Combined Notice of Filings #2, 16818-16819 [2017-06840]

Download as PDF 16818 Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices mstockstill on DSK3G9T082PROD with NOTICES industry research and development (R&D) needs, discuss capabilities of the national laboratories, and provide guidance to industry on how to engage with the national laboratories to accelerate innovation and achieve bottom-line results. DATES: DOE will host the Summit from 7:30 a.m. to 7:00 p.m. on May 4, 2017. ADDRESSES: The Summit will be held at The National Press Club, 529 14th St NW., Washington, DC 20045. FOR FURTHER INFORMATION CONTACT: Alexsandra Lemke, Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy, 1000 Independence Ave. SW., Washington, DC 20585. Telephone: (720)-648–4381. Email: Alexsandra.Lemke@EE.DOE.Gov. SUPPLEMENTARY INFORMATION: Background The Executive Summit provides a premier opportunity to learn how DOEfunded research at the national laboratories and beyond is addressing the hydropower industry’s R&D needs— and how companies can directly partner with the labs to accelerate innovation and achieve bottom-line results. The Summit will bring together hydropower industry executives, government leaders, and technology researchers to showcase how private-sector and national lab partnerships are successfully addressing critical technology challenges to improve the competitiveness of American hydropower businesses across the country. Invited participants from industry will include design, consulting, assessment, and operations professionals with experience in addressing the short- and long-term challenges of hydropower development and operations. The information provided and discussed throughout this summit will be compiled in a summary report, which will provide clarity on how the capabilities of DOE’s National Laboratories and other DOE Hydropower Program resources align with the perceived and prioritized R&D needs of the industry as outlined in the recently-published DOE Hydropower Vision. The Vision includes a roadmap outlining potential actions, in a nonprescriptive manner, for consideration by all hydropower stakeholder sectors. The workshop sessions will address four primary categories of R&D activities included in the roadmap: (1) Enhanced Revenue and Market Structures, (2) Optimization of Hydropower Security, Reliability, and Value Sustainable Development and Operation, (3) Addressing Hydropower Sustainability VerDate Sep<11>2014 18:51 Apr 05, 2017 Jkt 241001 Optimization of Hydropower, and (4) Technology Advancement for Hydropower. The remaining categories of the Roadmap, Regulatory Process Optimization and Enhanced Collaboration, Education, and Outreach, will be addressed in the workshop as cross-cut issues to connect activities in the first three categories. Public Participation The event is open to the public based upon space availability. DOE will also accept public comments as described above for purposes of better understanding the hydropower industry and challenges associated with increased deployment. These comments may be submitted at Alexsandra.Lemke@EE.DOE.Gov. Participants should limit information and comments to those based on personal experience, individual advice, information, or facts regarding this topic. It is not the object of this session to obtain any group position or consensus from the meeting participants. Following the meeting, a summary will be compiled by DOE and posted for public comment. For those interested in providing additional public comment, the summary will be posted at water.energy.gov. Issued on March 30, 2017 in Washington, DC. Alejandro Moreno, Director, Water Power Technologies Office, Office of Energy Efficiency and Renewable Energy. [FR Doc. 2017–06859 Filed 4–5–17; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY National Nuclear Security Administration Defense Programs Advisory Committee Office of Defense Programs, National Nuclear Security Administration, Department of Energy. ACTION: Notice of renewal. AGENCY: Pursuant to the Federal Advisory Committee Act, and following consultation with the Committee Management Secretariat, General Services Administration, notice is hereby given that the Defense Programs Advisory Committee (DPAC) will be renewed for a two-year period beginning on February 10, 2017. The DPAC will provide advice and recommendations to the Deputy Administrator for Defense Programs on SUMMARY: PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 the stewardship and maintenance of the Nation’s nuclear deterrent. Additionally, the renewal of the Committee has been determined to be essential to the conduct of the Department’s business and to be in the public interest in connection with the performance of duties imposed upon the Department of Energy by law and agreement. The Committee will continue to operate in accordance with the provisions of the Federal Advisory Committee Act and the rules and regulations in implementation of that Act. FOR FURTHER INFORMATION CONTACT: Robert Hanrahan, Office of Defense Programs, at (202) 586–4606. Issued in Washington, DC, on February 10, 2017. LaTanya R. Butler, Acting Committee Management Officer. [FR Doc. 2017–06892 Filed 4–5–17; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–1345–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: 2017 TACBAA Update to be effective 6/1/ 2017. Filed Date: 3/30/17. Accession Number: 20170330–5140. Comments Due: 5 p.m. ET 4/20/17. Docket Numbers: ER17–1346–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, Pennsylvania Electric Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits Service Agreement No. 4665 btwn Penelec, MAIT and Borough of Berlin to be effective 2/24/2017. Filed Date: 3/30/17. Accession Number: 20170330–5236. Comments Due: 5 p.m. ET 4/20/17. Docket Numbers: ER17–1347–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: OATT Revised Attachment H–1 (Rev Depreciation Rates 2017) to be effective 6/1/2017. Filed Date: 3/30/17. Accession Number: 20170330–5262. Comments Due: 5 p.m. ET 4/20/17. Docket Numbers: ER17–1348–000. Applicants: J.P. Morgan Ventures Energy Corporation. E:\FR\FM\06APN1.SGM 06APN1 Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices Description: § 205(d) Rate Filing: Cancellation of cost-based rates tariffs to be effective 3/31/2017. Filed Date: 3/30/17. Accession Number: 20170330–5277. Comments Due: 5 p.m. ET 4/20/17. Docket Numbers: ER17–1349–000. Applicants: Central Hudson Gas & Electric Corporation. Description: § 205(d) Rate Filing: Revisions to FERC Rate Schedule 202 to be effective 3/16/2017. Filed Date: 3/30/17. Accession Number: 20170330–5278. Comments Due: 5 p.m. ET 4/20/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 30, 2017. Kimberly D. Bose, Secretary. Dated: March 31, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–06835 Filed 4–5–17; 8:45 am] BILLING CODE 6717–01–P Notice of Attendance at PJM Interconnection, L.L.C. Meetings DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–10–000; Docket No. CP16–13–000] Mountain Valley Pipeline LLC; Equitrans LP; Notice of Revised Schedule for Environmental Review of the Mountain Valley Project and the Equitrans Expansion Project mstockstill on DSK3G9T082PROD with NOTICES Additional Information In order to receive notification of the issuance of the final EIS and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription (https://www.ferc.gov/ docs-filing/esubscription.asp). Federal Energy Regulatory Commission BILLING CODE 6717–01–P This notice identifies the Federal Energy Regulatory Commission staff’s revised schedule for the completion of the environmental impact statement (EIS) for Mountain Valley Pipeline LLC’s (Mountain Valley) Mountain Valley Project and Equitrans LP’s (Equitrans) Equitrans Expansion Project. The first notice of schedule, issued on June 28, 2016, identified a final EIS date of March 10, 2017. However, in 18:51 Apr 05, 2017 Schedule for Environmental Review Issuance of Notice of Availability of the final EIS—June 23, 2017 90-day Federal Authorization Decision Deadline—September 21, 2017 If a schedule change becomes necessary, an additional notice will be provided so that the relevant agencies are kept informed of the project’s progress. DEPARTMENT OF ENERGY [FR Doc. 2017–06840 Filed 4–5–17; 8:45 am] VerDate Sep<11>2014 response to comments on the draft EIS issued September 16, 2016 (with a comment closing date of December 22, 2016), staff produced several environmental information requests sent to Mountain Valley and Equitrans in January and March, 2017, and only recently received information necessary for us to complete our environmental review. As a result, staff has revised the schedule for issuance of the final EIS. Jkt 241001 The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and Markets and Reliability Committee meetings, as well as other PJM committee, subcommittee or task force meetings.1 The Commission and Commission staff may attend the following meetings: PJM Members Committee • April 27, 2017 (Wilmington, DE) • May 15–17, 2017 (Chicago, IL) 1 For example, PJM subcommittees and task forces of the standing committees (Operating, Planning and Market Implementation) and senior standing committees (Members and Markets and Reliability) meet on a variety of different topics; they convene and dissolve on an as-needed basis. Therefore, the Commission and Commission staff may monitor the various meetings posted on the PJM Web site. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 • • • • • 16819 June 22, 2017 (Wilmington, DE) July 27, 2017 (Wilmington, DE) September 28, 2017 (Audubon, PA) October 26, 2017 (Wilmington, DE) November 30, 2017 (Wilmington, DE) PJM Markets and Reliability Committee • • • • • • • • April 27, 2017 (Wilmington, DE) May 25, 2017 (Wilmington, DE) June 22, 2017 (Wilmington, DE) July 27, 2017 (Wilmington, DE) August 24, 2017 (Wilmington, DE) September 28, 2017 (Audubon, PA) October 26, 2017 (Wilmington, DE) November 30, 2017 (Wilmington, DE) • December 21, 2017 (Wilmington, DE) PJM Market Implementation Committee • • • • • • • • • April 12, 2017 (Audubon, PA) May 3, 2017 (Audubon, PA) June 7, 2017 (Audubon, PA) July 12, 2017 (Audubon, PA) August 9, 2017 (Audubon, PA) September 13, 2017 (Audubon, PA) October 11, 2017 (Audubon, PA) November 8, 2017 (Audubon, PA) December 13, 2017 (Audubon, PA) The discussions at each of the meetings described above may address matters at issue in pending proceedings before the Commission, including the following currently pending proceedings: Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. ER12–2708, PotomacAppalachian Transmission Highline, LLC. et. al. Docket No. EL13–88, Northern Indiana Public Service Company v. Midcontinent Independent System Operator, Inc. and PJM Interconnection, L.L.C. Docket No. EL14–37, PJM Interconnection, L.L.C. Docket No. ER14–972, PJM Interconnection, L.L.C. Docket Nos. ER14–1461, EL14–48, PJM Interconnection, L.L.C. Docket No. EL15–18, Consolidated Edison Company of New York, Inc. v. PJM Interconnection, L.L.C. Docket Nos. EL15–29, ER15–623, PJM Interconnection, L.L.C. Docket No. EL15–41, Essential Power Rock Springs, LLC, et al., v. PJM Interconnection, L.L.C. Docket No. EL15–67, Linden VFT, LLC v. PJM Interconnection, L.L.C. Docket Nos. EL15–73, ER16–372, PJM Interconnection, L.L.C. Docket No. EL15–79, TranSource, LLC v. PJM Interconnection, L.L.C. Docket No. EL15–95, Maryland and Delaware State Commissions v. PJM E:\FR\FM\06APN1.SGM 06APN1

Agencies

[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16818-16819]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06840]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-1345-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: 2017 TACBAA Update to be 
effective 6/1/2017.
    Filed Date: 3/30/17.
    Accession Number: 20170330-5140.
    Comments Due: 5 p.m. ET 4/20/17.

    Docket Numbers: ER17-1346-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, Pennsylvania 
Electric Company, PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits Service 
Agreement No. 4665 btwn Penelec, MAIT and Borough of Berlin to be 
effective 2/24/2017.
    Filed Date: 3/30/17.
    Accession Number: 20170330-5236.
    Comments Due: 5 p.m. ET 4/20/17.

    Docket Numbers: ER17-1347-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: OATT Revised Attachment H-1 
(Rev Depreciation Rates 2017) to be effective 6/1/2017.
    Filed Date: 3/30/17.
    Accession Number: 20170330-5262.
    Comments Due: 5 p.m. ET 4/20/17.

    Docket Numbers: ER17-1348-000.
    Applicants: J.P. Morgan Ventures Energy Corporation.

[[Page 16819]]

    Description: Sec.  205(d) Rate Filing: Cancellation of cost-based 
rates tariffs to be effective 3/31/2017.
    Filed Date: 3/30/17.
    Accession Number: 20170330-5277.
    Comments Due: 5 p.m. ET 4/20/17.

    Docket Numbers: ER17-1349-000.
    Applicants: Central Hudson Gas & Electric Corporation.
    Description: Sec.  205(d) Rate Filing: Revisions to FERC Rate 
Schedule 202 to be effective 3/16/2017.
    Filed Date: 3/30/17.
    Accession Number: 20170330-5278.
    Comments Due: 5 p.m. ET 4/20/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06840 Filed 4-5-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.