Combined Notice of Filings #2, 16818-16819 [2017-06840]
Download as PDF
16818
Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices
mstockstill on DSK3G9T082PROD with NOTICES
industry research and development
(R&D) needs, discuss capabilities of the
national laboratories, and provide
guidance to industry on how to engage
with the national laboratories to
accelerate innovation and achieve
bottom-line results.
DATES: DOE will host the Summit from
7:30 a.m. to 7:00 p.m. on May 4, 2017.
ADDRESSES: The Summit will be held at
The National Press Club, 529 14th St
NW., Washington, DC 20045.
FOR FURTHER INFORMATION CONTACT:
Alexsandra Lemke, Office of Energy
Efficiency and Renewable Energy, U.S.
Department of Energy, 1000
Independence Ave. SW., Washington,
DC 20585. Telephone: (720)-648–4381.
Email: Alexsandra.Lemke@EE.DOE.Gov.
SUPPLEMENTARY INFORMATION:
Background
The Executive Summit provides a
premier opportunity to learn how DOEfunded research at the national
laboratories and beyond is addressing
the hydropower industry’s R&D needs—
and how companies can directly partner
with the labs to accelerate innovation
and achieve bottom-line results. The
Summit will bring together hydropower
industry executives, government
leaders, and technology researchers to
showcase how private-sector and
national lab partnerships are
successfully addressing critical
technology challenges to improve the
competitiveness of American
hydropower businesses across the
country. Invited participants from
industry will include design,
consulting, assessment, and operations
professionals with experience in
addressing the short- and long-term
challenges of hydropower development
and operations.
The information provided and
discussed throughout this summit will
be compiled in a summary report,
which will provide clarity on how the
capabilities of DOE’s National
Laboratories and other DOE
Hydropower Program resources align
with the perceived and prioritized R&D
needs of the industry as outlined in the
recently-published DOE Hydropower
Vision. The Vision includes a roadmap
outlining potential actions, in a nonprescriptive manner, for consideration
by all hydropower stakeholder sectors.
The workshop sessions will address
four primary categories of R&D activities
included in the roadmap: (1) Enhanced
Revenue and Market Structures, (2)
Optimization of Hydropower Security,
Reliability, and Value Sustainable
Development and Operation, (3)
Addressing Hydropower Sustainability
VerDate Sep<11>2014
18:51 Apr 05, 2017
Jkt 241001
Optimization of Hydropower, and (4)
Technology Advancement for
Hydropower. The remaining categories
of the Roadmap, Regulatory Process
Optimization and Enhanced
Collaboration, Education, and Outreach,
will be addressed in the workshop as
cross-cut issues to connect activities in
the first three categories.
Public Participation
The event is open to the public based
upon space availability. DOE will also
accept public comments as described
above for purposes of better
understanding the hydropower industry
and challenges associated with
increased deployment. These comments
may be submitted at
Alexsandra.Lemke@EE.DOE.Gov.
Participants should limit information
and comments to those based on
personal experience, individual advice,
information, or facts regarding this
topic. It is not the object of this session
to obtain any group position or
consensus from the meeting
participants.
Following the meeting, a summary
will be compiled by DOE and posted for
public comment. For those interested in
providing additional public comment,
the summary will be posted at
water.energy.gov.
Issued on March 30, 2017 in Washington,
DC.
Alejandro Moreno,
Director, Water Power Technologies Office,
Office of Energy Efficiency and Renewable
Energy.
[FR Doc. 2017–06859 Filed 4–5–17; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
National Nuclear Security
Administration
Defense Programs Advisory
Committee
Office of Defense Programs,
National Nuclear Security
Administration, Department of Energy.
ACTION: Notice of renewal.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, and following
consultation with the Committee
Management Secretariat, General
Services Administration, notice is
hereby given that the Defense Programs
Advisory Committee (DPAC) will be
renewed for a two-year period beginning
on February 10, 2017.
The DPAC will provide advice and
recommendations to the Deputy
Administrator for Defense Programs on
SUMMARY:
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
the stewardship and maintenance of the
Nation’s nuclear deterrent.
Additionally, the renewal of the
Committee has been determined to be
essential to the conduct of the
Department’s business and to be in the
public interest in connection with the
performance of duties imposed upon the
Department of Energy by law and
agreement. The Committee will
continue to operate in accordance with
the provisions of the Federal Advisory
Committee Act and the rules and
regulations in implementation of that
Act.
FOR FURTHER INFORMATION CONTACT:
Robert Hanrahan, Office of Defense
Programs, at (202) 586–4606.
Issued in Washington, DC, on February 10,
2017.
LaTanya R. Butler,
Acting Committee Management Officer.
[FR Doc. 2017–06892 Filed 4–5–17; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1345–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: 2017
TACBAA Update to be effective 6/1/
2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5140.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1346–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, Pennsylvania
Electric Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits Service Agreement No.
4665 btwn Penelec, MAIT and Borough
of Berlin to be effective 2/24/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5236.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1347–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Revised Attachment H–1 (Rev
Depreciation Rates 2017) to be effective
6/1/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5262.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1348–000.
Applicants: J.P. Morgan Ventures
Energy Corporation.
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices
Description: § 205(d) Rate Filing:
Cancellation of cost-based rates tariffs to
be effective 3/31/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5277.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17–1349–000.
Applicants: Central Hudson Gas &
Electric Corporation.
Description: § 205(d) Rate Filing:
Revisions to FERC Rate Schedule 202 to
be effective 3/16/2017.
Filed Date: 3/30/17.
Accession Number: 20170330–5278.
Comments Due: 5 p.m. ET 4/20/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 30, 2017.
Kimberly D. Bose,
Secretary.
Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06835 Filed 4–5–17; 8:45 am]
BILLING CODE 6717–01–P
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–10–000; Docket No.
CP16–13–000]
Mountain Valley Pipeline LLC;
Equitrans LP; Notice of Revised
Schedule for Environmental Review of
the Mountain Valley Project and the
Equitrans Expansion Project
mstockstill on DSK3G9T082PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the final EIS and to keep
track of all formal issuances and
submittals in specific dockets, the
Commission offers a free service called
eSubscription (https://www.ferc.gov/
docs-filing/esubscription.asp).
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental impact statement
(EIS) for Mountain Valley Pipeline
LLC’s (Mountain Valley) Mountain
Valley Project and Equitrans LP’s
(Equitrans) Equitrans Expansion Project.
The first notice of schedule, issued on
June 28, 2016, identified a final EIS date
of March 10, 2017. However, in
18:51 Apr 05, 2017
Schedule for Environmental Review
Issuance of Notice of Availability of the
final EIS—June 23, 2017
90-day Federal Authorization Decision
Deadline—September 21, 2017
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
DEPARTMENT OF ENERGY
[FR Doc. 2017–06840 Filed 4–5–17; 8:45 am]
VerDate Sep<11>2014
response to comments on the draft EIS
issued September 16, 2016 (with a
comment closing date of December 22,
2016), staff produced several
environmental information requests sent
to Mountain Valley and Equitrans in
January and March, 2017, and only
recently received information necessary
for us to complete our environmental
review. As a result, staff has revised the
schedule for issuance of the final EIS.
Jkt 241001
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
(PJM) Members Committee and Markets
and Reliability Committee meetings, as
well as other PJM committee,
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
• April 27, 2017 (Wilmington, DE)
• May 15–17, 2017 (Chicago, IL)
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM Web site.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
•
•
•
•
•
16819
June 22, 2017 (Wilmington, DE)
July 27, 2017 (Wilmington, DE)
September 28, 2017 (Audubon, PA)
October 26, 2017 (Wilmington, DE)
November 30, 2017 (Wilmington,
DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
April 27, 2017 (Wilmington, DE)
May 25, 2017 (Wilmington, DE)
June 22, 2017 (Wilmington, DE)
July 27, 2017 (Wilmington, DE)
August 24, 2017 (Wilmington, DE)
September 28, 2017 (Audubon, PA)
October 26, 2017 (Wilmington, DE)
November 30, 2017 (Wilmington,
DE)
• December 21, 2017 (Wilmington,
DE)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
•
April 12, 2017 (Audubon, PA)
May 3, 2017 (Audubon, PA)
June 7, 2017 (Audubon, PA)
July 12, 2017 (Audubon, PA)
August 9, 2017 (Audubon, PA)
September 13, 2017 (Audubon, PA)
October 11, 2017 (Audubon, PA)
November 8, 2017 (Audubon, PA)
December 13, 2017 (Audubon, PA)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER12–2708, PotomacAppalachian Transmission
Highline, LLC. et. al.
Docket No. EL13–88, Northern
Indiana Public Service Company v.
Midcontinent Independent System
Operator, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL14–37, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket Nos. ER14–1461, EL14–48,
PJM Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc.
v. PJM Interconnection, L.L.C.
Docket Nos. EL15–29, ER15–623, PJM
Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et al., v. PJM
Interconnection, L.L.C.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket Nos. EL15–73, ER16–372, PJM
Interconnection, L.L.C.
Docket No. EL15–79, TranSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Maryland and
Delaware State Commissions v. PJM
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16818-16819]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06840]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-1345-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: 2017 TACBAA Update to be
effective 6/1/2017.
Filed Date: 3/30/17.
Accession Number: 20170330-5140.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17-1346-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, Pennsylvania
Electric Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: MAIT submits Service
Agreement No. 4665 btwn Penelec, MAIT and Borough of Berlin to be
effective 2/24/2017.
Filed Date: 3/30/17.
Accession Number: 20170330-5236.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17-1347-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: OATT Revised Attachment H-1
(Rev Depreciation Rates 2017) to be effective 6/1/2017.
Filed Date: 3/30/17.
Accession Number: 20170330-5262.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17-1348-000.
Applicants: J.P. Morgan Ventures Energy Corporation.
[[Page 16819]]
Description: Sec. 205(d) Rate Filing: Cancellation of cost-based
rates tariffs to be effective 3/31/2017.
Filed Date: 3/30/17.
Accession Number: 20170330-5277.
Comments Due: 5 p.m. ET 4/20/17.
Docket Numbers: ER17-1349-000.
Applicants: Central Hudson Gas & Electric Corporation.
Description: Sec. 205(d) Rate Filing: Revisions to FERC Rate
Schedule 202 to be effective 3/16/2017.
Filed Date: 3/30/17.
Accession Number: 20170330-5278.
Comments Due: 5 p.m. ET 4/20/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 30, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06840 Filed 4-5-17; 8:45 am]
BILLING CODE 6717-01-P