Northern Natural Gas Company; Notice of Request Under Blanket Authorization, 18137 [2017-07694]
Download as PDF
Federal Register / Vol. 82, No. 72 / Monday, April 17, 2017 / Notices
Description: Application pursuant to
Section 204 of the Federal Power Act of
MDU Resources Group, Inc.
Filed Date: 4/7/17.
Accession Number: 20170407–5306.
Comments Due: 5 p.m. ET 4/28/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–07691 Filed 4–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–116–000]
mstockstill on DSK30JT082PROD with NOTICES
Northern Natural Gas Company; Notice
of Request Under Blanket
Authorization
Take notice that on March 30, 2017,
Northern Natural Gas Company.
(‘‘Northern’’), 1111 South 103rd Street,
Omaha, Nebraska 68124–1000, filed a
prior notice application pursuant to
sections 157.205, 157.210 and 157.216
of the Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Northern’s blanket certificate issued in
Docket No. CP82–401–000. Northern
requests authorization to: (1) Construct
and operate two mainline pipeline
extension segments totaling
approximately 2.25 miles of its existing
30-inch and 36-inch-diameter pipelines
and (2) abandon short segments of
pipeline, all located in Dakota County,
Minnesota, and Worth County, Iowa, all
as more fully set forth in the request,
which is on file with the Commission
and open to public inspection. The
proposed project is referred to as the
VerDate Sep<11>2014
17:14 Apr 14, 2017
Jkt 241001
Ventura North A-line Capacity
Replacement Project (Project). The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically Northern proposes to: (1)
Construct 1.24-mile extension of
Northern’s existing 30-inch-diameter Dline located in Sections 16, 21 and 22,
Township 112 North, Range 20 West,
Greenvale Township, Dakota County,
Minnesota; (2) construct 1.01-mile
extension of Northern’s 36-inchdiameter E-line located in Sections 9
and 16, Township 100 North, Range 22
West, Silver Lake Township, Worth
County, Iowa; (3) remove approximately
10 feet of 16-inch-diameter pipe; (4)
remove approximately 80 feet of 30inch-diameter pipe from the D-line in
Dakota County, Minnesota; (5) remove
approximately 10 feet of 12-inchdiameter pipe and (6) remove
approximately 20 feet of 24-inchdiameter pipe from the E-line in Worth
County, Iowa.
Any questions regarding this
application should be directed to Dari R.
Dornan Senior Counsel, Northern
Natural Gas Company, P.O. Box 3330,
Omaha, Nebraska 68103–0330 or phone
(402) 398–7077, or by email at
dari.dornan@nngco.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
18137
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Dated: April 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–07694 Filed 4–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1392–000]
El Cabo Wind LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of El Cabo
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 82, Number 72 (Monday, April 17, 2017)]
[Notices]
[Page 18137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-07694]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-116-000]
Northern Natural Gas Company; Notice of Request Under Blanket
Authorization
Take notice that on March 30, 2017, Northern Natural Gas Company.
(``Northern''), 1111 South 103rd Street, Omaha, Nebraska 68124-1000,
filed a prior notice application pursuant to sections 157.205, 157.210
and 157.216 of the Federal Energy Regulatory Commission's (Commission)
regulations under the Natural Gas Act (NGA), and Northern's blanket
certificate issued in Docket No. CP82-401-000. Northern requests
authorization to: (1) Construct and operate two mainline pipeline
extension segments totaling approximately 2.25 miles of its existing
30-inch and 36-inch-diameter pipelines and (2) abandon short segments
of pipeline, all located in Dakota County, Minnesota, and Worth County,
Iowa, all as more fully set forth in the request, which is on file with
the Commission and open to public inspection. The proposed project is
referred to as the Ventura North A-line Capacity Replacement Project
(Project). The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Specifically Northern proposes to: (1) Construct 1.24-mile
extension of Northern's existing 30-inch-diameter D-line located in
Sections 16, 21 and 22, Township 112 North, Range 20 West, Greenvale
Township, Dakota County, Minnesota; (2) construct 1.01-mile extension
of Northern's 36-inch-diameter E-line located in Sections 9 and 16,
Township 100 North, Range 22 West, Silver Lake Township, Worth County,
Iowa; (3) remove approximately 10 feet of 16-inch-diameter pipe; (4)
remove approximately 80 feet of 30-inch-diameter pipe from the D-line
in Dakota County, Minnesota; (5) remove approximately 10 feet of 12-
inch-diameter pipe and (6) remove approximately 20 feet of 24-inch-
diameter pipe from the E-line in Worth County, Iowa.
Any questions regarding this application should be directed to Dari
R. Dornan Senior Counsel, Northern Natural Gas Company, P.O. Box 3330,
Omaha, Nebraska 68103-0330 or phone (402) 398-7077, or by email at
dari.dornan@nngco.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
Dated: April 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-07694 Filed 4-14-17; 8:45 am]
BILLING CODE 6717-01-P