South Carolina Electric & Gas Company; South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; Automatic Depressurization System Stage 2, 3 & 4, Valve Flow Area Changes and Clarifications, 17045-17046 [2017-06992]
Download as PDF
Federal Register / Vol. 82, No. 66 / Friday, April 7, 2017 / Notices
1. The title of the information
collection: NRC Form 5, ‘‘Occupational
Dose Record for a Monitoring Period.’’
2. OMB approval number: 3150–0006.
3. Type of submission: Extension.
4. The form number, if applicable:
NRC Form 5.
5. How often the collection is required
or requested: Annually.
6. Who will be required or asked to
respond: NRC licensees who are
required to comply with part 20 of title
10 of the Code of Federal Regulations
(10 CFR).
7. The estimated number of annual
responses: 4,339 (198 reporting
responses plus 4,141 record keepers).
8. The estimated number of annual
respondents: 4,141 respondents (99
reactors plus 4,042 materials licensees).
9. The estimated number of hours
needed annually to comply with the
information collection requirement or
request: 125,383 hours (5,940 hours
reporting plus 119,443 hours
recordkeeping).
10. Abstract: NRC Form 5 is used to
record and report the results of
individual monitoring for occupational
radiation exposure during a monitoring
period (one calendar year) to ensure
regulatory compliance with annual
radiation dose limits specified in 10
CFR 20.1201.
III. Specific Requests for Comments
nlaroche on DSK30NT082PROD with NOTICES
The NRC is seeking comments that
address the following questions:
1. Is the proposed collection of
information necessary for the NRC to
properly perform its functions? Does the
information have practical utility?
2. Is the estimate of the burden of the
information collection accurate?
3. Is there a way to enhance the
quality, utility, and clarity of the
information to be collected?
4. How can the burden of the
information collection on respondents
be minimized, including the use of
automated collection techniques or
other forms of information technology?
Dated at Rockville, Maryland, this 3rd day
of April 2017.
For the Nuclear Regulatory Commission.
David Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2017–06941 Filed 4–6–17; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
14:52 Apr 06, 2017
Jkt 241001
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–027 and 52–028; NRC–
2008–0441]
South Carolina Electric & Gas
Company; South Carolina Public
Service Authority; Virgil C. Summer
Nuclear Station, Units 2 and 3;
Automatic Depressurization System
Stage 2, 3 & 4, Valve Flow Area
Changes and Clarifications
Nuclear Regulatory
Commission.
ACTION: Exemption and combined
license amendment; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is granting an
exemption to allow a departure from the
certification information of Tier 1 of the
generic design control document (DCD)
and is issuing License Amendment No.
64 to Combined Licenses (COLs), NPF–
93 and NPF–94. The COLs were issued
to South Carolina Electric & Gas
Company and the South Carolina Public
Service Authority, (both collectively
referred to as the licensee) for
construction and operation of the Virgil
C. Summer Nuclear Station (VCSNS)
Units 2 and 3, located in Fairfield
County, South Carolina.
The granting of the exemption allows
the changes to Tier 1 information asked
for in the amendment. Because the
acceptability of the exemption was
determined in part by the acceptability
of the amendment, the exemption and
amendment are being issued
concurrently.
SUMMARY:
The exemption and amendment
were issued on March 17, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2008–0441 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0441. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
DATES:
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
17045
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document. The
request for the amendment and
exemption was submitted by letter
dated September 2, 2016, and it is
available in ADAMS under Accession
No. ML16246A214.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Ruth C. Reyes, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3249; email:
Ruth.Reyes@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is granting an exemption
from paragraph B of section III, ‘‘Scope
and Contents,’’ of appendix D, ‘‘Design
Certification Rule for the AP1000,’’ to
part 52 of title 10 of the Code of Federal
Regulations (10 CFR), and issuing
License Amendment No. 64 to COLs,
NPF–93 and NPF–94, to the licensee.
The exemption is required by paragraph
A.4 of Section VIII, ‘‘Processes for
Changes and Departures,’’ of appendix
D, to 10 CFR part 52 to allow the
licensee to depart from Tier 1
information. With the requested
amendment, the licensee sought
proposed changes that would allow
changes in appendix C of the COLs to
clarify the flow area for the automatic
depressurization system (ADS) fourth
stage squib valves and to reduce the
minimum effective flow area for the
second and third stage ADS control
valves.
Part of the justification for granting
the exemption was provided by the
review of the amendment. Because the
exemption is necessary in order to issue
the requested license amendment, the
NRC granted the exemption and issued
the amendment concurrently, rather
than in sequence. This included issuing
a combined safety evaluation containing
the NRC staff’s review of both the
exemption request and the license
amendment. The exemption met all
applicable regulatory criteria set forth in
10 CFR 50.12, and 52.7, and Section
VIII.A.4 of appendix D to 10 CFR part
E:\FR\FM\07APN1.SGM
07APN1
17046
Federal Register / Vol. 82, No. 66 / Friday, April 7, 2017 / Notices
nlaroche on DSK30NT082PROD with NOTICES
52. The license amendment was found
to be acceptable as well. The combined
safety evaluation is available in ADAMS
under Accession No. ML17039B058.
Identical exemption documents
(except for referenced unit numbers and
license numbers) were issued to the
licensee for VCSNS Units 2 and 3 (COLs
NPF–93 and NPF–94). The exemption
documents for VCSNS Units 2 and 3 can
be found in ADAMS under Accession
Nos. ML17039B030 and ML17039B041,
respectively. The exemption is
reproduced (with the exception of
abbreviated titles and additional
citations) in Section II of this document.
The amendment documents for COLs
NPF–93 and NPF–94 are available in
ADAMS under Accession Nos.
ML17039B015 and ML17039B024,
respectively. A summary of the
amendment documents is provided in
Section III of this document.
II. Exemption
Reproduced below is the exemption
document issued to VCSNS Units 2 and
Unit 3. It makes reference to the
combined safety evaluation that
provides the reasoning for the findings
made by the NRC (and listed under Item
1) in order to grant the exemption:
1. In a letter dated September 2, 2016,
the licensee requested from the
Commission an exemption to allow
departures from Tier 1 information in
the certified DCD incorporated by
reference in 10 CFR part 52, appendix
D, as part of LAR 16–08, ‘‘ADS Stage 2,
3, and 4 Valve Flow Area Changes and
Clarifications.’’
For the reasons set forth in Section 3.1
of the NRC staff’s Safety Evaluation,
which can be found in ADAMS under
Accession No. ML17039B058, the
Commission finds that:
A. The exemption is authorized by
law;
B. the exemption presents no undue
risk to public health and safety;
C. the exemption is consistent with
the common defense and security;
D. special circumstances are present
in that the application of the rule in this
circumstance is not necessary to serve
the underlying purpose of the rule;
E. the special circumstances outweigh
any decrease in safety that may result
from the reduction in standardization
caused by the exemption; and
F. the exemption will not result in a
significant decrease in the level of safety
otherwise provided by the design.
2. Accordingly, the licensee is granted
an exemption from the certified DCD
Tier 1 information, with corresponding
changes to Appendix C of the Facility
Combined Licenses as described in the
licensee’s request dated September 2,
VerDate Sep<11>2014
14:52 Apr 06, 2017
Jkt 241001
2016. This exemption is related to, and
necessary for, the granting of License
Amendment No. 64, which is being
issued concurrently with this
exemption.
3. As explained in Section 5.0 of the
NRC staff’s Safety Evaluation (ADAMS
Accession No. ML17039B058), this
exemption meets the eligibility criteria
for categorical exclusion set forth in 10
CFR 51.22(c)(9). Therefore, pursuant to
10 CFR 51.22(b), no environmental
impact statement or environmental
assessment needs to be prepared in
connection with the issuance of the
exemption.
4. This exemption is effective as of the
date of its issuance.
III. License Amendment Request
By letter dated September 2, 2016
(ADAMS Accession No. ML16246A214),
the licensee requested that the NRC
amend the COLs for VCSNS, Units 2
and 3, COLs NPF–93 and NPF–94. The
proposed amendment is described in
Section I of this Federal Register notice.
The Commission has determined for
these amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or COL, as applicable, proposed
no significant hazards consideration
determination, and opportunity for a
hearing in connection with these
actions, was published in the Federal
Register on December 20, 2016 (81 FR
92863). No comments were received
during the 30-day comment period.
The Commission has determined that
these amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the
combined safety evaluation, the staff
granted the exemption and issued the
amendment that the licensee requested
on September 2, 2016. The exemption
and amendment were issued on March
17, 2017, as part of a combined package
to the licensee (ADAMS Accession No.
ML17039A995).
Dated at Rockville, Maryland, this 24th day
of March 2017.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2017–06992 Filed 4–6–17; 8:45 am]
BILLING CODE 7590–01–P
POSTAL SERVICE
International Product Change—Global
Expedited Package Services—NonPublished Rates
Postal ServiceTM.
Notice.
AGENCY:
ACTION:
The Postal Service gives
notice of filing a request with the Postal
Regulatory Commission to add Global
Expedited Package Services—NonPublished Rates 12 (GEPS–NPR 12) to
the Competitive Products List.
DATES: Effective date: April 7, 2017.
FOR FURTHER INFORMATION CONTACT:
Christopher C. Meyerson, 202–268–
7820.
SUMMARY:
The
United States Postal Service® hereby
gives notice that, pursuant to 39 U.S.C.
3642, on March 31, 2017, it filed with
the Postal Regulatory Commission a
Request of the United States Postal
Service to add Global Expedited
Package Services—Non-Published Rates
12 (GEPS–NPR 12) to the Competitive
Products List, and Notice of Filing
GEPS–NPR 12 Model Contract and
Application for Non-Public Treatment
of Materials Filed Under Seal.
Documents are available at
www.prc.gov, Docket Nos. MC2017–105
and CP2017–152.
SUPPLEMENTARY INFORMATION:
Stanley F. Mires,
Attorney, Federal Compliance.
[FR Doc. 2017–06915 Filed 4–6–17; 8:45 am]
BILLING CODE 7710–12–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–80363; File No. SR–
NYSEArca–2017–13]
Self-Regulatory Organizations; NYSE
Arca, Inc.; Notice of Filing and
Immediate Effectiveness of Proposed
Rule Change To Amend the
Exchange’s Schedule of Fees and
Charges
April 3, 2017.
Pursuant to Section 19(b)(1) 1 of the
Securities Exchange Act of 1934
1 15
E:\FR\FM\07APN1.SGM
U.S.C. 78s(b)(1).
07APN1
Agencies
[Federal Register Volume 82, Number 66 (Friday, April 7, 2017)]
[Notices]
[Pages 17045-17046]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06992]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-027 and 52-028; NRC-2008-0441]
South Carolina Electric & Gas Company; South Carolina Public
Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3;
Automatic Depressurization System Stage 2, 3 & 4, Valve Flow Area
Changes and Clarifications
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemption and combined license amendment; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an
exemption to allow a departure from the certification information of
Tier 1 of the generic design control document (DCD) and is issuing
License Amendment No. 64 to Combined Licenses (COLs), NPF-93 and NPF-
94. The COLs were issued to South Carolina Electric & Gas Company and
the South Carolina Public Service Authority, (both collectively
referred to as the licensee) for construction and operation of the
Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in
Fairfield County, South Carolina.
The granting of the exemption allows the changes to Tier 1
information asked for in the amendment. Because the acceptability of
the exemption was determined in part by the acceptability of the
amendment, the exemption and amendment are being issued concurrently.
DATES: The exemption and amendment were issued on March 17, 2017.
ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0441. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document. The request for the amendment and exemption was submitted by
letter dated September 2, 2016, and it is available in ADAMS under
Accession No. ML16246A214.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Ruth C. Reyes, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3249; email: Ruth.Reyes@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is granting an exemption from paragraph B of section III,
``Scope and Contents,'' of appendix D, ``Design Certification Rule for
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations
(10 CFR), and issuing License Amendment No. 64 to COLs, NPF-93 and NPF-
94, to the licensee. The exemption is required by paragraph A.4 of
Section VIII, ``Processes for Changes and Departures,'' of appendix D,
to 10 CFR part 52 to allow the licensee to depart from Tier 1
information. With the requested amendment, the licensee sought proposed
changes that would allow changes in appendix C of the COLs to clarify
the flow area for the automatic depressurization system (ADS) fourth
stage squib valves and to reduce the minimum effective flow area for
the second and third stage ADS control valves.
Part of the justification for granting the exemption was provided
by the review of the amendment. Because the exemption is necessary in
order to issue the requested license amendment, the NRC granted the
exemption and issued the amendment concurrently, rather than in
sequence. This included issuing a combined safety evaluation containing
the NRC staff's review of both the exemption request and the license
amendment. The exemption met all applicable regulatory criteria set
forth in 10 CFR 50.12, and 52.7, and Section VIII.A.4 of appendix D to
10 CFR part
[[Page 17046]]
52. The license amendment was found to be acceptable as well. The
combined safety evaluation is available in ADAMS under Accession No.
ML17039B058.
Identical exemption documents (except for referenced unit numbers
and license numbers) were issued to the licensee for VCSNS Units 2 and
3 (COLs NPF-93 and NPF-94). The exemption documents for VCSNS Units 2
and 3 can be found in ADAMS under Accession Nos. ML17039B030 and
ML17039B041, respectively. The exemption is reproduced (with the
exception of abbreviated titles and additional citations) in Section II
of this document. The amendment documents for COLs NPF-93 and NPF-94
are available in ADAMS under Accession Nos. ML17039B015 and
ML17039B024, respectively. A summary of the amendment documents is
provided in Section III of this document.
II. Exemption
Reproduced below is the exemption document issued to VCSNS Units 2
and Unit 3. It makes reference to the combined safety evaluation that
provides the reasoning for the findings made by the NRC (and listed
under Item 1) in order to grant the exemption:
1. In a letter dated September 2, 2016, the licensee requested from
the Commission an exemption to allow departures from Tier 1 information
in the certified DCD incorporated by reference in 10 CFR part 52,
appendix D, as part of LAR 16-08, ``ADS Stage 2, 3, and 4 Valve Flow
Area Changes and Clarifications.''
For the reasons set forth in Section 3.1 of the NRC staff's Safety
Evaluation, which can be found in ADAMS under Accession No.
ML17039B058, the Commission finds that:
A. The exemption is authorized by law;
B. the exemption presents no undue risk to public health and
safety;
C. the exemption is consistent with the common defense and
security;
D. special circumstances are present in that the application of the
rule in this circumstance is not necessary to serve the underlying
purpose of the rule;
E. the special circumstances outweigh any decrease in safety that
may result from the reduction in standardization caused by the
exemption; and
F. the exemption will not result in a significant decrease in the
level of safety otherwise provided by the design.
2. Accordingly, the licensee is granted an exemption from the
certified DCD Tier 1 information, with corresponding changes to
Appendix C of the Facility Combined Licenses as described in the
licensee's request dated September 2, 2016. This exemption is related
to, and necessary for, the granting of License Amendment No. 64, which
is being issued concurrently with this exemption.
3. As explained in Section 5.0 of the NRC staff's Safety Evaluation
(ADAMS Accession No. ML17039B058), this exemption meets the eligibility
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment needs to be prepared in
connection with the issuance of the exemption.
4. This exemption is effective as of the date of its issuance.
III. License Amendment Request
By letter dated September 2, 2016 (ADAMS Accession No.
ML16246A214), the licensee requested that the NRC amend the COLs for
VCSNS, Units 2 and 3, COLs NPF-93 and NPF-94. The proposed amendment is
described in Section I of this Federal Register notice.
The Commission has determined for these amendments that the
application complies with the standards and requirements of the Atomic
Energy Act of 1954, as amended (the Act), and the Commission's rules
and regulations. The Commission has made appropriate findings as
required by the Act and the Commission's rules and regulations in 10
CFR chapter I, which are set forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or COL, as applicable, proposed no significant
hazards consideration determination, and opportunity for a hearing in
connection with these actions, was published in the Federal Register on
December 20, 2016 (81 FR 92863). No comments were received during the
30-day comment period.
The Commission has determined that these amendments satisfy the
criteria for categorical exclusion in accordance with 10 CFR 51.22.
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the combined safety evaluation, the
staff granted the exemption and issued the amendment that the licensee
requested on September 2, 2016. The exemption and amendment were issued
on March 17, 2017, as part of a combined package to the licensee (ADAMS
Accession No. ML17039A995).
Dated at Rockville, Maryland, this 24th day of March 2017.
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of
New Reactors.
[FR Doc. 2017-06992 Filed 4-6-17; 8:45 am]
BILLING CODE 7590-01-P