Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act, 18136 [2017-07703]
Download as PDF
18136
Federal Register / Vol. 82, No. 72 / Monday, April 17, 2017 / Notices
DEPARTMENT OF ENERGY
[Certification Notice—246]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Filing.
Issued in Washington, DC on April 11,
2017.
Brian Mills,
Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2017–07703 Filed 4–14–17; 8:45 am]
BILLING CODE 6450–01–P
AGENCY:
DEPARTMENT OF ENERGY
On March 30, 2017, Carroll
County Energy, LLC, as owner and
operator of a new baseload electric
generating powerplant, submitted a coal
capability self-certification to the
Department of Energy (DOE) pursuant to
the Powerplant and Industrial Fuel Use
Act of 1978 (FUA), as amended, and
DOE regulations. The FUA and
regulations thereunder require DOE to
publish a notice of filing of selfcertification in the Federal Register.
ADDRESSES: Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
SUMMARY:
Title II of
FUA, as amended (42 U.S.C. 8301 et
seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to the
FUA, in order to meet the requirement
of coal capability, the owner or operator
of such a facility proposing to use
natural gas or petroleum as its primary
energy source shall certify to the
Secretary of Energy (Secretary) prior to
construction, or prior to operation as a
base load electric powerplant, that such
powerplant has the capability to use
coal or another alternate fuel. Such
certification establishes compliance
with FUA section 201(a) as of the date
it is filed with the Secretary. 42 U.S.C.
8311.
The following owner of a proposed
new baseload electric generating
powerplant has filed a self-certification
of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance
with DOE regulations in 10 CFR 501.60,
61:
Owner: Carroll County Energy, LLC.
Capacity: 672 megawatts (MW).
Plant Location: Carrollton, OH 44616.
In-Service Date: December 1, 2017.
mstockstill on DSK30JT082PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
17:14 Apr 14, 2017
Jkt 241001
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–96–000.
Applicants: Santa Rita Wind Energy
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Santa Rita Wind
Energy LLC.
Filed Date: 4/7/17.
Accession Number: 20170407–5260.
Comments Due: 5 p.m. ET 4/28/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1530–000.
Applicants: BIF III Holtwood LLC.
Description: Report Filing: Refund
Report BIF III Holtwood to be effective
N/A.
Filed Date: 4/10/17.
Accession Number: 20170410–5196.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1025–002.
Applicants: Cedar Point Wind, LLC.
Description: Tariff Amendment:
Recollation Amendment Title Page and
Header Revisions to be effective 2/24/
2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5054.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1026–002.
Applicants: Silver State Solar Power
North, LLC.
Description: Tariff Amendment: SSN
Recollation Amendment Title Page and
Header to be effective 2/24/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5099.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1394–000.
Applicants: 83WI 8me, LLC.
Description: Baseline eTariff Filing:
83WI 8me Initial MBR Application and
Request for Expedited Consideration to
be effective 5/19/2017.
Filed Date: 4/7/17.
Accession Number: 20170407–5261.
Comments Due: 5 p.m. ET 4/28/17.
Docket Numbers: ER17–1395–000.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement No.
4320, Queue No. AA1–109 to be
effective 12/3/2015.
Filed Date: 4/10/17.
Accession Number: 20170410–5109.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1396–000.
Applicants: MATL LLP.
Description: § 205(d) Rate Filing:
MATL Table of Contents Revisions to be
effective 4/11/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5120.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1397–000.
Applicants: MATL LLP.
Description: Tariff Cancellation:
MATL ColumbiaGrid Agreement
Cancellation to be effective 4/11/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5122.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1398–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
807—LGIA with Buffalo Trail Wind
Farm LLC to be effective 6/10/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5195.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1399–000.
Applicants: Interstate Power and
Light Company, ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Amended Operating and Transmission
Agreement Exhibits and Appendices to
be effective 6/9/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5197.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1400–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of a Joint Use Pole and Facility
Construction Agreement to be effective
6/9/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5198.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1401–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSC–PRPA–414–0.0.0 to be effective 4/
16/2016.
Filed Date: 4/10/17.
Accession Number: 20170410–5203.
Comments Due: 5 p.m. ET 5/1/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–16–000.
Applicants: MDU Resources Group,
Inc.
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 82, Number 72 (Monday, April 17, 2017)]
[Notices]
[Page 18136]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-07703]
[[Page 18136]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Certification Notice--246]
Notice of Filing of Self-Certification of Coal Capability Under
the Powerplant and Industrial Fuel Use Act
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Filing.
-----------------------------------------------------------------------
SUMMARY: On March 30, 2017, Carroll County Energy, LLC, as owner and
operator of a new baseload electric generating powerplant, submitted a
coal capability self-certification to the Department of Energy (DOE)
pursuant to the Powerplant and Industrial Fuel Use Act of 1978 (FUA),
as amended, and DOE regulations. The FUA and regulations thereunder
require DOE to publish a notice of filing of self-certification in the
Federal Register.
ADDRESSES: Copies of coal capability self-certification filings are
available for public inspection, upon request, in the Office of
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC
20585.
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.
SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301
et seq.), provides that no new base load electric powerplant may be
constructed or operated without the capability to use coal or another
alternate fuel as a primary energy source. Pursuant to the FUA, in
order to meet the requirement of coal capability, the owner or operator
of such a facility proposing to use natural gas or petroleum as its
primary energy source shall certify to the Secretary of Energy
(Secretary) prior to construction, or prior to operation as a base load
electric powerplant, that such powerplant has the capability to use
coal or another alternate fuel. Such certification establishes
compliance with FUA section 201(a) as of the date it is filed with the
Secretary. 42 U.S.C. 8311.
The following owner of a proposed new baseload electric generating
powerplant has filed a self-certification of coal-capability with DOE
pursuant to FUA section 201(d) and in accordance with DOE regulations
in 10 CFR 501.60, 61:
Owner: Carroll County Energy, LLC.
Capacity: 672 megawatts (MW).
Plant Location: Carrollton, OH 44616.
In-Service Date: December 1, 2017.
Issued in Washington, DC on April 11, 2017.
Brian Mills,
Office of Electricity Delivery and Energy Reliability.
[FR Doc. 2017-07703 Filed 4-14-17; 8:45 am]
BILLING CODE 6450-01-P