Notice of Attendance at PJM Interconnection, L.L.C. Meetings, 16819-16820 [2017-06844]
Download as PDF
Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices
Description: § 205(d) Rate Filing:
Cancellation of cost-based rates tariffs to
be effective 3/31/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5277.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1349–000.
Applicants: Central Hudson Gas &
Electric Corporation.
Description: § 205(d) Rate Filing:
Revisions to FERC Rate Schedule 202 to
be effective 3/16/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5278.
Comments Due: 5 p.m. ET 4/20/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 30, 2017.
Kimberly D. Bose,
Secretary.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06835 Filed 4–5–17; 8:45 am]
BILLING CODE 6717–01–P
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–10–000; Docket No.
CP16–13–000]
Mountain Valley Pipeline LLC;
Equitrans LP; Notice of Revised
Schedule for Environmental Review of
the Mountain Valley Project and the
Equitrans Expansion Project
mstockstill on DSK3G9T082PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the final EIS and to keep
track of all formal issuances and
submittals in specific dockets, the
Commission offers a free service called
eSubscription (https://www.ferc.gov/
docs-filing/esubscription.asp).
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental impact statement
(EIS) for Mountain Valley Pipeline
LLC’s (Mountain Valley) Mountain
Valley Project and Equitrans LP’s
(Equitrans) Equitrans Expansion Project.
The first notice of schedule, issued on
June 28, 2016, identified a final EIS date
of March 10, 2017. However, in
18:51 Apr 05, 2017
Schedule for Environmental Review
Issuance of Notice of Availability of the
final EIS—June 23, 2017
90-day Federal Authorization Decision
Deadline—September 21, 2017
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
DEPARTMENT OF ENERGY
[FR Doc. 2017–06840 Filed 4–5–17; 8:45 am]
VerDate Sep<11>2014
response to comments on the draft EIS
issued September 16, 2016 (with a
comment closing date of December 22,
2016), staff produced several
environmental information requests sent
to Mountain Valley and Equitrans in
January and March, 2017, and only
recently received information necessary
for us to complete our environmental
review. As a result, staff has revised the
schedule for issuance of the final EIS.
Jkt 241001
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
(PJM) Members Committee and Markets
and Reliability Committee meetings, as
well as other PJM committee,
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
• April 27, 2017 (Wilmington, DE)
• May 15–17, 2017 (Chicago, IL)
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM Web site.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
•
•
•
•
•
16819
June 22, 2017 (Wilmington, DE)
July 27, 2017 (Wilmington, DE)
September 28, 2017 (Audubon, PA)
October 26, 2017 (Wilmington, DE)
November 30, 2017 (Wilmington,
DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
April 27, 2017 (Wilmington, DE)
May 25, 2017 (Wilmington, DE)
June 22, 2017 (Wilmington, DE)
July 27, 2017 (Wilmington, DE)
August 24, 2017 (Wilmington, DE)
September 28, 2017 (Audubon, PA)
October 26, 2017 (Wilmington, DE)
November 30, 2017 (Wilmington,
DE)
• December 21, 2017 (Wilmington,
DE)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
•
April 12, 2017 (Audubon, PA)
May 3, 2017 (Audubon, PA)
June 7, 2017 (Audubon, PA)
July 12, 2017 (Audubon, PA)
August 9, 2017 (Audubon, PA)
September 13, 2017 (Audubon, PA)
October 11, 2017 (Audubon, PA)
November 8, 2017 (Audubon, PA)
December 13, 2017 (Audubon, PA)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER12–2708, PotomacAppalachian Transmission
Highline, LLC. et. al.
Docket No. EL13–88, Northern
Indiana Public Service Company v.
Midcontinent Independent System
Operator, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL14–37, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket Nos. ER14–1461, EL14–48,
PJM Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc.
v. PJM Interconnection, L.L.C.
Docket Nos. EL15–29, ER15–623, PJM
Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et al., v. PJM
Interconnection, L.L.C.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket Nos. EL15–73, ER16–372, PJM
Interconnection, L.L.C.
Docket No. EL15–79, TranSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Maryland and
Delaware State Commissions v. PJM
E:\FR\FM\06APN1.SGM
06APN1
mstockstill on DSK3G9T082PROD with NOTICES
16820
Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C.
Docket Nos. ER15–2562, ER15–2563,
PJM Interconnection, L.L.C.
Docket Nos. EL16–6, ER16–121, PJM
Interconnection, L.L.C.
Docket No. EL16–49, Calpine
Corporation, et. al., v. PJM
Interconnection, L.L.C.
Docket Nos. EL16–71, ER17–179,
Monongahela Power Company, et.
al., PPL Electric Utilities
Corporation
Docket Nos. EL16–96, ER16–736,
ER16–2401, PJM Interconnection,
L.L.C.
Docket No. ER16–453, PJM
Interconnection, L.L.C., and
Northeast Transmission
Development, LLC
Docket No. EL17–22, Independent
Market Monitor for PJM
Interconnection, L.L.C. v. American
Electric Power Corporation
Docket No. EL17–31, Northern Illinois
Municipal Power Agency v. PJM
Interconnection, L.L.C.
Docket No. EL17–32, Old Dominion
Electric Cooperative v. PJM
Interconnection, L.L.C.
Docket No. EL17–36, Advanced
Energy Management Alliance v.
PJM Interconnection, L.L.C.
Docket No. EL17–37, American
Municipal Power, Inc. v. PJM
Interconnection, L.L.C.
Docket No. ER17–211, Mid-Atlantic
Interstate Transmission, LLC
Docket Nos. ER17–214, ER17–216,
PJM Interconnection, L.L.C.
Docket No. ER17–217, PJM
Interconnection, L.L.C.
Docket No. ER17–335, PJM
Interconnection, L.L.C.
Docket No. ER17–367, PJM
Interconnection, L.L.C.
Docket Nos. ER17–718, ER17–729,
PJM Interconnection, L.L.C.,
Midcontinent Independent System
Operator, Inc.
Docket No. ER17–725, PJM
Interconnection, L.L.C.
Docket Nos. ER17–753, PJM
Interconnection, L.L.C.
Docket No. ER17–775, PJM
Interconnection, L.L.C.
Docket No. ER17–905, New York
Independent System Operator, Inc.
v. PJM Interconnection, L.L.C.
Docket No. ER17–934, PJM
Interconnection, L.L.C.
Docket No. ER17–950, PJM
Interconnection, L.L.C.
Docket No. ER17–1016, PJM
Interconnection, L.L.C.
Docket No. ER17–1057, PJM
Interconnection, L.L.C.
Docket No. ER17–1083, RC Cape May
VerDate Sep<11>2014
18:51 Apr 05, 2017
Jkt 241001
Holdings, LLC
Docket No. ER17–1138, PJM
Interconnection, L.L.C.
Docket No. ER17–1236, PJM
Interconnection, L.L.C.
Docket No. ER17–1306, PJM
Interconnection, L.L.C.
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06844 Filed 4–5–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14815–000]
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 10, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Richmondale Pumped Storage
Hydroelectric Project to be located near
the town of Simpson in Lackawanna
and Wayne Counties, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 260 acres and a
storage capacity of 3,900 acre-feet at a
surface elevation of approximately 2,000
feet above mean sea level (msl) created
through construction of new rollercompacted concrete or rock-filled dams
and/or dikes; (2) excavating a new lower
reservoir with a surface area of 75 acres
and a total storage capacity of 5,625
acre-feet at a surface elevation of 1,450
feet msl; (3) a new 6,710-foot-long, 48inch-diameter penstock connecting the
PO 00000
Frm 00042
Fmt 4703
Sfmt 9990
upper and lower reservoirs; (5) a new
150-foot-long, 50-foot-wide powerhouse
containing two turbine-generator units
with a total rated capacity of 230
megawatts; (6) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (7)
appurtenant facilities. Possible initial
fill water and make-up water would
come from the Lackawanna River. The
proposed project would have an annual
generation of 676,873 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: (267) 254–6107.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14815–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14815) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06837 Filed 4–5–17; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16819-16820]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06844]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Interconnection, L.L.C. Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and
Markets and Reliability Committee meetings, as well as other PJM
committee, subcommittee or task force meetings.\1\ The Commission and
Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM subcommittees and task forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, the Commission and Commission staff
may monitor the various meetings posted on the PJM Web site.
PJM Members Committee
April 27, 2017 (Wilmington, DE)
May 15-17, 2017 (Chicago, IL)
June 22, 2017 (Wilmington, DE)
July 27, 2017 (Wilmington, DE)
September 28, 2017 (Audubon, PA)
October 26, 2017 (Wilmington, DE)
November 30, 2017 (Wilmington, DE)
PJM Markets and Reliability Committee
April 27, 2017 (Wilmington, DE)
May 25, 2017 (Wilmington, DE)
June 22, 2017 (Wilmington, DE)
July 27, 2017 (Wilmington, DE)
August 24, 2017 (Wilmington, DE)
September 28, 2017 (Audubon, PA)
October 26, 2017 (Wilmington, DE)
November 30, 2017 (Wilmington, DE)
December 21, 2017 (Wilmington, DE)
PJM Market Implementation Committee
April 12, 2017 (Audubon, PA)
May 3, 2017 (Audubon, PA)
June 7, 2017 (Audubon, PA)
July 12, 2017 (Audubon, PA)
August 9, 2017 (Audubon, PA)
September 13, 2017 (Audubon, PA)
October 11, 2017 (Audubon, PA)
November 8, 2017 (Audubon, PA)
December 13, 2017 (Audubon, PA)
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission,
including the following currently pending proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER12-2708, Potomac-Appalachian Transmission Highline,
LLC. et. al.
Docket No. EL13-88, Northern Indiana Public Service Company v.
Midcontinent Independent System Operator, Inc. and PJM Interconnection,
L.L.C.
Docket No. EL14-37, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket Nos. ER14-1461, EL14-48, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc.
v. PJM Interconnection, L.L.C.
Docket Nos. EL15-29, ER15-623, PJM Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, LLC, et al., v.
PJM Interconnection, L.L.C.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket Nos. EL15-73, ER16-372, PJM Interconnection, L.L.C.
Docket No. EL15-79, TranSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Maryland and Delaware State Commissions v. PJM
[[Page 16820]]
Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C.
Docket Nos. ER15-2562, ER15-2563, PJM Interconnection, L.L.C.
Docket Nos. EL16-6, ER16-121, PJM Interconnection, L.L.C.
Docket No. EL16-49, Calpine Corporation, et. al., v. PJM
Interconnection, L.L.C.
Docket Nos. EL16-71, ER17-179, Monongahela Power Company, et. al.,
PPL Electric Utilities Corporation
Docket Nos. EL16-96, ER16-736, ER16-2401, PJM Interconnection,
L.L.C.
Docket No. ER16-453, PJM Interconnection, L.L.C., and Northeast
Transmission Development, LLC
Docket No. EL17-22, Independent Market Monitor for PJM
Interconnection, L.L.C. v. American Electric Power Corporation
Docket No. EL17-31, Northern Illinois Municipal Power Agency v. PJM
Interconnection, L.L.C.
Docket No. EL17-32, Old Dominion Electric Cooperative v. PJM
Interconnection, L.L.C.
Docket No. EL17-36, Advanced Energy Management Alliance v. PJM
Interconnection, L.L.C.
Docket No. EL17-37, American Municipal Power, Inc. v. PJM
Interconnection, L.L.C.
Docket No. ER17-211, Mid-Atlantic Interstate Transmission, LLC
Docket Nos. ER17-214, ER17-216, PJM Interconnection, L.L.C.
Docket No. ER17-217, PJM Interconnection, L.L.C.
Docket No. ER17-335, PJM Interconnection, L.L.C.
Docket No. ER17-367, PJM Interconnection, L.L.C.
Docket Nos. ER17-718, ER17-729, PJM Interconnection, L.L.C.,
Midcontinent Independent System Operator, Inc.
Docket No. ER17-725, PJM Interconnection, L.L.C.
Docket Nos. ER17-753, PJM Interconnection, L.L.C.
Docket No. ER17-775, PJM Interconnection, L.L.C.
Docket No. ER17-905, New York Independent System Operator, Inc. v.
PJM Interconnection, L.L.C.
Docket No. ER17-934, PJM Interconnection, L.L.C.
Docket No. ER17-950, PJM Interconnection, L.L.C.
Docket No. ER17-1016, PJM Interconnection, L.L.C.
Docket No. ER17-1057, PJM Interconnection, L.L.C.
Docket No. ER17-1083, RC Cape May Holdings, LLC
Docket No. ER17-1138, PJM Interconnection, L.L.C.
Docket No. ER17-1236, PJM Interconnection, L.L.C.
Docket No. ER17-1306, PJM Interconnection, L.L.C.
For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
Valerie.Martin@ferc.gov.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06844 Filed 4-5-17; 8:45 am]
BILLING CODE 6717-01-P