Northern Natural Gas Company; Notice of Request Under Blanket Authorization, 16191 [2017-06419]
Download as PDF
Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06467 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–76–000]
mstockstill on DSK3G9T082PROD with NOTICES
Northern Natural Gas Company; Notice
of Request Under Blanket
Authorization
Take notice that on March 15, 2017,
Northern Natural Gas Company
(Northern), 1111 South 103rd Street,
Omaha, Nebraska 68124, filed in Docket
No. CP17–76–000 a prior notice request
pursuant to sections 157.205, 157.208,
and 157.216 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
(NGA) and Northern’s blanket
authorizations issued in Docket No.
CP82–401–000. Northern seeks
authorization to (1) install and operate
a compressor station and (2) abandon
segments of pipeline, all as more fully
set forth in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Northern proposes to install and
operate a new 15,900-horsepower (HP)
compressor station (Lake Mills
Compressor Station) in Worth County,
Iowa. Additionally, Northern proposes
to abandon approximately 60 feet of
pipe from both the D- and E-lines to
facilitate tie-ins. Northern states that the
facilities proposed herein constitute a
discrete, stand-alone project under the
large umbrella of the Northern Lights
VerDate Sep<11>2014
18:32 Mar 31, 2017
Jkt 241001
expansion plan. The total cost is
approximately $30,500,000.
Any questions regarding this
Application should be directed to
Michael T Loeffler, Senior Director,
Certificates and External Affairs for
Northern, 1111 South 103rd Street,
Omaha, Nebraska 68124, by phone (402)
398–7103, by fax (402) 398–7592, or by
email at mike.loeffler@nngco.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
16191
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–06419 Filed 3–31–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC17–9–000]
Commission Information Collection
Activities (FERC–510, FERC–520,
FERC–561, and FERC–583);
Consolidated Comment Request;
Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information
collections and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the requirements
and burden of the information
collections described below.
DATES: Comments on the collections of
information are due June 2, 2017.
ADDRESSES: You may submit comments
(identified by Docket No. IC17–9–000)
by either of the following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/efiling.
asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Please reference the specific
collection number and/or title in your
comments.
SUMMARY:
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Page 16191]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06419]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-76-000]
Northern Natural Gas Company; Notice of Request Under Blanket
Authorization
Take notice that on March 15, 2017, Northern Natural Gas Company
(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in
Docket No. CP17-76-000 a prior notice request pursuant to sections
157.205, 157.208, and 157.216 of the Federal Energy Regulatory
Commission's (Commission) regulations under the Natural Gas Act (NGA)
and Northern's blanket authorizations issued in Docket No. CP82-401-
000. Northern seeks authorization to (1) install and operate a
compressor station and (2) abandon segments of pipeline, all as more
fully set forth in the application which is on file with the Commission
and open to public inspection. The filing may also be viewed on the web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Northern proposes to install and operate a new 15,900-horsepower
(HP) compressor station (Lake Mills Compressor Station) in Worth
County, Iowa. Additionally, Northern proposes to abandon approximately
60 feet of pipe from both the D- and E-lines to facilitate tie-ins.
Northern states that the facilities proposed herein constitute a
discrete, stand-alone project under the large umbrella of the Northern
Lights expansion plan. The total cost is approximately $30,500,000.
Any questions regarding this Application should be directed to
Michael T Loeffler, Senior Director, Certificates and External Affairs
for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, by phone
(402) 398-7103, by fax (402) 398-7592, or by email at
mike.loeffler@nngco.com.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit an original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06419 Filed 3-31-17; 8:45 am]
BILLING CODE 6717-01-P