16190
Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
mstockstill on DSK3G9T082PROD with NOTICES
Filing of recommendations, preliminary terms and conditions, and preliminary fishway
prescriptions.
Commission issues Draft EA or
EIS.
Comments on Draft EA or EIS
Modified Terms and Conditions
Commission Issues Final EA or
EIS.
Target date
May 2017.
November 2017.
December 2017.
February 2017.
May 2018.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
VerDate Sep<11>2014
18:32 Mar 31, 2017
Jkt 241001
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06422 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–84–000.
Applicants: Midlothian Energy, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 3/28/17.
Accession Number: 20170328–5201.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: EG17–85–000.
Applicants: Hays Energy, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 3/28/17.
Accession Number: 20170328–5205.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: EG17–86–000.
Applicants: COLETO CREEK POWER,
LP.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 3/28/17.
Accession Number: 20170328–5207.
Comments Due: 5 p.m. ET 4/18/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–714–001.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
LLC.
Description: Compliance filing:
Compliance filing per 2/28/2017 order
to correct Att. H–16A eff 1/1/17 & 2/1/
17 to be effective 1/1/2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5126.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17–1318–000.
Applicants: Redbed Plains Wind Farm
LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective 5/28/
2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5102.
Comments Due: 5 p.m. ET 4/18/17.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Docket Numbers: ER17–1319–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2646R4 Kansas Municipal Energy
Agency NITSA and NOA to be effective
3/1/2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5121.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17–1320–000.
Applicants: Odyssey Solar, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 12/13/9998.
Filed Date: 3/28/17.
Accession Number: 20170328–5183.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17–1321–000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing: RES
Engineering and Procurement
Agreement, Original Service Agreement
No. 831 to be effective 3/1/2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5212
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17–1322–000.
Applicants: Western Massachusetts
Electric Company.
Description: § 205(d) Rate Filing:
Interconnection and Operating
Agreement with Essential Power MA.
Amendment No. 2 to be effective 3/29/
2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5214.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17–1323–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company,
MidAmerican Energy Company.
Description: § 205(d) Rate Filing:
2017–03–28_SA 3009 ATXI–MEC TIA
to be effective 3/30/2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5224.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17–1324–000.
Applicants: Playa Solar 2, LLC.
Description: Baseline eTariff Filing:
Application for Initial Market-Based
Rate Tariff and Granting Certain
Waivers to be effective 3/29/2017.
Filed Date: 3/28/17.
Accession Number: 20170328–5242
Comments Due: 5 p.m. ET 4/18/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
E:\FR\FM\03APN1.SGM
03APN1
Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06467 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–76–000]
mstockstill on DSK3G9T082PROD with NOTICES
Northern Natural Gas Company; Notice
of Request Under Blanket
Authorization
Take notice that on March 15, 2017,
Northern Natural Gas Company
(Northern), 1111 South 103rd Street,
Omaha, Nebraska 68124, filed in Docket
No. CP17–76–000 a prior notice request
pursuant to sections 157.205, 157.208,
and 157.216 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
(NGA) and Northern’s blanket
authorizations issued in Docket No.
CP82–401–000. Northern seeks
authorization to (1) install and operate
a compressor station and (2) abandon
segments of pipeline, all as more fully
set forth in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Northern proposes to install and
operate a new 15,900-horsepower (HP)
compressor station (Lake Mills
Compressor Station) in Worth County,
Iowa. Additionally, Northern proposes
to abandon approximately 60 feet of
pipe from both the D- and E-lines to
facilitate tie-ins. Northern states that the
facilities proposed herein constitute a
discrete, stand-alone project under the
large umbrella of the Northern Lights
VerDate Sep<11>2014
18:32 Mar 31, 2017
Jkt 241001
expansion plan. The total cost is
approximately $30,500,000.
Any questions regarding this
Application should be directed to
Michael T Loeffler, Senior Director,
Certificates and External Affairs for
Northern, 1111 South 103rd Street,
Omaha, Nebraska 68124, by phone (402)
398–7103, by fax (402) 398–7592, or by
email at mike.loeffler@nngco.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
16191
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06419 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC17–9–000]
Commission Information Collection
Activities (FERC–510, FERC–520,
FERC–561, and FERC–583);
Consolidated Comment Request;
Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information
collections and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the requirements
and burden of the information
collections described below.
DATES: Comments on the collections of
information are due June 2, 2017.
ADDRESSES: You may submit comments
(identified by Docket No. IC17–9–000)
by either of the following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/efiling.
asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Please reference the specific
collection number and/or title in your
comments.
SUMMARY:
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Pages 16190-16191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06467]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG17-84-000.
Applicants: Midlothian Energy, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 3/28/17.
Accession Number: 20170328-5201.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: EG17-85-000.
Applicants: Hays Energy, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 3/28/17.
Accession Number: 20170328-5205.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: EG17-86-000.
Applicants: COLETO CREEK POWER, LP.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 3/28/17.
Accession Number: 20170328-5207.
Comments Due: 5 p.m. ET 4/18/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-714-001.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, LLC.
Description: Compliance filing: Compliance filing per 2/28/2017
order to correct Att. H-16A eff 1/1/17 & 2/1/17 to be effective 1/1/
2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5126.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1318-000.
Applicants: Redbed Plains Wind Farm LLC.
Description: Baseline eTariff Filing: MBR Application to be
effective 5/28/2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5102.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1319-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2646R4 Kansas Municipal
Energy Agency NITSA and NOA to be effective 3/1/2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5121.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1320-000.
Applicants: Odyssey Solar, LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
12/13/9998.
Filed Date: 3/28/17.
Accession Number: 20170328-5183.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1321-000.
Applicants: Puget Sound Energy, Inc.
Description: Initial rate filing: RES Engineering and Procurement
Agreement, Original Service Agreement No. 831 to be effective 3/1/2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5212
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1322-000.
Applicants: Western Massachusetts Electric Company.
Description: Sec. 205(d) Rate Filing: Interconnection and
Operating Agreement with Essential Power MA. Amendment No. 2 to be
effective 3/29/2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5214.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1323-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company, MidAmerican Energy Company.
Description: Sec. 205(d) Rate Filing: 2017-03-28_SA 3009 ATXI-MEC
TIA to be effective 3/30/2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5224.
Comments Due: 5 p.m. ET 4/18/17.
Docket Numbers: ER17-1324-000.
Applicants: Playa Solar 2, LLC.
Description: Baseline eTariff Filing: Application for Initial
Market-Based Rate Tariff and Granting Certain Waivers to be effective
3/29/2017.
Filed Date: 3/28/17.
Accession Number: 20170328-5242
Comments Due: 5 p.m. ET 4/18/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern
[[Page 16191]]
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.