Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 17238 [2017-07088]
Download as PDF
17238
Federal Register / Vol. 82, No. 67 / Monday, April 10, 2017 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL17–51–000]
Arizona Public Service Company;
Notice of Institution of Section 206
Proceeding and Refund Effective Date
On March 28, 2017, a letter order was
issued in Docket No. EL17–51–000 by
the Director, Division of Electric
Power—West, Office of Energy Market
Regulation, pursuant to section 206 of
the Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether the proposed revisions of
Arizona Public Service Company to its
Open Access Transmission Tariff may
be unjust, unreasonable, unduly
discriminatory or preferential. Arizona
Public Service Company, 158 FERC
62,241 (2017).
The refund effective date in Docket
No. EL17–51–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL17–51–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: April 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–07083 Filed 4–7–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14820–000]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Allegheny Pumped Storage Hydro
Project to be located near Juniata
Township in Blair County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
VerDate Sep<11>2014
20:02 Apr 07, 2017
Jkt 241001
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 100 acres and a
storage capacity of 1,500 acre-feet at a
surface elevation of approximately 2,500
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-fill dam; (2)
a new lower reservoir with a surface
area of 50 acres and a storage capacity
of 1,800 acre-feet at a surface elevation
of 1,500 feet msl; (3) a new 3,760-footlong, 48-inch-diameter penstock
connecting the upper and lower
reservoirs; (4) a new 150-foot-long, 50foot-wide, 25-foot-high powerhouse
containing two turbine-generator units
with a total rated capacity of 123
megawatts; (5) a new 3,924-foot-long
transmission line connecting the
powerhouse to the Summit Claysburg
115-kilovolt circuit owned by the
Pennsylvania Electric Company; and (6)
appurtenant facilities. The proposed
project would have an annual
generation of 448,854 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 267–254–6107.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
The first page of any filing should
include docket number P–14820–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14820) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: April 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–07088 Filed 4–7–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–101–000.
Applicants: Beebe 1B Renewable
Energy, LLC, Beebe Renewable Energy,
LLC, Bluestem Wind Energy, LLC,
Cassia Gulch Wind Park LLC, Cow
Branch Wind Power, LLC, CR Clearing,
LLC, Criterion Power Partners, LLC,
Fourmile Wind Energy, LLC, Harvest
Windfarm, LLC, Harvest Windfarm II,
LLC, High Mesa Energy, LLC, Michigan
Wind 1, LLC, Michigan Wind 2, LLC,
Shooting Star Wind Project, LLC, Tuana
Springs Energy, LLC, Wind Capital
Holdings, LLC, John Hancock Life
Insurance Company (U.S.A.).
Description: Application of the Exelon
Applicants, et al. for Authorization
under Section 203 of the Federal Power
Act, Request for Expedited Action and
Request for Confidential Treatment.
Filed Date: 4/3/17.
Accession Number: 20170403–5583.
Comments Due: 5 p.m. ET 4/24/17.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–90–000.
Applicants: AEM Wind, LLC.
Description: Self-Certification of EWG
Status of AEM Wind, LLC.
Filed Date: 4/4/17.
Accession Number: 20170404–5218.
Comments Due: 5 p.m. ET 4/25/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1069–001.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
E:\FR\FM\10APN1.SGM
10APN1
Agencies
[Federal Register Volume 82, Number 67 (Monday, April 10, 2017)]
[Notices]
[Page 17238]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-07088]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14820-000]
Merchant Hydro Developers, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro Developers, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Allegheny Pumped Storage Hydro Project to be located near Juniata
Township in Blair County, Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) A new
upper reservoir with a surface area of 100 acres and a storage capacity
of 1,500 acre-feet at a surface elevation of approximately 2,500 feet
above mean sea level (msl) created through construction of a new
roller-compacted concrete or rock-fill dam; (2) a new lower reservoir
with a surface area of 50 acres and a storage capacity of 1,800 acre-
feet at a surface elevation of 1,500 feet msl; (3) a new 3,760-foot-
long, 48-inch-diameter penstock connecting the upper and lower
reservoirs; (4) a new 150-foot-long, 50-foot-wide, 25-foot-high
powerhouse containing two turbine-generator units with a total rated
capacity of 123 megawatts; (5) a new 3,924-foot-long transmission line
connecting the powerhouse to the Summit Claysburg 115-kilovolt circuit
owned by the Pennsylvania Electric Company; and (6) appurtenant
facilities. The proposed project would have an annual generation of
448,854 megawatt-hours.
Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC,
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267-254-6107.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14820-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14820) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: April 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-07088 Filed 4-7-17; 8:45 am]
BILLING CODE 6717-01-P