Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 19710 [2017-08567]

Download as PDF 19710 Federal Register / Vol. 82, No. 81 / Friday, April 28, 2017 / Notices clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 21, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–08569 Filed 4–27–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–141–000] asabaliauskas on DSK3SPTVN1PROD with NOTICES Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on April 11, 2017, Texas Gas Transmission, LLC (Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed a prior notice application pursuant to sections 157.205, and 157.216(b) of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA), and Texas Gas’ blanket certificate issued in Docket No. CP82–407–000. Texas Gas requests authorization to abandon certain natural gas pipeline assets, ancillary auxiliary facilities and appurtenances, located in Terrebonne Parish, Louisiana and Louisiana State waters. Specifically, Texas Gas proposes to: (1) Abandon in place 3.61 miles of 8-inch-diameter pipeline known as the Bay Junop to Bay Round 8-inch pipeline; (3) abandon in place approximately 10.05 miles and abandon by removal approximately 0.24 miles of 8-inch-diameter pipeline, known as the Bay Round to Block 8 8inch pipeline; and (3) abandon by removal the Bay Round Platform and the Brammer Old Camp Pass Platform, all as more fully set forth in the application, which is open to the public for inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call VerDate Sep<11>2014 17:38 Apr 27, 2017 Jkt 241001 toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Kathy D. Fort, Manager, Certificates and Tariffs, Texas Gas Transmission, LLC, 610 West 2nd Street, Owensboro, Kentucky 42301 or phone (270) 688– 6825, or by email kathy.fort@ bwpmlp.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 documents on all other parties. However, the non-party commenter will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: April 21, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–08567 Filed 4–27–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc. (NYISO): NYISO Electric System Planning Working Group Meeting May 5, 2017, 10:00 a.m.–3:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ committees/documents.jsp?com=bic_ espwg&directory=2017-05-05. NYISO Business Issues Committee Meeting May 17, 2017, 10:00 a.m.–12:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ committees/documents.jsp?com=bic& directory=2017-05-17. E:\FR\FM\28APN1.SGM 28APN1

Agencies

[Federal Register Volume 82, Number 81 (Friday, April 28, 2017)]
[Notices]
[Page 19710]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-08567]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-141-000]


Texas Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on April 11, 2017, Texas Gas Transmission, LLC 
(Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed 
a prior notice application pursuant to sections 157.205, and 157.216(b) 
of the Federal Energy Regulatory Commission's (Commission) regulations 
under the Natural Gas Act (NGA), and Texas Gas' blanket certificate 
issued in Docket No. CP82-407-000. Texas Gas requests authorization to 
abandon certain natural gas pipeline assets, ancillary auxiliary 
facilities and appurtenances, located in Terrebonne Parish, Louisiana 
and Louisiana State waters. Specifically, Texas Gas proposes to: (1) 
Abandon in place 3.61 miles of 8-inch-diameter pipeline known as the 
Bay Junop to Bay Round 8-inch pipeline; (3) abandon in place 
approximately 10.05 miles and abandon by removal approximately 0.24 
miles of 8-inch-diameter pipeline, known as the Bay Round to Block 8 8-
inch pipeline; and (3) abandon by removal the Bay Round Platform and 
the Brammer Old Camp Pass Platform, all as more fully set forth in the 
application, which is open to the public for inspection. The filing may 
also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or 
TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Kathy D. Fort, Manager, Certificates and Tariffs, Texas Gas 
Transmission, LLC, 610 West 2nd Street, Owensboro, Kentucky 42301 or 
phone (270) 688-6825, or by email kathy.fort@bwpmlp.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenter will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: April 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-08567 Filed 4-27-17; 8:45 am]
BILLING CODE 6717-01-P