Download as PDF 16190 Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone mstockstill on DSK3G9T082PROD with NOTICES Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. Commission issues Draft EA or EIS. Comments on Draft EA or EIS Modified Terms and Conditions Commission Issues Final EA or EIS. Target date May 2017. November 2017. December 2017. February 2017. May 2018. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying VerDate Sep<11>2014 18:32 Mar 31, 2017 Jkt 241001 agency received the request; or (3) evidence of waiver of water quality certification. Dated: March 24, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–06422 Filed 3–31–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG17–84–000. Applicants: Midlothian Energy, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 3/28/17. Accession Number: 20170328–5201. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: EG17–85–000. Applicants: Hays Energy, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 3/28/17. Accession Number: 20170328–5205. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: EG17–86–000. Applicants: COLETO CREEK POWER, LP. Description: Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 3/28/17. Accession Number: 20170328–5207. Comments Due: 5 p.m. ET 4/18/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–714–001. Applicants: Virginia Electric and Power Company, PJM Interconnection, LLC. Description: Compliance filing: Compliance filing per 2/28/2017 order to correct Att. H–16A eff 1/1/17 & 2/1/ 17 to be effective 1/1/2017. Filed Date: 3/28/17. Accession Number: 20170328–5126. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: ER17–1318–000. Applicants: Redbed Plains Wind Farm LLC. Description: Baseline eTariff Filing: MBR Application to be effective 5/28/ 2017. Filed Date: 3/28/17. Accession Number: 20170328–5102. Comments Due: 5 p.m. ET 4/18/17. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 Docket Numbers: ER17–1319–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2646R4 Kansas Municipal Energy Agency NITSA and NOA to be effective 3/1/2017. Filed Date: 3/28/17. Accession Number: 20170328–5121. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: ER17–1320–000. Applicants: Odyssey Solar, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 12/13/9998. Filed Date: 3/28/17. Accession Number: 20170328–5183. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: ER17–1321–000. Applicants: Puget Sound Energy, Inc. Description: Initial rate filing: RES Engineering and Procurement Agreement, Original Service Agreement No. 831 to be effective 3/1/2017. Filed Date: 3/28/17. Accession Number: 20170328–5212 Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: ER17–1322–000. Applicants: Western Massachusetts Electric Company. Description: § 205(d) Rate Filing: Interconnection and Operating Agreement with Essential Power MA. Amendment No. 2 to be effective 3/29/ 2017. Filed Date: 3/28/17. Accession Number: 20170328–5214. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: ER17–1323–000. Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company, MidAmerican Energy Company. Description: § 205(d) Rate Filing: 2017–03–28_SA 3009 ATXI–MEC TIA to be effective 3/30/2017. Filed Date: 3/28/17. Accession Number: 20170328–5224. Comments Due: 5 p.m. ET 4/18/17. Docket Numbers: ER17–1324–000. Applicants: Playa Solar 2, LLC. Description: Baseline eTariff Filing: Application for Initial Market-Based Rate Tariff and Granting Certain Waivers to be effective 3/29/2017. Filed Date: 3/28/17. Accession Number: 20170328–5242 Comments Due: 5 p.m. ET 4/18/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern E:\FR\FM\03APN1.SGM 03APN1 Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 28, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–06467 Filed 3–31–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP17–76–000] mstockstill on DSK3G9T082PROD with NOTICES Northern Natural Gas Company; Notice of Request Under Blanket Authorization Take notice that on March 15, 2017, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in Docket No. CP17–76–000 a prior notice request pursuant to sections 157.205, 157.208, and 157.216 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA) and Northern’s blanket authorizations issued in Docket No. CP82–401–000. Northern seeks authorization to (1) install and operate a compressor station and (2) abandon segments of pipeline, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Northern proposes to install and operate a new 15,900-horsepower (HP) compressor station (Lake Mills Compressor Station) in Worth County, Iowa. Additionally, Northern proposes to abandon approximately 60 feet of pipe from both the D- and E-lines to facilitate tie-ins. Northern states that the facilities proposed herein constitute a discrete, stand-alone project under the large umbrella of the Northern Lights VerDate Sep<11>2014 18:32 Mar 31, 2017 Jkt 241001 expansion plan. The total cost is approximately $30,500,000. Any questions regarding this Application should be directed to Michael T Loeffler, Senior Director, Certificates and External Affairs for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, by phone (402) 398–7103, by fax (402) 398–7592, or by email at mike.loeffler@nngco.com. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 16191 documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: March 24, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–06419 Filed 3–31–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC17–9–000] Commission Information Collection Activities (FERC–510, FERC–520, FERC–561, and FERC–583); Consolidated Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collections and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden of the information collections described below. DATES: Comments on the collections of information are due June 2, 2017. ADDRESSES: You may submit comments (identified by Docket No. IC17–9–000) by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/efiling. asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Please reference the specific collection number and/or title in your comments. SUMMARY: E:\FR\FM\03APN1.SGM 03APN1

Agencies

[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Pages 16190-16191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06467]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG17-84-000.
    Applicants: Midlothian Energy, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5201.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: EG17-85-000.
    Applicants: Hays Energy, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5205.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: EG17-86-000.
    Applicants: COLETO CREEK POWER, LP.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5207.
    Comments Due: 5 p.m. ET 4/18/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER17-714-001.
    Applicants: Virginia Electric and Power Company, PJM 
Interconnection, LLC.
    Description: Compliance filing: Compliance filing per 2/28/2017 
order to correct Att. H-16A eff 1/1/17 & 2/1/17 to be effective 1/1/
2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5126.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1318-000.
    Applicants: Redbed Plains Wind Farm LLC.
    Description: Baseline eTariff Filing: MBR Application to be 
effective 5/28/2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5102.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1319-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2646R4 Kansas Municipal 
Energy Agency NITSA and NOA to be effective 3/1/2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5121.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1320-000.
    Applicants: Odyssey Solar, LLC.
    Description: Baseline eTariff Filing: Baseline new to be effective 
12/13/9998.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5183.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1321-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Initial rate filing: RES Engineering and Procurement 
Agreement, Original Service Agreement No. 831 to be effective 3/1/2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5212
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1322-000.
    Applicants: Western Massachusetts Electric Company.
    Description: Sec.  205(d) Rate Filing: Interconnection and 
Operating Agreement with Essential Power MA. Amendment No. 2 to be 
effective 3/29/2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5214.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1323-000.
    Applicants: Midcontinent Independent System Operator, Inc., Ameren 
Illinois Company, MidAmerican Energy Company.
    Description: Sec.  205(d) Rate Filing: 2017-03-28_SA 3009 ATXI-MEC 
TIA to be effective 3/30/2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5224.
    Comments Due: 5 p.m. ET 4/18/17.

    Docket Numbers: ER17-1324-000.
    Applicants: Playa Solar 2, LLC.
    Description: Baseline eTariff Filing: Application for Initial 
Market-Based Rate Tariff and Granting Certain Waivers to be effective 
3/29/2017.
    Filed Date: 3/28/17.
    Accession Number: 20170328-5242
    Comments Due: 5 p.m. ET 4/18/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern

[[Page 16191]]

time on the specified comment date. Protests may be considered, but 
intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.