Download as PDF SRADOVICH on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices (518) 270–3800, Email: jsmith@ watervliet.com. i. FERC Contact: Woohee Choi at (202) 502–6336 or email at woohee.choi@ferc.gov. j. City of Watervliet (Watervliet) filed its request to use the Traditional Licensing Process on February 28, 2017. Watervliet provided public notice of its request on March 3, 2017. In a letter dated April 27, 2017, the Director of the Division of Hydropower Licensing approved Watervliet’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New York State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Watervliet as the Commission’s nonfederal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and consultation pursuant to section 106 of the National Historic Preservation Act. m. Watervliet filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 2955– 010. Pursuant to CFR 16.8, 16.9, and 16.10 each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. VerDate Sep<11>2014 17:43 May 04, 2017 Jkt 241001 All applications for license for this project must be filed by February 29, 2020. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: April 27, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09109 Filed 5–4–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–218–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on April 21, 2017 Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed in the above Docket, a prior notice request pursuant to sections 157.205, 157.208, 157.210, 157.211 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and Southern Star’s blanket certificate issued in Docket No. CP82–479–000, for authorization to construct, relocate, own, and operate a total of 6.76 miles in four non-contiguous segments of 20inch-diameter Line V, and subsequently to abandon the equivalent segment in Noble and Logan Counties, Oklahoma, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Ronnie C. Hensley, Manager, Regulatory Compliance, Southern Star Central Gas Pipelines, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, phone (270) 852–4658, or email Ronnie.C.Hensley@sscgp.com. Specifically, Southern Star states that proposed replacement will increase PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 21217 overall integrity and operational reliability of the Line V pipeline and allow this portion of the pipeline to receive in-line assessment instruments in the future. Southern Star states that the alignment of the proposed Line V replacement will be constructed approximately 25 feet from and parallel to the existing Line V pipeline except where avoiding interference with the footprint of Lawnview Cemetery located in Noble County. Southern Star plans to acquire amended easements from adjacent landowners of the cemetery and route the replacement pipeline around the cemetery property on the east side on adjacent properties. The estimated cost of the project is $11.6 million. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) E:\FR\FM\05MYN1.SGM 05MYN1 21218 Federal Register / Vol. 82, No. 86 / Friday, May 5, 2017 / Notices and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: April 28, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09111 Filed 5–4–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings SRADOVICH on DSK3GMQ082PROD with NOTICES Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP17–633–001. Applicants: Millennium Pipeline Company, LLC. Description: Millennium Pipeline Company, LLC submits tariff filing per 154.205(b): Spot Market Price Location Filing Amendment to be effective 6/1/ 2017. Filed Date: 04/24/2017. Accession Number: 20170424–5237. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–668–000. Applicants: Texas Gas Transmission, LLC. Description: Texas Gas Transmission, LLC submits tariff filing per 154.204: Cap Rel Neg Rate Agmts—CIMA ss Agmts (36088, 36105) to be effective 4/ 3/2017. Filed Date: 04/24/2017. Accession Number: 20170424–5157. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–669–000. Applicants: Florida Gas Transmission Company, LLC. Description: Florida Gas Transmission Company, LLC submits tariff filing per 154.204: Flex Fuel Filing on 4–24–17 to be effective 5/1/2017. Filed Date: 04/24/2017. Accession Number: 20170424–5219. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–670–000. Applicants: Southern Natural Gas Company, L.L.C. Description: Southern Natural Gas Company, L.L.C. submits tariff filing per 154.204: SNG Negotiated Rate Filing & Housekeeping Filing to be effective 6/1/ 2017. Filed Date: 04/25/2017. Accession Number: 20170425–5071. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. VerDate Sep<11>2014 17:43 May 04, 2017 Jkt 241001 Docket Numbers: RP17–671–000. Applicants: Equitrans, L.P. Description: Equitrans, L.P. submits tariff filing per 154.204: NonConforming Negotiated Rate Service Agreement—Antero Name Change to be effective 6/10/2013. Filed Date: 04/25/2017. Accession Number: 20170425–5093. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–672–000. Applicants: East Cheyenne Gas Storage, LLC. Description: East Cheyenne Gas Storage, LLC submits tariff filing per 154.203: ECGS 2017 Operational Purchase & Sales. Filed Date: 04/25/2017. Accession Number: 20170425–5212. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–673–000. Applicants: Cameron Interstate Pipeline, LLC. Description: Annual Report of Penalty Revenues pursuant to the FERC Gas Tariff of Cameron Interstate Pipeline, LLC. Filed Date: 04/25/2017. Accession Number: 20170425–5251. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–674–000. Applicants: Cameron Interstate Pipeline, LLC. Description: Annual Report of Interruptible Transportation Revenue Sharing pursuant to the FERC Gas Tariff of Cameron Interstate Pipeline, LLC. Filed Date: 04/25/2017. Accession Number: 20170425–5252. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–675–000. Applicants: Cameron Interstate Pipeline, LLC. Description: Annual Report of Transportation Imbalances and Cash-out Activity pursuant to the FERC Gas Tariff of Cameron Interstate Pipeline, LLC. Filed Date: 04/25/2017. Accession Number: 20170425–5253. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–676–000. Applicants: Cameron Interstate Pipeline, LLC. Description: Annual Report of Operational Imbalances and Cash-out Activity pursuant to the FERC Gas Tariff of Cameron Interstate Pipeline, LLC. Filed Date: 04/25/2017. Accession Number: 20170425–5254. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. Docket Numbers: RP17–677–000. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Applicants: Florida Southeast Connection, LLC. Description: Florida Southeast Connection, LLC submits tariff filing per 154.202: Baseline Tariff Filing to be effective 5/31/2017. Filed Date: 04/25/2017. Accession Number: 20170425–5279. Comment Date: 5:00 p.m. Eastern Time on Monday, May 08, 2017. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 26, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–09117 Filed 5–4–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–2402–001. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: Compliance filing: Niagara Mohawk compliance— Appendices of SA 316 between NMPC & WPS Syracuse to be effective 2/15/ 2011. Filed Date: 4/28/17. Accession Number: 20170428–5113. Comments Due: 5 p.m. ET 5/19/17. Docket Numbers: ER17–1488–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to SA Nos. 2554 and 3771, Queue Nos. Z1–087 & Y1–033—MAIT Integration to be effective 2/4/2014. E:\FR\FM\05MYN1.SGM 05MYN1

Agencies

[Federal Register Volume 82, Number 86 (Friday, May 5, 2017)]
[Notices]
[Pages 21217-21218]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-09111]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-218-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization

    Take notice that on April 21, 2017 Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 
42301, filed in the above Docket, a prior notice request pursuant to 
sections 157.205, 157.208, 157.210, 157.211 and 157.216 of the 
Commission's regulations under the Natural Gas Act (NGA) and Southern 
Star's blanket certificate issued in Docket No. CP82-479-000, for 
authorization to construct, relocate, own, and operate a total of 6.76 
miles in four non-contiguous segments of 20-inch-diameter Line V, and 
subsequently to abandon the equivalent segment in Noble and Logan 
Counties, Oklahoma, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Ronnie 
C. Hensley, Manager, Regulatory Compliance, Southern Star Central Gas 
Pipelines, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, phone 
(270) 852-4658, or email Ronnie.C.Hensley@sscgp.com.
    Specifically, Southern Star states that proposed replacement will 
increase overall integrity and operational reliability of the Line V 
pipeline and allow this portion of the pipeline to receive in-line 
assessment instruments in the future. Southern Star states that the 
alignment of the proposed Line V replacement will be constructed 
approximately 25 feet from and parallel to the existing Line V pipeline 
except where avoiding interference with the footprint of Lawnview 
Cemetery located in Noble County. Southern Star plans to acquire 
amended easements from adjacent landowners of the cemetery and route 
the replacement pipeline around the cemetery property on the east side 
on adjacent properties. The estimated cost of the project is $11.6 
million.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii)

[[Page 21218]]

and the instructions on the Commission's Web site (www.ferc.gov) under 
the ``e-Filing'' link.

    Dated: April 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-09111 Filed 5-4-17; 8:45 am]
BILLING CODE 6717-01-P