Drawbridge Operation Regulation; Hutchinson River, New York, NY, 20257 [2017-08680]

Download as PDF Federal Register / Vol. 82, No. 82 / Monday, May 1, 2017 / Rules and Regulations no extraordinary circumstances exist that warrant preparation of an environmental assessment. Lists of Subjects in 14 CFR Part 71 Airspace, Incorporation by reference, Navigation (air). Adoption of the Amendment In consideration of the foregoing, the Federal Aviation Administration amends 14 CFR part 71 as follows: PART 71—DESIGNATION OF CLASS A, B, C, D, AND E AIRSPACE AREAS; AIR TRAFFIC SERVICE ROUTES; AND REPORTING POINTS 1. The authority citation for Part 71 continues to read as follows: ■ Authority: 49 U.S.C. 106(f), 106(g); 40103, 40113, 40120; E.O. 10854, 24 FR 9565, 3 CFR, 1959–1963 Comp., p. 389. § 71.1 [Amended] 2. The incorporation by reference in 14 CFR 71.1 of FAA Order 7400.11A, Airspace Designations and Reporting Points, dated August 3, 2016, and effective September 15, 2016, is amended as follows: ■ Paragraph 6005 Class E Airspace Areas Extending Upward From 700 Feet or More Above the Surface of the Earth. * * * ASW LA E5 * * * * Ruston, LA [Removed] * * * ASW LA E5 Ruston, LA [New] Ruston Regional Airport, LA (Lat. 32°30′53″ N., long. 92°35′18″ W.) That airspace extending upward from 700 feet above the surface within a 6.5-mile radius of the airport. Issued in Fort Worth, Texas, on April 24, 2017. Walter Tweedy, Acting Manager, Operations Support Group, ATO Central Service Center. [FR Doc. 2017–08749 Filed 4–28–17; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 mstockstill on DSK30JT082PROD with RULES [Docket No. USCG–2017–0231] Drawbridge Operation Regulation; Hutchinson River, New York, NY Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: VerDate Sep<11>2014 16:41 Apr 28, 2017 Jkt 241001 The Coast Guard has issued a temporary deviation from the operating schedule that governs the Hutchinson River Parkway Bridge across the Hutchinson River, mile 0.9 at New York, New York. This deviation is necessary to complete application of protective coating on the bridge as well as maintenance of operating machinery. DATES: This deviation is effective without actual notice from May 1, 2017 through 12:01 a.m. on September 29, 2017. For the purposes of enforcement, actual notice will be used from 12:01 a.m. on April 3, 2017 until May 1, 2017. ADDRESSES: The docket for this deviation, USCG–2017–0231 is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email James M. Moore, Bridge Management Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 212–514–4334, email james.m.moore2@uscg.mil. SUPPLEMENTARY INFORMATION: The New York City Department of Transportation, the owner of the bridge, requested a temporary deviation from the normal operating schedule to facilitate application of protective coating to the bridge as well as maintenance of operating machinery. The Hutchinson River Parkway Bridge, across the Hutchinson River, mile 0.9 at New York, New York has a vertical clearance of 30 feet at mean high water and 38 feet at mean low water in the closed position. The existing drawbridge operating regulations are listed at 33 CFR 117.793(b). Under this temporary deviation, between April 3, 2017 and September 29, 2017 the draw of the Hutchinson River Parkway Bridge will be closed to navigation for a period not to exceed 7 days; the draw will then open for vessels in accordance with established operating regulations for a period not to exceed another 7 days, after which the cycle will repeat. Vessels that can pass under the bridge without an opening may do so at all times. The bridge will not be able to open for emergencies. There is no alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. SUMMARY: PO 00000 Frm 00017 Fmt 4700 Sfmt 4700 20257 In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 25, 2017. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2017–08680 Filed 4–28–17; 8:45 am] BILLING CODE 9110–04–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R01–OAR–2017–0024; A–1–FRL– 9961–42–Region 1] Air Plan Approval; ME; Emission Statement Reporting Environmental Protection Agency (EPA). ACTION: Direct final rule. AGENCY: The Environmental Protection Agency (EPA) is approving a State Implementation Plan (SIP) revision submitted by the State of Maine. The revision updates Maine’s emissions reporting requirements for certain stationary sources that emit criteria pollutants. The intended effect of this action is to approve the revision into the Maine SIP. This action is being taken under the Clean Air Act (CAA). DATES: This direct final rule is effective June 30, 2017, unless EPA receives adverse comments by May 31, 2017. If adverse comments are received, EPA will publish a timely withdrawal of the direct final rule in the Federal Register informing the public that the rule will not take effect. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–R01– OAR–2017–0024 at https:// www.regulations.gov, or via email to Mackintosh.David@epa.gov. For comments submitted at Regulations.gov, follow the online instructions for submitting comments. Once submitted, comments cannot be edited or removed from Regulations.gov. For either manner of submission, the EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the SUMMARY: E:\FR\FM\01MYR1.SGM 01MYR1

Agencies

[Federal Register Volume 82, Number 82 (Monday, May 1, 2017)]
[Rules and Regulations]
[Page 20257]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-08680]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0231]


Drawbridge Operation Regulation; Hutchinson River, New York, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Hutchinson River Parkway Bridge 
across the Hutchinson River, mile 0.9 at New York, New York. This 
deviation is necessary to complete application of protective coating on 
the bridge as well as maintenance of operating machinery.

DATES: This deviation is effective without actual notice from May 1, 
2017 through 12:01 a.m. on September 29, 2017. For the purposes of 
enforcement, actual notice will be used from 12:01 a.m. on April 3, 
2017 until May 1, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0231 is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email James M. Moore, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
212-514-4334, email james.m.moore2@uscg.mil.

SUPPLEMENTARY INFORMATION: The New York City Department of 
Transportation, the owner of the bridge, requested a temporary 
deviation from the normal operating schedule to facilitate application 
of protective coating to the bridge as well as maintenance of operating 
machinery. The Hutchinson River Parkway Bridge, across the Hutchinson 
River, mile 0.9 at New York, New York has a vertical clearance of 30 
feet at mean high water and 38 feet at mean low water in the closed 
position. The existing drawbridge operating regulations are listed at 
33 CFR 117.793(b).
    Under this temporary deviation, between April 3, 2017 and September 
29, 2017 the draw of the Hutchinson River Parkway Bridge will be closed 
to navigation for a period not to exceed 7 days; the draw will then 
open for vessels in accordance with established operating regulations 
for a period not to exceed another 7 days, after which the cycle will 
repeat.
    Vessels that can pass under the bridge without an opening may do so 
at all times. The bridge will not be able to open for emergencies. 
There is no alternate route for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: April 25, 2017.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-08680 Filed 4-28-17; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.