Combined Notice of Filings #1, 18136-18137 [2017-07691]
Download as PDF
18136
Federal Register / Vol. 82, No. 72 / Monday, April 17, 2017 / Notices
DEPARTMENT OF ENERGY
[Certification Notice—246]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Filing.
Issued in Washington, DC on April 11,
2017.
Brian Mills,
Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2017–07703 Filed 4–14–17; 8:45 am]
BILLING CODE 6450–01–P
AGENCY:
DEPARTMENT OF ENERGY
On March 30, 2017, Carroll
County Energy, LLC, as owner and
operator of a new baseload electric
generating powerplant, submitted a coal
capability self-certification to the
Department of Energy (DOE) pursuant to
the Powerplant and Industrial Fuel Use
Act of 1978 (FUA), as amended, and
DOE regulations. The FUA and
regulations thereunder require DOE to
publish a notice of filing of selfcertification in the Federal Register.
ADDRESSES: Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
SUMMARY:
Title II of
FUA, as amended (42 U.S.C. 8301 et
seq.), provides that no new base load
electric powerplant may be constructed
or operated without the capability to use
coal or another alternate fuel as a
primary energy source. Pursuant to the
FUA, in order to meet the requirement
of coal capability, the owner or operator
of such a facility proposing to use
natural gas or petroleum as its primary
energy source shall certify to the
Secretary of Energy (Secretary) prior to
construction, or prior to operation as a
base load electric powerplant, that such
powerplant has the capability to use
coal or another alternate fuel. Such
certification establishes compliance
with FUA section 201(a) as of the date
it is filed with the Secretary. 42 U.S.C.
8311.
The following owner of a proposed
new baseload electric generating
powerplant has filed a self-certification
of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance
with DOE regulations in 10 CFR 501.60,
61:
Owner: Carroll County Energy, LLC.
Capacity: 672 megawatts (MW).
Plant Location: Carrollton, OH 44616.
In-Service Date: December 1, 2017.
mstockstill on DSK30JT082PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
17:14 Apr 14, 2017
Jkt 241001
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–96–000.
Applicants: Santa Rita Wind Energy
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Santa Rita Wind
Energy LLC.
Filed Date: 4/7/17.
Accession Number: 20170407–5260.
Comments Due: 5 p.m. ET 4/28/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1530–000.
Applicants: BIF III Holtwood LLC.
Description: Report Filing: Refund
Report BIF III Holtwood to be effective
N/A.
Filed Date: 4/10/17.
Accession Number: 20170410–5196.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1025–002.
Applicants: Cedar Point Wind, LLC.
Description: Tariff Amendment:
Recollation Amendment Title Page and
Header Revisions to be effective 2/24/
2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5054.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1026–002.
Applicants: Silver State Solar Power
North, LLC.
Description: Tariff Amendment: SSN
Recollation Amendment Title Page and
Header to be effective 2/24/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5099.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1394–000.
Applicants: 83WI 8me, LLC.
Description: Baseline eTariff Filing:
83WI 8me Initial MBR Application and
Request for Expedited Consideration to
be effective 5/19/2017.
Filed Date: 4/7/17.
Accession Number: 20170407–5261.
Comments Due: 5 p.m. ET 4/28/17.
Docket Numbers: ER17–1395–000.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement No.
4320, Queue No. AA1–109 to be
effective 12/3/2015.
Filed Date: 4/10/17.
Accession Number: 20170410–5109.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1396–000.
Applicants: MATL LLP.
Description: § 205(d) Rate Filing:
MATL Table of Contents Revisions to be
effective 4/11/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5120.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1397–000.
Applicants: MATL LLP.
Description: Tariff Cancellation:
MATL ColumbiaGrid Agreement
Cancellation to be effective 4/11/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5122.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1398–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
807—LGIA with Buffalo Trail Wind
Farm LLC to be effective 6/10/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5195.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1399–000.
Applicants: Interstate Power and
Light Company, ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Amended Operating and Transmission
Agreement Exhibits and Appendices to
be effective 6/9/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5197.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1400–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of a Joint Use Pole and Facility
Construction Agreement to be effective
6/9/2017.
Filed Date: 4/10/17.
Accession Number: 20170410–5198.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17–1401–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSC–PRPA–414–0.0.0 to be effective 4/
16/2016.
Filed Date: 4/10/17.
Accession Number: 20170410–5203.
Comments Due: 5 p.m. ET 5/1/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–16–000.
Applicants: MDU Resources Group,
Inc.
E:\FR\FM\17APN1.SGM
17APN1
Federal Register / Vol. 82, No. 72 / Monday, April 17, 2017 / Notices
Description: Application pursuant to
Section 204 of the Federal Power Act of
MDU Resources Group, Inc.
Filed Date: 4/7/17.
Accession Number: 20170407–5306.
Comments Due: 5 p.m. ET 4/28/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–07691 Filed 4–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–116–000]
mstockstill on DSK30JT082PROD with NOTICES
Northern Natural Gas Company; Notice
of Request Under Blanket
Authorization
Take notice that on March 30, 2017,
Northern Natural Gas Company.
(‘‘Northern’’), 1111 South 103rd Street,
Omaha, Nebraska 68124–1000, filed a
prior notice application pursuant to
sections 157.205, 157.210 and 157.216
of the Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Northern’s blanket certificate issued in
Docket No. CP82–401–000. Northern
requests authorization to: (1) Construct
and operate two mainline pipeline
extension segments totaling
approximately 2.25 miles of its existing
30-inch and 36-inch-diameter pipelines
and (2) abandon short segments of
pipeline, all located in Dakota County,
Minnesota, and Worth County, Iowa, all
as more fully set forth in the request,
which is on file with the Commission
and open to public inspection. The
proposed project is referred to as the
VerDate Sep<11>2014
17:14 Apr 14, 2017
Jkt 241001
Ventura North A-line Capacity
Replacement Project (Project). The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically Northern proposes to: (1)
Construct 1.24-mile extension of
Northern’s existing 30-inch-diameter Dline located in Sections 16, 21 and 22,
Township 112 North, Range 20 West,
Greenvale Township, Dakota County,
Minnesota; (2) construct 1.01-mile
extension of Northern’s 36-inchdiameter E-line located in Sections 9
and 16, Township 100 North, Range 22
West, Silver Lake Township, Worth
County, Iowa; (3) remove approximately
10 feet of 16-inch-diameter pipe; (4)
remove approximately 80 feet of 30inch-diameter pipe from the D-line in
Dakota County, Minnesota; (5) remove
approximately 10 feet of 12-inchdiameter pipe and (6) remove
approximately 20 feet of 24-inchdiameter pipe from the E-line in Worth
County, Iowa.
Any questions regarding this
application should be directed to Dari R.
Dornan Senior Counsel, Northern
Natural Gas Company, P.O. Box 3330,
Omaha, Nebraska 68103–0330 or phone
(402) 398–7077, or by email at
dari.dornan@nngco.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
18137
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Dated: April 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–07694 Filed 4–14–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1392–000]
El Cabo Wind LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of El Cabo
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 82, Number 72 (Monday, April 17, 2017)]
[Notices]
[Pages 18136-18137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-07691]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG17-96-000.
Applicants: Santa Rita Wind Energy LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Santa Rita Wind Energy LLC.
Filed Date: 4/7/17.
Accession Number: 20170407-5260.
Comments Due: 5 p.m. ET 4/28/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-1530-000.
Applicants: BIF III Holtwood LLC.
Description: Report Filing: Refund Report BIF III Holtwood to be
effective N/A.
Filed Date: 4/10/17.
Accession Number: 20170410-5196.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1025-002.
Applicants: Cedar Point Wind, LLC.
Description: Tariff Amendment: Recollation Amendment Title Page and
Header Revisions to be effective 2/24/2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5054.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1026-002.
Applicants: Silver State Solar Power North, LLC.
Description: Tariff Amendment: SSN Recollation Amendment Title Page
and Header to be effective 2/24/2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5099.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1394-000.
Applicants: 83WI 8me, LLC.
Description: Baseline eTariff Filing: 83WI 8me Initial MBR
Application and Request for Expedited Consideration to be effective 5/
19/2017.
Filed Date: 4/7/17.
Accession Number: 20170407-5261.
Comments Due: 5 p.m. ET 4/28/17.
Docket Numbers: ER17-1395-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to Service
Agreement No. 4320, Queue No. AA1-109 to be effective 12/3/2015.
Filed Date: 4/10/17.
Accession Number: 20170410-5109.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1396-000.
Applicants: MATL LLP.
Description: Sec. 205(d) Rate Filing: MATL Table of Contents
Revisions to be effective 4/11/2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5120.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1397-000.
Applicants: MATL LLP.
Description: Tariff Cancellation: MATL ColumbiaGrid Agreement
Cancellation to be effective 4/11/2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5122.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1398-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: SA 807--LGIA with Buffalo
Trail Wind Farm LLC to be effective 6/10/2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5195.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1399-000.
Applicants: Interstate Power and Light Company, ITC Midwest LLC.
Description: Sec. 205(d) Rate Filing: Amended Operating and
Transmission Agreement Exhibits and Appendices to be effective 6/9/
2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5197.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1400-000.
Applicants: ITC Midwest LLC.
Description: Sec. 205(d) Rate Filing: Filing of a Joint Use Pole
and Facility Construction Agreement to be effective 6/9/2017.
Filed Date: 4/10/17.
Accession Number: 20170410-5198.
Comments Due: 5 p.m. ET 5/1/17.
Docket Numbers: ER17-1401-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSC-PRPA-414-0.0.0 to be
effective 4/16/2016.
Filed Date: 4/10/17.
Accession Number: 20170410-5203.
Comments Due: 5 p.m. ET 5/1/17.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES17-16-000.
Applicants: MDU Resources Group, Inc.
[[Page 18137]]
Description: Application pursuant to Section 204 of the Federal
Power Act of MDU Resources Group, Inc.
Filed Date: 4/7/17.
Accession Number: 20170407-5306.
Comments Due: 5 p.m. ET 4/28/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-07691 Filed 4-14-17; 8:45 am]
BILLING CODE 6717-01-P