Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 16824-16825 [2017-06845]
Download as PDF
16824
Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices
regional Reliability Standard TOP–007–
WECC–1a) as follows: 5
FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
DUE TO DOCKET NO. RD16–10
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
hours & cost per
response
Total annual burden
hours & total annual
cost
(1)
Information collection requirements
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
Reporting Requirement—Transmission Operators that operate qualified transfer
paths 6.
Recordkeeping Requirement—Transmission
Operators that operate qualified transfer
paths.
TOTAL REDUCTION (Due to Docket
No. RD16–10).
3
27
40 hrs.; $2,908 ..........
1,080 hrs.; $78,516.
9
1
........................
12 hrs.; $347 .............
108 hrs.; $3,124.
........................
........................
........................
...................................
1,188 hrs.; $81,640.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Shoreline
Management Plan.
b. Project No: 349–193.
c. Date Filed: December 19, 2016.
d. Applicant: Alabama Power
Company.
e. Name of Project: Martin Dam
Hydroelectric Project.
f. Location: The project is located on
the Tallapoosa River in Coosa and
Elmore counties, Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: David
Anderson, (205) 257–1398, dkanders@
southernco.com.
i. FERC Contact: Krista Sakallaris,
(202) 502–6302, krista.sakallaris@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: May
1, 2017.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–349–193.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee filed for Commission approval
a revised Shoreline Management Plan
pursuant to Article 412 of the license
order issued December 17, 2015. The
revised plan incorporates the provisions
required by Article 412 into the
previously approved plan, as well as
project boundary modifications and the
reclassification of some project lands.
The plan also includes three proposed
changes to the project boundary, these
changes were previously reviewed and
acted on at the time of relicensing;
however, Alabama Power has received
and provided additional information
prompting the request for potential
revision to the previously approved
plan.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
5 The reductions in burden and cost shown in the
table are the same figures as those in the current
OMB-approved inventory for the reporting and
recordkeeping requirements, now being retired.
6 This is based on burden estimates taken from
the Order in Docket No. RR07–11–000, P. 130.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06847 Filed 4–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 349–193]
Alabama Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
mstockstill on DSK3G9T082PROD with NOTICES
9
VerDate Sep<11>2014
18:51 Apr 05, 2017
Jkt 241001
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices
mstockstill on DSK3G9T082PROD with NOTICES
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06845 Filed 4–5–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:51 Apr 05, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2507–011.
Applicants: Westar Energy, Inc.
Description: Notice of Non-Material
Change in Status of Westar Energy, Inc.
Filed Date: 3/29/17.
Accession Number: 20170329–5285.
Comments Due: 5 p.m. ET 4/19/17.
Docket Numbers: ER17–1335–000.
Applicants: Western Massachusetts
Electric Company.
Description: § 205(d) Rate Filing: Two
Party Interconnection Agreement with
Nautilus Hydro for Dwight Hydro to be
effective 3/29/2017.
Filed Date: 3/29/17.
Accession Number: 20170329–5236.
Comments Due: 5 p.m. ET 4/19/17.
Docket Numbers: ER17–1336–000.
Applicants: Western Massachusetts
Electric Company.
Description: § 205(d) Rate Filing: Two
Party Interconnection Agreement with
Nautilus Hydro for Gardners Falls to be
effective 3/29/2017.
Filed Date: 3/29/17.
Accession Number: 20170329–5245.
Comments Due: 5 p.m. ET 4/19/17.
Docket Numbers: ER17–1337–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2017–03–27 Extension of PIRP
Protective Measures Amendment to be
effective 5/1/2017.
Filed Date: 3/29/17.
Accession Number: 20170329–5249.
Comments Due: 5 p.m. ET 4/19/17.
Docket Numbers: ER17–1338–000.
Applicants: Western Massachusetts
Electric Company.
Description: § 205(d) Rate Filing: Two
Party Interconnection Agreement with
Nautilus Hydro for Indian Orchard to be
effective 3/29/2017.
Filed Date: 3/29/17.
Accession Number: 20170329–5255.
Comments Due: 5 p.m. ET 4/19/17.
Docket Numbers: ER17–1339–000.
Applicants: Western Massachusetts
Electric Company.
Description: § 205(d) Rate Filing: Two
Party Interconnection Agreement with
Nautilus Hydro for Putts Bridge to be
effective 3/29/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5000.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1340–000.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
16825
Applicants: Western Massachusetts
Electric Company.
Description: § 205(d) Rate Filing: Two
Party Interconnection Agreement with
Nautilus Hydro for Red Bridge to be
effective 3/29/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5001.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1341–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3313
WAPA & Grand Electric Coop
Interconnection Agreement to be
effective 3/1/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5005.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1342–000.
Applicants: Duke Energy Florida, LLC
Description: § 205(d) Rate Filing: Joint
OATT Real Power Loss (DEF) 2017 to be
effective 5/1/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5036.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1343–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–03–30_SA 1136 NSP–GM GIA
(G171 G242 G239 J554) to be effective 3/
16/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5091.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1344–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
OATT Attach T—Form of Svc Agrmt for
BAAS to be effective 5/30/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5095.
Comments Due: 5 p.m. ET 4/20/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16824-16825]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06845]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 349-193]
Alabama Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Shoreline Management Plan.
b. Project No: 349-193.
c. Date Filed: December 19, 2016.
d. Applicant: Alabama Power Company.
e. Name of Project: Martin Dam Hydroelectric Project.
f. Location: The project is located on the Tallapoosa River in
Coosa and Elmore counties, Alabama.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: David Anderson, (205) 257-1398,
dkanders@southernco.com.
i. FERC Contact: Krista Sakallaris, (202) 502-6302,
krista.sakallaris@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: May 1, 2017.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. The first page of any
filing should include docket number P-349-193. Comments emailed to
Commission staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee filed for Commission
approval a revised Shoreline Management Plan pursuant to Article 412 of
the license order issued December 17, 2015. The revised plan
incorporates the provisions required by Article 412 into the previously
approved plan, as well as project boundary modifications and the
reclassification of some project lands. The plan also includes three
proposed changes to the project boundary, these changes were previously
reviewed and acted on at the time of relicensing; however, Alabama
Power has received and provided additional information prompting the
request for potential revision to the previously approved plan.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in
[[Page 16825]]
the docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06845 Filed 4-5-17; 8:45 am]
BILLING CODE 6717-01-P