Download as PDF Federal Register / Vol. 82, No. 78 / Tuesday, April 25, 2017 / Notices asabaliauskas on DSK3SPTVN1PROD with NOTICES module floors, and precast panel floors; main control room and instrumentation and control room ceilings; and the location of heating, ventilation, and air conditioning ducts in the main control room floor, as well as the number of supporting steel plates. General changes include various notes that explain the extent of variations in the specific design of these structures. Date of issuance: March 27, 2017. Effective date: As of the date of issuance and shall be implemented within 30 days of issuance. Amendment Nos.: 75 (Unit 3) and 74 (Unit 4). A publicly-available version is in ADAMS under Accession No. ML17037D024; documents related to these amendments are listed in the Safety Evaluation enclosed with the amendments. Facility Combined Licenses No. NPF– 91 and NPF–92: Amendments revised the Facility Combined Licenses. Date of initial notice in Federal Register: August 2, 2016 (81 FR 50738). By letter dated August 12, 2016, the licensee provided additional information that expanded the scope of the amendment request as originally noticed in the Federal Register. Accordingly, the NRC published a second proposed no significant hazards consideration determination in the Federal Register on September 13, 2016 (81 FR 62932), which superseded the original notice in its entirety. The supplemental letters dated October 12, 2016, and December 16, 2016, provided additional information that clarified the application, did not expand the scope of the application request as noticed on September 13, 2016, and did not change the staff’s proposed no significant hazards consideration determination as published in the Federal Register on September 13, 2016. The Commission’s related evaluation of the amendments is contained in a Safety Evaluation dated March 27, 2017. No significant hazards consideration comments received: No. Tennessee Valley Authority, Docket No. 50–391, Watts Bar Nuclear Plant, Unit 2, Rhea County, Tennessee Date of amendment request: November 23, 2016, as supplemented by letter dated February 16, 2017. Brief description of amendment: The amendment revised Technical Specification Surveillance Requirement (SR) 3.0.2 to extend, on a one-time basis, SRs listed in Attachments 8, 10, and 11 to Enclosure 1 of the application that are normally performed on an 18-month frequency in conjunction with a refueling outage. The change extends the due date for these SRs to October 31, VerDate Sep<11>2014 18:37 Apr 24, 2017 Jkt 241001 2017, which allows these SRs to be performed during the first refueling outage for the Watts Bar Nuclear Plant, Unit 2. Date of issuance: April 7, 2017. Effective date: As of the date of issuance and shall be implemented within 7 days of issuance. Amendment No.: 10. A publiclyavailable version is in ADAMS under Accession No. ML17074A501; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment. Facility Operating License No NPF– 96: Amendment revised the Facility Operating License and Technical Specifications. Date of initial notice in Federal Register: January 17, 2017 (82 FR 4932). The supplemental letter dated February 16, 2017, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff’s original proposed no significant hazards consideration determination as published in the Federal Register. The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated April 7, 2017. No significant hazards consideration comments received. No. Tennessee Valley Authority, Docket Nos. 50–390 and 50–391, Watts Bar Nuclear Plant (WBN), Units 1 and 2, Rhea County, Tennessee Date of amendment request: June 7, 2016. Brief description of amendments: The amendments revised an expired footnote in WBN, Unit 1, Technical Specification (TS) 3.7.11, and corrects several editorial inconsistencies in the TS Applicability statements for WBN, Units 1 and 2. Additionally, WBN, Unit 2, TS 3.7.10, Actions, are amended to include a new TS Condition, which specifies shutdown Required Actions and associated Completion Time when TS Condition E is not met (i.e., two CREVS [control room emergency ventilation system] trains are inoperable for longer than allowed due to actions taken because of a tornado warning). Date of issuance: March 28, 2017. Effective date: As of the date of issuance and shall be implemented within 60 days of issuance. Amendment Nos.: 112 (Unit 1) and 9 (Unit 2). A publicly-available version is in ADAMS under Accession No. ML16330A347; documents related to these amendments are listed in the Safety Evaluation enclosed with the amendments. PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 19111 Facility Operating License Nos. NPF– 90 and NPF–96: The amendments revised the Facility Operating Licenses and TSs. Date of initial notice in Federal Register: August 2, 2016 (81 FR 50740). The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated March 28, 2017. No significant hazards consideration comments received: No. Dated at Rockville, Maryland, this 13th day of April 2017. For the Nuclear Regulatory Commission. Eric J. Benner, Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2017–08115 Filed 4–24–17; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Power Uprates; Notice of Meeting The ACRS Subcommittee on Power Uprates will hold a meeting on May 3, 2017, at 11545 Rockville Pike, Room T– 2B1, Rockville, Maryland 20852. The meeting will be open to public attendance with the exception of portions that may be closed to protect information that is proprietary pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting shall be as follows: Wednesday, May 3, 2017—8:30 a.m. Until 5:00 p.m. The Subcommittee will review the Safety Evaluation Report associated with the Browns Ferry extended power uprate application. The Subcommittee will hear presentations by and hold discussions with the NRC staff and other interested persons regarding this matter. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Weidong Wang (Telephone 301–415–6279 or Email: Weidong.Wang@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day E:\FR\FM\25APN1.SGM 25APN1 19112 Federal Register / Vol. 82, No. 78 / Tuesday, April 25, 2017 / Notices before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 17, 2016, (81 FR 71543). Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained from the Web site cited above or by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, Maryland 20852. After registering with Security, please contact Mr. Theron Brown (Telephone 240– 888–9835) to be escorted to the meeting room. Dated: April 19, 2017. Mark L. Banks, Branch Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2017–08338 Filed 4–24–17; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION asabaliauskas on DSK3SPTVN1PROD with NOTICES Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting The ACRS Subcommittee on Planning and Procedures will hold a meeting on May 3, 2017, 11545 Rockville Pike, Room T–2B3, Rockville, Maryland 20852. The meeting will be open to public attendance. The agenda for the subject meeting shall be as follows: VerDate Sep<11>2014 17:42 Apr 24, 2017 Jkt 241001 Wednesday, May 3, 2017—12:00 p.m. Until 1:00 p.m. NUCLEAR REGULATORY COMMISSION The Subcommittee will discuss proposed ACRS activities and related matters. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Quynh Nguyen (Telephone 301–415–5844 or Email: Quynh.Nguyen@nrc.gov) five days prior to the meeting, if possible, so that arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 17, 2016, (81 FR 71543). Information regarding changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with the DFO if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, Maryland 20852. After registering with Security, please contact Mr. Theron Brown at 240–888–9835 to be escorted to the meeting room. Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Reliability and Probabilistic Risk Assessment; Notice of Meeting Dated: April 19, 2017. Mark L. Banks, Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2017–08339 Filed 4–24–17; 8:45 am] BILLING CODE 7590–01–P PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 The ACRS Subcommittee on Reliability and Probabilistic Risk Assessment will hold a meeting on May 2, 2017, at 11545 Rockville Pike, Room T–2B1, Rockville, Maryland 20852. The meeting will be open to public attendance with the exception of portions that may be closed to protect information that is proprietary pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting shall be as follows: Tuesday, May 2, 2017—8:30 a.m. Until 5:00 p.m. The Subcommittee will review the Level 3 PRA and will hear presentations by and hold discussions with the NRC staff and other interested persons regarding this matter. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Christiana Lui (Telephone 301–415–2492 or Email Christiana.Lui@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 17, 2016, (81 FR 71543). Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained E:\FR\FM\25APN1.SGM 25APN1

Agencies

[Federal Register Volume 82, Number 78 (Tuesday, April 25, 2017)]
[Notices]
[Pages 19111-19112]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-08338]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards (ACRS) Meeting of the 
ACRS Subcommittee on Power Uprates; Notice of Meeting

    The ACRS Subcommittee on Power Uprates will hold a meeting on May 
3, 2017, at 11545 Rockville Pike, Room T-2B1, Rockville, Maryland 
20852.
    The meeting will be open to public attendance with the exception of 
portions that may be closed to protect information that is proprietary 
pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting 
shall be as follows:

Wednesday, May 3, 2017--8:30 a.m. Until 5:00 p.m.

    The Subcommittee will review the Safety Evaluation Report 
associated with the Browns Ferry extended power uprate application. The 
Subcommittee will hear presentations by and hold discussions with the 
NRC staff and other interested persons regarding this matter. The 
Subcommittee will gather information, analyze relevant issues and 
facts, and formulate proposed positions and actions, as appropriate, 
for deliberation by the Full Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated Federal Official (DFO), 
Weidong Wang (Telephone 301-415-6279 or Email: Weidong.Wang@nrc.gov) 
five days prior to the meeting, if possible, so that appropriate 
arrangements can be made. Thirty-five hard copies of each presentation 
or handout should be provided to the DFO thirty minutes before the 
meeting. In addition, one electronic copy of each presentation should 
be emailed to the DFO one day

[[Page 19112]]

before the meeting. If an electronic copy cannot be provided within 
this timeframe, presenters should provide the DFO with a CD containing 
each presentation at least thirty minutes before the meeting. 
Electronic recordings will be permitted only during those portions of 
the meeting that are open to the public. Detailed procedures for the 
conduct of and participation in ACRS meetings were published in the 
Federal Register on October 17, 2016, (81 FR 71543).
    Detailed meeting agendas and meeting transcripts are available on 
the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/acrs. 
Information regarding topics to be discussed, changes to the agenda, 
whether the meeting has been canceled or rescheduled, and the time 
allotted to present oral statements can be obtained from the Web site 
cited above or by contacting the identified DFO. Moreover, in view of 
the possibility that the schedule for ACRS meetings may be adjusted by 
the Chairman as necessary to facilitate the conduct of the meeting, 
persons planning to attend should check with these references if such 
rescheduling would result in a major inconvenience.
    If attending this meeting, please enter through the One White Flint 
North building, 11555 Rockville Pike, Rockville, Maryland 20852. After 
registering with Security, please contact Mr. Theron Brown (Telephone 
240-888-9835) to be escorted to the meeting room.

    Dated: April 19, 2017.
Mark L. Banks,
 Branch Chief, Technical Support Branch, Advisory Committee on Reactor 
Safeguards.
[FR Doc. 2017-08338 Filed 4-24-17; 8:45 am]