............  $65.50
Balancing Authorities (IRO-006).......              34               1               34  1 hr., $31.19....................  34 hrs., $1,060.46...............  $31.19
Generator Operators...................             228               1              228  1 hr., $31.19....................  228 hrs., $7,111.32..............  $31.19
Transmission Operator (VAR-002).......              86               1               86  4 hrs., $124.76..................  344 hrs., $10,729.36.............  $124.76
Transmission Owner that operate                      5               1                5  12 hrs., $374.28.................  60 hrs., $1,871.40...............  $374.28
 qualified transfer paths.
Reliability Coordinator...............               1               1                1  1 hr.; $31.19....................  1 hr.; $31.19....................  $31.19
Generator Owners and/or Operators, in              291               3              873  1 hr.; $31.19....................  873 hrs.; $27,228.87.............  $93.57
 Year 1, per RD17-5 for VAR-501-WECC-3.

[[Page 21541]]

 
Generator Owners and/or Operators, in              291               2              582  0.5 hrs.; $15.595................  291 hrs.; $9,076.29..............  $31.19
 Year 2 and Ongoing, per RD17-5 for
 VAR-501-WECC-3.
                                       ---------------------------------------------------------------------------------------------------------------------------------------------------------
    Sub-Total for Recordkeeping         ..............  ..............  ...............  .................................  1,611.4 hrs.; $50,259.57.........  .................................
     Requirements in Yr. 1.
    Sub-Total for Recordkeeping         ..............  ..............  ...............  .................................  1,029.4 hrs.; $32,106.99.........  .................................
     Requirements in Yr. 2 & ongoing.
        TOTAL FOR FERC-725E, IN YR. 1.  ..............  ..............  ...............  .................................  9,522.4 hrs.; $659,327.46........  .................................
        TOTAL FOR FERC-725E, IN YR. 2   ..............  ..............  ...............  .................................  8,649.4 hrs.; $618,770.79........  .................................
         & ONGOING.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: May 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09341 Filed 5-8-17; 8:45 am]
 BILLING CODE 6717-01-P