Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 16182-16183 [2017-06469]
Download as PDF
16182
Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Cancellation SGIA and
Distribution Service Agmt Joshua Tree
Solar Farm to be effective 3/11/2017.
Filed Date: 3/24/17
Accession Number: 20170324–5302.
Comments Due: 5 p.m. ET 4/14/17.
Docket Numbers: ER17–1300–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2017–03–24 EIM Implementation
Agreement with BANC to be effective 6/
1/2017.
Filed Date: 3/24/17.
Accession Number: 20170324–5304.
Comments Due: 5 p.m. ET 4/14/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06424 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14835–000]
mstockstill on DSK3G9T082PROD with NOTICES
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Susan Russ Memorial Pumped
Storage Hydro Project to be located near
the town of Manhattan in Tioga County,
VerDate Sep<11>2014
18:32 Mar 31, 2017
Jkt 241001
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
having a surface area of 70 acres and a
storage capacity of 1,050 acre-feet at a
surface elevation of approximately 2,200
feet above mean sea level (msl) created
through construction of new rollercompacted concrete or rock-filled dams
and/or dikes; (2) excavating a new lower
reservoir with a surface area of 60 acres
and a total storage capacity of 1,260
acre-feet at a surface elevation of 1,300
feet msl; (3) a new 3,337-foot-long, 48inch-diameter penstock connecting the
upper and lower reservoirs; (4) a new
150-foot-long, 50-foot-wide powerhouse
containing two turbine-generator units
with a total rated capacity of 77
megawatts; (5) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (6)
appurtenant facilities. Possible initial
fill water and make-up water would
come from Pine Creek. The proposed
project would have an annual
generation of 282,778 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: (267) 254–6107.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14835–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14835) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06475 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14808–000]
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 19, 2016, Merchant
Hydro Developers, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Panther Pumped
Storage Hydroelectric Project to be
located near the town of Simpson in
Lackawanna and Wayne Counties,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 175 acres and a
storage capacity of 2,625 acre-feet at a
surface elevation of approximately 1,960
feet above mean sea level (msl) created
through construction of new rollercompacted concrete or rock-filled dams
and/or dikes; (2) excavating a new lower
reservoir with a surface area of 180 acres
and a total storage capacity of 4,500
acre-feet at a surface elevation of 1,325
feet msl; (3) a new 6,045-foot-long, 48inch-diameter penstock connecting the
upper and lower reservoirs; (5) a new
150-foot-long, 50-foot-wide powerhouse
E:\FR\FM\03APN1.SGM
03APN1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices
containing two turbine-generator units
with a total rated capacity of 172
megawatts; (6) a new transmission line
connecting the powerhouse to a nearby
electric grid interconnection point with
options to evaluate multiple grid
interconnection locations; and (7)
appurtenant facilities. Possible initial
fill water and make-up water would
come from the Lackawanna River. The
proposed project would have an annual
generation of 502,717 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: (267) 254–6107.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14808–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14808) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06469 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:32 Mar 31, 2017
Jkt 241001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–38–000]
Columbia Gas Transmission, LLC;
Notice of Availability of the
Environmental Assessment for the
Proposed WB Xpress Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
WB XPress Project, proposed by
Columbia Gas Transmission, LLC
(Columbia) in the above-referenced
docket. Columbia requests authorization
to perform the following: (i) Installation,
construction, and operation of about
29.3 miles of various diameter pipeline;
(ii) modifications to seven existing
compressor stations; (iii) construction
and operation of two new compressor
stations; (iv) uprates and restoration of
the maximum allowable operating
pressure (MAOP) on various segments
of the existing WB and VB natural gas
transmission pipeline systems; and (v)
installation of various appurtenant and
auxiliary facilities, all located in either
Braxton, Clay, Grant, Hardy, Kanawha,
Pendleton, Randolph, and Upshur
Counties, West Virginia, or Clark,
Fairfax, Fauquier, Loudoun,
Shenandoah, or Warren Counties,
Virginia.
The EA assesses the potential
environmental effects of the
construction and operation of the WB
XPress Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Forest Service (USFS), U.S.
Fish and Wildlife Service, U.S. Army
Corps of Engineers, West Virginia
Department of Environmental
Protection, and West Virginia Division
of Natural Resources participated as
cooperating agencies in the preparation
of the EA. Cooperating agencies have
jurisdiction by law or special expertise
with respect to resources potentially
affected by the proposal and participate
in the NEPA analysis. The USFS and
U.S. Army Corps of Engineers will
adopt the EA to fulfill their agency’s
NEPA obligations. The USFS will use
the EA, as well as other supporting
documentation, to consider the issuance
of right-of-way authorization for the
portion of the project on National Forest
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
16183
System lands. The U.S. Army Corps of
Engineers will use the EA and
supporting documentation to consider
the issuance of Clean Water Act Section
404 and Rivers and Harbors Act Section
10 permits.
The proposed WB XPress Project
includes the following facilities:
West Virginia
Aboveground Facilities:
• One new West Virginia Compressor
Station: A new, natural gas-fired
compressor station at approximately MP
0.3 of the Line WB–5 Extension in
Kanawha County, West Virginia.
• Installation of new valve sites and
launcher/receiver facilities along Line
WB–5 in Kanawha, Grant and Clay
Counties, West Virginia.
• Modifications to increase
horsepower at four (4) existing
Compressor Stations including
Cleveland, Files Creek, Seneca, and Lost
River Compressor Stations in Upshur,
Randolph, Pendleton, and Hardy
Counties, West Virginia, respectively.
• Modifications to existing natural
gas pipeline appurtenances at the
Frametown Compressor Station in
Braxton County, West Virginia.
• Modifications to four existing Valve
Sites including Glady Valve Site in
Randolph County, West Virginia; Dink
Valve Site in Clay County, West
Virginia; Whitmer and Smokehole in
Pendleton County, West Virginia; and
one regulator station, Panther Mountain
Regulator Station, in Kanawha County,
West Virginia.
Pipeline Facilities:
• Line WB–5 Extension: Installation
of approximately 0.3 mile of new 36inch-diameter natural gas transmission
pipeline from the planned new
Compressor Station to the Panther
Mountain Regulator Station in Kanawha
County, West Virginia.
• Line WB–22: Installation of
approximately 0.6 mile of new 36-inchdiameter natural gas transmission
pipeline from the proposed new West
Virginia Compressor Stations to the
Panther Regulator Station, ending at the
proposed WB–22 Receiver Site in
Kanawha County, West Virginia.
• Line WB: Generally lift and lay
replacement of approximately 25.5
miles of 26-inch-diameter natural gas
transmission pipeline loop and
associated appurtenances in Randolph
and Pendleton Counties, West Virginia.
• Line WB: Replacement of 5
sections, totaling approximately 0.3
mile of 26-inch-diameter natural gas
transmission pipeline between
Mileposts (MP) 134.6 and 146.4 in
Pendleton, Grant, and Hardy Counties,
West Virginia.
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Pages 16182-16183]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06469]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14808-000]
Merchant Hydro Developers, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 19, 2016, Merchant Hydro Developers, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Panther Pumped Storage Hydroelectric Project to be located near the
town of Simpson in Lackawanna and Wayne Counties, Pennsylvania. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A new
upper reservoir with a surface area of 175 acres and a storage capacity
of 2,625 acre-feet at a surface elevation of approximately 1,960 feet
above mean sea level (msl) created through construction of new roller-
compacted concrete or rock-filled dams and/or dikes; (2) excavating a
new lower reservoir with a surface area of 180 acres and a total
storage capacity of 4,500 acre-feet at a surface elevation of 1,325
feet msl; (3) a new 6,045-foot-long, 48-inch-diameter penstock
connecting the upper and lower reservoirs; (5) a new 150-foot-long, 50-
foot-wide powerhouse
[[Page 16183]]
containing two turbine-generator units with a total rated capacity of
172 megawatts; (6) a new transmission line connecting the powerhouse to
a nearby electric grid interconnection point with options to evaluate
multiple grid interconnection locations; and (7) appurtenant
facilities. Possible initial fill water and make-up water would come
from the Lackawanna River. The proposed project would have an annual
generation of 502,717 megawatt-hours.
Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC,
5710 Oak Crest Drive, Doylestown, PA 18902; phone: (267) 254-6107.
FERC Contact: Tim Looney; phone: (202) 502-6096.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14808-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14808) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06469 Filed 3-31-17; 8:45 am]
BILLING CODE 6717-01-P