Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 19710 [2017-08567]
Download as PDF
19710
Federal Register / Vol. 82, No. 81 / Friday, April 28, 2017 / Notices
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–08569 Filed 4–27–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–141–000]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Texas Gas Transmission, LLC; Notice
of Request Under Blanket
Authorization
Take notice that on April 11, 2017,
Texas Gas Transmission, LLC (Texas
Gas), 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, filed a prior
notice application pursuant to sections
157.205, and 157.216(b) of the Federal
Energy Regulatory Commission’s
(Commission) regulations under the
Natural Gas Act (NGA), and Texas Gas’
blanket certificate issued in Docket No.
CP82–407–000. Texas Gas requests
authorization to abandon certain natural
gas pipeline assets, ancillary auxiliary
facilities and appurtenances, located in
Terrebonne Parish, Louisiana and
Louisiana State waters. Specifically,
Texas Gas proposes to: (1) Abandon in
place 3.61 miles of 8-inch-diameter
pipeline known as the Bay Junop to Bay
Round 8-inch pipeline; (3) abandon in
place approximately 10.05 miles and
abandon by removal approximately 0.24
miles of 8-inch-diameter pipeline,
known as the Bay Round to Block 8 8inch pipeline; and (3) abandon by
removal the Bay Round Platform and
the Brammer Old Camp Pass Platform,
all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
VerDate Sep<11>2014
17:38 Apr 27, 2017
Jkt 241001
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Kathy
D. Fort, Manager, Certificates and
Tariffs, Texas Gas Transmission, LLC,
610 West 2nd Street, Owensboro,
Kentucky 42301 or phone (270) 688–
6825, or by email kathy.fort@
bwpmlp.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: April 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–08567 Filed 4–27–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc. (NYISO):
NYISO Electric System Planning
Working Group Meeting
May 5, 2017, 10:00 a.m.–3:00 p.m. (EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2017-05-05.
NYISO Business Issues Committee
Meeting
May 17, 2017, 10:00 a.m.–12:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic&
directory=2017-05-17.
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 82, Number 81 (Friday, April 28, 2017)]
[Notices]
[Page 19710]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-08567]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-141-000]
Texas Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on April 11, 2017, Texas Gas Transmission, LLC
(Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed
a prior notice application pursuant to sections 157.205, and 157.216(b)
of the Federal Energy Regulatory Commission's (Commission) regulations
under the Natural Gas Act (NGA), and Texas Gas' blanket certificate
issued in Docket No. CP82-407-000. Texas Gas requests authorization to
abandon certain natural gas pipeline assets, ancillary auxiliary
facilities and appurtenances, located in Terrebonne Parish, Louisiana
and Louisiana State waters. Specifically, Texas Gas proposes to: (1)
Abandon in place 3.61 miles of 8-inch-diameter pipeline known as the
Bay Junop to Bay Round 8-inch pipeline; (3) abandon in place
approximately 10.05 miles and abandon by removal approximately 0.24
miles of 8-inch-diameter pipeline, known as the Bay Round to Block 8 8-
inch pipeline; and (3) abandon by removal the Bay Round Platform and
the Brammer Old Camp Pass Platform, all as more fully set forth in the
application, which is open to the public for inspection. The filing may
also be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or
TTY, (202) 502-8659.
Any questions regarding this application should be directed to
Kathy D. Fort, Manager, Certificates and Tariffs, Texas Gas
Transmission, LLC, 610 West 2nd Street, Owensboro, Kentucky 42301 or
phone (270) 688-6825, or by email kathy.fort@bwpmlp.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: April 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-08567 Filed 4-27-17; 8:45 am]