Southern Star Central Gas Pipeline; Notice of Application, 21380-21381 [2017-09252]
Download as PDF
21380
Federal Register / Vol. 82, No. 87 / Monday, May 8, 2017 / Notices
Filed Date: 5/1/17.
Accession Number: 20170501–5231.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1515–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–05–01_Filing to revise MRES
Attachment O inc. RTO Adder Request
to be effective 7/1/2017.
Filed Date: 5/1/17.
Accession Number: 20170501–5243.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1516–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3316
Carthage Water & Electric Plant NITSA
and NOA to be effective 4/1/2017.
Filed Date: 5/1/17.
Accession Number: 20170501–5251.
Comments Due: 5 p.m. ET 5/22/17.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Docket Numbers: ER17–1517–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–05–01_Emergency Energy Pricing
Construct Filing to be effective
7/1/2017.
Filed Date: 5/1/17.
Accession Number: 20170501–5252.
Comments Due: 5 p.m. ET 5/22/17.
Accession Number: 20170501–5296.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1522–000.
Applicants: Playa Solar 1, LLC.
Description: Baseline eTariff Filing:
Application for Initial Market-Based
Rate Tariff and Granting Certain
Waivers to be effective 5/2/2017.
Filed Date: 5/1/17.
Accession Number: 20170501–5301.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1523–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: Corn
Belt Formula Rate—Grundy Center and
Sumner to be effective 7/1/2017.
Filed Date: 5/1/17.
Accession Number: 20170501–5303.
Comments Due: 5 p.m. ET 5/22/17.
Docket Numbers: ER17–1524–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment AF Revisions Regarding
Review of Mitigated Resource Offer
Costs to be effective 7/1/2017.
Filed Date: 5/2/17.
Accession Number: 20170502–5074.
Comments Due: 5 p.m. ET 5/23/17.
Docket Numbers: ER17–1525–000.
Applicants: WSPP Inc.
Docket Numbers: ER17–1518–000.
Description: § 205(d) Rate Filing: List
Applicants: Cleco Power LLC.
of Members Update 2017 to be effective
Description: § 205(d) Rate Filing:
4/26/2017.
Reactive Power Revenue Requirements
Filed Date: 5/2/17.
to be effective 7/1/2017.
Accession Number: 20170502–5091.
Filed Date: 5/1/17.
Comments Due: 5 p.m. ET 5/23/17.
Accession Number: 20170501–5255.
Docket Numbers: ER17–1526–000.
Comments Due: 5 p.m. ET 5/22/17.
Applicants: Southern California
Docket Numbers: ER17–1519–000.
Edison Company.
Applicants: PECO Energy Company,
Description: Tariff Cancellation:
PJM Interconnection, L.L.C.
Notices of Cancellation IFA & DSA Simi
Description: § 205(d) Rate Filing:
Valley Landfill Energy SA Nos. 92 & 91
PECO Energy Company submits OATT
to be effective 7/16/2017.
Att. H Formula Rate/Protocols to be
Filed Date: 5/2/17.
effective 7/1/2017.
Accession Number: 20170502–5097.
Filed Date: 5/1/17.
Comments Due: 5 p.m. ET 5/23/17.
Accession Number: 20170501–5266.
Docket Numbers: ER17–1527–000.
Comments Due: 5 p.m. ET 5/22/17.
Applicants: Southern California
Edison Company.
Docket Numbers: ER17–1520–000.
Description: Tariff Cancellation:
Applicants: Duke Energy Carolinas,
Notices of Cancellation IFA & DSA El
LLC.
Description: § 205(d) Rate Filing: DEC- Sobrante Landfill Energy SA Nos. 83 &
84 to be effective 7/16/2017.
Lockhart Revised PPA RS No. 332 to be
Filed Date: 5/2/17.
effective 1/1/2016.
Accession Number: 20170502–5100.
Filed Date: 5/2/17.
Comments Due: 5 p.m. ET 5/23/17.
Accession Number: 20170502–5007.
Comments Due: 5 p.m. ET 5/23/17.
Take notice that the Commission
received the following electric securities
Docket Numbers: ER17–1521–000.
filings:
Applicants: PJM Interconnection,
Docket Numbers: ES17–23–000.
L.L.C.
Applicants: Transource Maryland,
Description: § 205(d) Rate Filing: 1st
LLC.
Quarter 2017 Updates to OA/RAA
Description: Application under
Member Lists to be effective 3/31/2017.
Section 204 of the Federal Power Act
Filed Date: 5/1/17.
VerDate Sep<11>2014
18:27 May 05, 2017
Jkt 241001
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
For Authorization to Issue Securities of
Transource Maryland, LLC.
Filed Date: 4/27/17.
Accession Number: 20170427–5587.
Comments Due: 5 p.m. ET 5/18/17.
Docket Numbers: ES17–24–000.
Applicants: Transource Pennsylvania,
LLC.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Transource Pennsylvania, LLC.
Filed Date: 4/27/17.
Accession Number: 20170427–5595.
Comments Due: 5 p.m. ET 5/18/17.
Docket Numbers: ES17–25–000;
ES17–26–000; ES17–27–000; ES17–28–
000; ES17–29–000; ES17–30–000.
Applicants: Entergy Arkansas, Inc.,
Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans,
Inc., Entergy Texas, Inc., System Energy
Resources, Inc.
Description: Joint Application for
Authorizations under FPA Section 204
of Entergy Arkansas, Inc., et al.
Filed Date: 4/28/17.
Accession Number: 20170428–5564.
Comments Due: 5 p.m. ET 5/19/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09251 Filed 5–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–219–000]
Southern Star Central Gas Pipeline;
Notice of Application
Take notice that on April 21, 2017,
Southern Star Central Gas Pipeline
E:\FR\FM\08MYN1.SGM
08MYN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 82, No. 87 / Monday, May 8, 2017 / Notices
(Southern Star), 4700 Highway 56,
Owensboro, Kentucky 42301, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) requesting
authorization to expand both vertically
and laterally the existing certificated
boundary of its Webb Gas Storage Field
located in Grant County, Oklahoma.
Southern Star states that the current
operational parameters and capabilities
of the Webb Gas Storage Field will
remain the same and current certificated
service levels to customers will not be
affected, all as more fully described in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to
Ronnie C. Hensley, Manager, Regulatory
Affairs, Southern Star Central Gas
Pipeline, Inc., 4700 Highway 56,
Owensboro, KY 42301, or call (270)
852–4658, or by email
ronnie.c.hensley@sscgp.com.
Southern Star requests that the
current certificated boundary be
expanded horizontally east of the
current certificated boundary, in an area
noted as the North Nardin Field,
totaling 1,120 surface acres.
Additionally, Southern Star requests
that the vertical storage boundary be
expanded in the KLO area to include the
Oswego Limestone formation. The KLO
area is a 160-acre section located in the
northeast section within the field’s
current certificate boundary.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
VerDate Sep<11>2014
18:27 May 05, 2017
Jkt 241001
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
21381
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE., Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Time on May 23, 2017.
Dated: May 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09252 Filed 5–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1522–000]
Playa Solar 1, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Playa
Solar 1, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 22,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 82, Number 87 (Monday, May 8, 2017)]
[Notices]
[Pages 21380-21381]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09252]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-219-000]
Southern Star Central Gas Pipeline; Notice of Application
Take notice that on April 21, 2017, Southern Star Central Gas
Pipeline
[[Page 21381]]
(Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed an
application pursuant to section 7(c) of the Natural Gas Act (NGA)
requesting authorization to expand both vertically and laterally the
existing certificated boundary of its Webb Gas Storage Field located in
Grant County, Oklahoma. Southern Star states that the current
operational parameters and capabilities of the Webb Gas Storage Field
will remain the same and current certificated service levels to
customers will not be affected, all as more fully described in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to
Ronnie C. Hensley, Manager, Regulatory Affairs, Southern Star Central
Gas Pipeline, Inc., 4700 Highway 56, Owensboro, KY 42301, or call (270)
852-4658, or by email ronnie.c.hensley@sscgp.com.
Southern Star requests that the current certificated boundary be
expanded horizontally east of the current certificated boundary, in an
area noted as the North Nardin Field, totaling 1,120 surface acres.
Additionally, Southern Star requests that the vertical storage boundary
be expanded in the KLO area to include the Oswego Limestone formation.
The KLO area is a 160-acre section located in the northeast section
within the field's current certificate boundary.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made in the proceeding with the Commission
and must mail a copy to the applicant and to every other party. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on May 23, 2017.
Dated: May 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09252 Filed 5-5-17; 8:45 am]
BILLING CODE 6717-01-P