Download as PDF 21380 Federal Register / Vol. 82, No. 87 / Monday, May 8, 2017 / Notices Filed Date: 5/1/17. Accession Number: 20170501–5231. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1515–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–05–01_Filing to revise MRES Attachment O inc. RTO Adder Request to be effective 7/1/2017. Filed Date: 5/1/17. Accession Number: 20170501–5243. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1516–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3316 Carthage Water & Electric Plant NITSA and NOA to be effective 4/1/2017. Filed Date: 5/1/17. Accession Number: 20170501–5251. Comments Due: 5 p.m. ET 5/22/17. asabaliauskas on DSK3SPTVN1PROD with NOTICES Docket Numbers: ER17–1517–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–05–01_Emergency Energy Pricing Construct Filing to be effective 7/1/2017. Filed Date: 5/1/17. Accession Number: 20170501–5252. Comments Due: 5 p.m. ET 5/22/17. Accession Number: 20170501–5296. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1522–000. Applicants: Playa Solar 1, LLC. Description: Baseline eTariff Filing: Application for Initial Market-Based Rate Tariff and Granting Certain Waivers to be effective 5/2/2017. Filed Date: 5/1/17. Accession Number: 20170501–5301. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1523–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Corn Belt Formula Rate—Grundy Center and Sumner to be effective 7/1/2017. Filed Date: 5/1/17. Accession Number: 20170501–5303. Comments Due: 5 p.m. ET 5/22/17. Docket Numbers: ER17–1524–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Attachment AF Revisions Regarding Review of Mitigated Resource Offer Costs to be effective 7/1/2017. Filed Date: 5/2/17. Accession Number: 20170502–5074. Comments Due: 5 p.m. ET 5/23/17. Docket Numbers: ER17–1525–000. Applicants: WSPP Inc. Docket Numbers: ER17–1518–000. Description: § 205(d) Rate Filing: List Applicants: Cleco Power LLC. of Members Update 2017 to be effective Description: § 205(d) Rate Filing: 4/26/2017. Reactive Power Revenue Requirements Filed Date: 5/2/17. to be effective 7/1/2017. Accession Number: 20170502–5091. Filed Date: 5/1/17. Comments Due: 5 p.m. ET 5/23/17. Accession Number: 20170501–5255. Docket Numbers: ER17–1526–000. Comments Due: 5 p.m. ET 5/22/17. Applicants: Southern California Docket Numbers: ER17–1519–000. Edison Company. Applicants: PECO Energy Company, Description: Tariff Cancellation: PJM Interconnection, L.L.C. Notices of Cancellation IFA & DSA Simi Description: § 205(d) Rate Filing: Valley Landfill Energy SA Nos. 92 & 91 PECO Energy Company submits OATT to be effective 7/16/2017. Att. H Formula Rate/Protocols to be Filed Date: 5/2/17. effective 7/1/2017. Accession Number: 20170502–5097. Filed Date: 5/1/17. Comments Due: 5 p.m. ET 5/23/17. Accession Number: 20170501–5266. Docket Numbers: ER17–1527–000. Comments Due: 5 p.m. ET 5/22/17. Applicants: Southern California Edison Company. Docket Numbers: ER17–1520–000. Description: Tariff Cancellation: Applicants: Duke Energy Carolinas, Notices of Cancellation IFA & DSA El LLC. Description: § 205(d) Rate Filing: DEC- Sobrante Landfill Energy SA Nos. 83 & 84 to be effective 7/16/2017. Lockhart Revised PPA RS No. 332 to be Filed Date: 5/2/17. effective 1/1/2016. Accession Number: 20170502–5100. Filed Date: 5/2/17. Comments Due: 5 p.m. ET 5/23/17. Accession Number: 20170502–5007. Comments Due: 5 p.m. ET 5/23/17. Take notice that the Commission received the following electric securities Docket Numbers: ER17–1521–000. filings: Applicants: PJM Interconnection, Docket Numbers: ES17–23–000. L.L.C. Applicants: Transource Maryland, Description: § 205(d) Rate Filing: 1st LLC. Quarter 2017 Updates to OA/RAA Description: Application under Member Lists to be effective 3/31/2017. Section 204 of the Federal Power Act Filed Date: 5/1/17. VerDate Sep<11>2014 18:27 May 05, 2017 Jkt 241001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 For Authorization to Issue Securities of Transource Maryland, LLC. Filed Date: 4/27/17. Accession Number: 20170427–5587. Comments Due: 5 p.m. ET 5/18/17. Docket Numbers: ES17–24–000. Applicants: Transource Pennsylvania, LLC. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of Transource Pennsylvania, LLC. Filed Date: 4/27/17. Accession Number: 20170427–5595. Comments Due: 5 p.m. ET 5/18/17. Docket Numbers: ES17–25–000; ES17–26–000; ES17–27–000; ES17–28– 000; ES17–29–000; ES17–30–000. Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc., System Energy Resources, Inc. Description: Joint Application for Authorizations under FPA Section 204 of Entergy Arkansas, Inc., et al. Filed Date: 4/28/17. Accession Number: 20170428–5564. Comments Due: 5 p.m. ET 5/19/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 2, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09251 Filed 5–5–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–219–000] Southern Star Central Gas Pipeline; Notice of Application Take notice that on April 21, 2017, Southern Star Central Gas Pipeline E:\FR\FM\08MYN1.SGM 08MYN1 asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 82, No. 87 / Monday, May 8, 2017 / Notices (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed an application pursuant to section 7(c) of the Natural Gas Act (NGA) requesting authorization to expand both vertically and laterally the existing certificated boundary of its Webb Gas Storage Field located in Grant County, Oklahoma. Southern Star states that the current operational parameters and capabilities of the Webb Gas Storage Field will remain the same and current certificated service levels to customers will not be affected, all as more fully described in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Ronnie C. Hensley, Manager, Regulatory Affairs, Southern Star Central Gas Pipeline, Inc., 4700 Highway 56, Owensboro, KY 42301, or call (270) 852–4658, or by email ronnie.c.hensley@sscgp.com. Southern Star requests that the current certificated boundary be expanded horizontally east of the current certificated boundary, in an area noted as the North Nardin Field, totaling 1,120 surface acres. Additionally, Southern Star requests that the vertical storage boundary be expanded in the KLO area to include the Oswego Limestone formation. The KLO area is a 160-acre section located in the northeast section within the field’s current certificate boundary. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all VerDate Sep<11>2014 18:27 May 05, 2017 Jkt 241001 federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 21381 to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on May 23, 2017. Dated: May 2, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09252 Filed 5–5–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER17–1522–000] Playa Solar 1, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Playa Solar 1, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 22, 2017. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the E:\FR\FM\08MYN1.SGM 08MYN1

Agencies

[Federal Register Volume 82, Number 87 (Monday, May 8, 2017)]
[Notices]
[Pages 21380-21381]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09252]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-219-000]


Southern Star Central Gas Pipeline; Notice of Application

    Take notice that on April 21, 2017, Southern Star Central Gas 
Pipeline

[[Page 21381]]

(Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed an 
application pursuant to section 7(c) of the Natural Gas Act (NGA) 
requesting authorization to expand both vertically and laterally the 
existing certificated boundary of its Webb Gas Storage Field located in 
Grant County, Oklahoma. Southern Star states that the current 
operational parameters and capabilities of the Webb Gas Storage Field 
will remain the same and current certificated service levels to 
customers will not be affected, all as more fully described in the 
application which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Ronnie C. Hensley, Manager, Regulatory Affairs, Southern Star Central 
Gas Pipeline, Inc., 4700 Highway 56, Owensboro, KY 42301, or call (270) 
852-4658, or by email ronnie.c.hensley@sscgp.com.
    Southern Star requests that the current certificated boundary be 
expanded horizontally east of the current certificated boundary, in an 
area noted as the North Nardin Field, totaling 1,120 surface acres. 
Additionally, Southern Star requests that the vertical storage boundary 
be expanded in the KLO area to include the Oswego Limestone formation. 
The KLO area is a 160-acre section located in the northeast section 
within the field's current certificate boundary.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on May 23, 2017.

    Dated: May 2, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09252 Filed 5-5-17; 8:45 am]
BILLING CODE 6717-01-P