j. City of Watervliet (Watervliet) filed
its request to use the Traditional
Licensing Process on February 28, 2017.
Watervliet provided public notice of its
request on March 3, 2017. In a letter
dated April 27, 2017, the Director of the
Division of Hydropower Licensing
approved Watervliet’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Watervliet as the Commission’s nonfederal representative for carrying out
informal consultation pursuant to
section 7 of the Endangered Species Act
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Watervliet filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 2955–
010. Pursuant to CFR 16.8, 16.9, and
16.10 each application for a subsequent
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
VerDate Sep<11>2014
17:43 May 04, 2017
Jkt 241001
All applications for license for this
project must be filed by February 29,
2020.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 27, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09109 Filed 5–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–218–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
Take notice that on April 21, 2017
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 Highway 56,
Owensboro, Kentucky 42301, filed in
the above Docket, a prior notice request
pursuant to sections 157.205, 157.208,
157.210, 157.211 and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) and Southern
Star’s blanket certificate issued in
Docket No. CP82–479–000, for
authorization to construct, relocate,
own, and operate a total of 6.76 miles
in four non-contiguous segments of 20inch-diameter Line V, and subsequently
to abandon the equivalent segment in
Noble and Logan Counties, Oklahoma,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Ronnie
C. Hensley, Manager, Regulatory
Compliance, Southern Star Central Gas
Pipelines, Inc., 4700 Highway 56,
Owensboro, Kentucky 42301, phone
(270) 852–4658, or email
Ronnie.C.Hensley@sscgp.com.
Specifically, Southern Star states that
proposed replacement will increase
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
21217
overall integrity and operational
reliability of the Line V pipeline and
allow this portion of the pipeline to
receive in-line assessment instruments
in the future. Southern Star states that
the alignment of the proposed Line V
replacement will be constructed
approximately 25 feet from and parallel
to the existing Line V pipeline except
where avoiding interference with the
footprint of Lawnview Cemetery located
in Noble County. Southern Star plans to
acquire amended easements from
adjacent landowners of the cemetery
and route the replacement pipeline
around the cemetery property on the
east side on adjacent properties. The
estimated cost of the project is $11.6
million.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
E:\FR\FM\05MYN1.SGM
05MYN1
21218
Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: April 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09111 Filed 5–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
SRADOVICH on DSK3GMQ082PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP17–633–001.
Applicants: Millennium Pipeline
Company, LLC.
Description: Millennium Pipeline
Company, LLC submits tariff filing per
154.205(b): Spot Market Price Location
Filing Amendment to be effective 6/1/
2017.
Filed Date: 04/24/2017.
Accession Number: 20170424–5237.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–668–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Texas Gas Transmission,
LLC submits tariff filing per 154.204:
Cap Rel Neg Rate Agmts—CIMA ss
Agmts (36088, 36105) to be effective 4/
3/2017.
Filed Date: 04/24/2017.
Accession Number: 20170424–5157.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–669–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: Florida Gas Transmission
Company, LLC submits tariff filing per
154.204: Flex Fuel Filing on 4–24–17 to
be effective 5/1/2017.
Filed Date: 04/24/2017.
Accession Number: 20170424–5219.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–670–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Southern Natural Gas
Company, L.L.C. submits tariff filing per
154.204: SNG Negotiated Rate Filing &
Housekeeping Filing to be effective 6/1/
2017.
Filed Date: 04/25/2017.
Accession Number: 20170425–5071.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
VerDate Sep<11>2014
17:43 May 04, 2017
Jkt 241001
Docket Numbers: RP17–671–000.
Applicants: Equitrans, L.P.
Description: Equitrans, L.P. submits
tariff filing per 154.204: NonConforming Negotiated Rate Service
Agreement—Antero Name Change to be
effective 6/10/2013.
Filed Date: 04/25/2017.
Accession Number: 20170425–5093.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–672–000.
Applicants: East Cheyenne Gas
Storage, LLC.
Description: East Cheyenne Gas
Storage, LLC submits tariff filing per
154.203: ECGS 2017 Operational
Purchase & Sales.
Filed Date: 04/25/2017.
Accession Number: 20170425–5212.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–673–000.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Annual Report of Penalty
Revenues pursuant to the FERC Gas
Tariff of Cameron Interstate Pipeline,
LLC.
Filed Date: 04/25/2017.
Accession Number: 20170425–5251.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–674–000.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Annual Report of
Interruptible Transportation Revenue
Sharing pursuant to the FERC Gas Tariff
of Cameron Interstate Pipeline, LLC.
Filed Date: 04/25/2017.
Accession Number: 20170425–5252.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–675–000.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Annual Report of
Transportation Imbalances and Cash-out
Activity pursuant to the FERC Gas Tariff
of Cameron Interstate Pipeline, LLC.
Filed Date: 04/25/2017.
Accession Number: 20170425–5253.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–676–000.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Annual Report of
Operational Imbalances and Cash-out
Activity pursuant to the FERC Gas Tariff
of Cameron Interstate Pipeline, LLC.
Filed Date: 04/25/2017.
Accession Number: 20170425–5254.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
Docket Numbers: RP17–677–000.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Applicants: Florida Southeast
Connection, LLC.
Description: Florida Southeast
Connection, LLC submits tariff filing per
154.202: Baseline Tariff Filing to be
effective 5/31/2017.
Filed Date: 04/25/2017.
Accession Number: 20170425–5279.
Comment Date: 5:00 p.m. Eastern
Time on Monday, May 08, 2017.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 26, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–09117 Filed 5–4–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2402–001.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Compliance filing:
Niagara Mohawk compliance—
Appendices of SA 316 between NMPC
& WPS Syracuse to be effective 2/15/
2011.
Filed Date: 4/28/17.
Accession Number: 20170428–5113.
Comments Due: 5 p.m. ET 5/19/17.
Docket Numbers: ER17–1488–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to SA Nos. 2554 and 3771,
Queue Nos. Z1–087 & Y1–033—MAIT
Integration to be effective 2/4/2014.
E:\FR\FM\05MYN1.SGM
05MYN1
Agencies
[Federal Register Volume 82, Number 86 (Friday, May 5, 2017)]
[Notices]
[Pages 21217-21218]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09111]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-218-000]
Southern Star Central Gas Pipeline, Inc.; Notice of Request Under
Blanket Authorization
Take notice that on April 21, 2017 Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky
42301, filed in the above Docket, a prior notice request pursuant to
sections 157.205, 157.208, 157.210, 157.211 and 157.216 of the
Commission's regulations under the Natural Gas Act (NGA) and Southern
Star's blanket certificate issued in Docket No. CP82-479-000, for
authorization to construct, relocate, own, and operate a total of 6.76
miles in four non-contiguous segments of 20-inch-diameter Line V, and
subsequently to abandon the equivalent segment in Noble and Logan
Counties, Oklahoma, all as more fully set forth in the application
which is on file with the Commission and open to public inspection.
The filing may also be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Ronnie
C. Hensley, Manager, Regulatory Compliance, Southern Star Central Gas
Pipelines, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, phone
(270) 852-4658, or email Ronnie.C.Hensley@sscgp.com.
Specifically, Southern Star states that proposed replacement will
increase overall integrity and operational reliability of the Line V
pipeline and allow this portion of the pipeline to receive in-line
assessment instruments in the future. Southern Star states that the
alignment of the proposed Line V replacement will be constructed
approximately 25 feet from and parallel to the existing Line V pipeline
except where avoiding interference with the footprint of Lawnview
Cemetery located in Noble County. Southern Star plans to acquire
amended easements from adjacent landowners of the cemetery and route
the replacement pipeline around the cemetery property on the east side
on adjacent properties. The estimated cost of the project is $11.6
million.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii)
[[Page 21218]]
and the instructions on the Commission's Web site (www.ferc.gov) under
the ``e-Filing'' link.
Dated: April 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09111 Filed 5-4-17; 8:45 am]
BILLING CODE 6717-01-P