Combined Notice of Filings, 15520-15521 [2017-06159]
Download as PDF
15520
Federal Register / Vol. 82, No. 59 / Wednesday, March 29, 2017 / Notices
applicant is replacing and upgrading.
The project would be located in the
town of Danby in Rutland County,
Vermont.
Applicant Contact: Robert Yoder, 241
Killington Avenue, Rutland, VT 05701
Phone No. (720) 425–2818.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) An
approximately 10-foot by 10-foot shed
containing two 800-kW turbine/
generating units with a total installed
capacity of 1.6 kW; (2) a short penstock
to the turbine that wyes off a 4-inchdiameter water supply pipeline; (3) a
20-foot-long, open channel tailrace
discharging water to Mill Brook; and (4)
appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 13,000 kilowatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
mstockstill on DSK3G9T082PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: The
proposed addition of the hydroelectric
project along the upgraded irrigation
and domestic water supply pipeline will
not alter its primary purpose. Yoder
Farm has stated that the primary
purpose of the pipeline upgrade is to
improve the efficiency of the existing
pipe, and that it will proceed with the
pipeline upgrade regardless of the
ability to generate electricity. Yoder
Farm has also indicated that the
generator is subordinate to the
agricultural demands of the conduit,
and will operate only in instances
where excess water must be released.
Therefore, based upon the above
information and criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
VerDate Sep<11>2014
16:54 Mar 28, 2017
Jkt 241001
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
1 18
PO 00000
CFR 385.2001–2005 (2016).
Frm 00040
Fmt 4703
Sfmt 4703
Y
Y
Y
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD17–9) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: March 23, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–06157 Filed 3–28–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP17–78–000.
Applicants: B&W Pipeline, Inc.
Description: Application for Limited
Jurisdiction Blanket Certificate and
E:\FR\FM\29MRN1.SGM
29MRN1
mstockstill on DSK3G9T082PROD with NOTICES
Federal Register / Vol. 82, No. 59 / Wednesday, March 29, 2017 / Notices
Request for Expedited Action of B&W
Pipeline, Inc.
Filed Date: 03/16/2017.
Accession Number: 20170317–5191.
Comment Date: 5:00 p.m. Eastern
Time on Friday, April 07, 2017.
Docket Numbers: RP16–137–012.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Tallgrass Interstate Gas
Transmission, LLC submits tariff filing
per 154.203: Cancellation of TIGT 5th
Revised Volume No. 1 Tariff to be
effective 4/1/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317–5186.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, March 29, 2017.
Docket Numbers: RP17–541–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Iroquois Gas
Transmission System, L.P. submits tariff
filing per 154.204: 03/17/17 Negotiated
Rates—Consolidated Edison Energy Inc.
(HUB) 2275–89 to be effective 3/16/
2017.
Filed Date: 03/17/2017.
Accession Number: 20170317–5062.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, March 29, 2017.
Docket Numbers: RP17–542–000.
Applicants: ANR Pipeline Company.
Description: ANR Pipeline Company
submits tariff filing per 154.601: Shell
Energy FTS–1 NC Agreement to be
effective 4/1/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317–5107.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, March 29, 2017.
Docket Numbers: RP17–543–000.
Applicants: Ryckman Creek
Resources, LLC.
Description: Ryckman Creek
Resources, LLC submits tariff filing per
154.204: Non Conforming Service
Agreements to be effective 4/1/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317–5124.
Comment Date: 5:00 p.m. Eastern
Time on Friday, March 24, 2017.
Docket Numbers: RP13–459–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Trailblazer Pipeline
Company LLC submits tariff filing per
154.501: 2016 Penalty Revenue Credit
Report.
Filed Date: 03/20/2017.
Accession Number: 20170320–5168.
Comment Date: 5:00 p.m. Eastern
Time on Monday, April 03, 2017.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
VerDate Sep<11>2014
16:54 Mar 28, 2017
Jkt 241001
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 21, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–06159 Filed 3–28–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–74–000]
National Fuel Gas Supply Corporation;
Notice of Application
Take notice that on March 10, 2017,
National Fuel Gas Supply Corporation
(National Fuel), having its principal
place of business at 6363 Main Street,
Williamsville, New York 14221 filed in
the above referenced docket an
application pursuant to section 7(b) and
7(c) of the Natural Gas Act (NGA), and
Part 157 of the Commission’s
regulations requesting authorization to
construct, replace, idle, and abandon
four separate pipeline sections and
appurtenant facilities located in
Cameron, Elk and McKean Counties,
Pennsylvania, referred to as the Line
YM28 and Line FM120 Modernization
Project (Project), all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing is available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Randy C.
Rucinski, Assistant General Counsel for
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
15521
National Fuel, 6363 Main Street,
Williamsville, New York 14221, by
phone at (716) 857–7237, by fax (716)
857–7206 or by emailing rucinskir@
natfuel.com.
Specifically, the National Fuel
proposes the following modifications: (i)
Construct approximately 14.4 miles of
new 12-inch diameter pipeline (new
Line KL), (ii) replace via insertion
approximately 5.8 miles of Line FM120,
(iii) idle approximately 12.5 miles of
Line FM120, and (iv) abandon in place
approximately 7.7 miles of the existing
Line YM28. The Project is designed to
enhance service to National Fuel’s
existing customers and improve the
reliability and flexibility of National
Fuel’s system for existing shippers. The
total cost of the Project is approximately
$39,500,000.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 82, Number 59 (Wednesday, March 29, 2017)]
[Notices]
[Pages 15520-15521]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-06159]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP17-78-000.
Applicants: B&W Pipeline, Inc.
Description: Application for Limited Jurisdiction Blanket
Certificate and
[[Page 15521]]
Request for Expedited Action of B&W Pipeline, Inc.
Filed Date: 03/16/2017.
Accession Number: 20170317-5191.
Comment Date: 5:00 p.m. Eastern Time on Friday, April 07, 2017.
Docket Numbers: RP16-137-012.
Applicants: Tallgrass Interstate Gas Transmission, L.
Description: Tallgrass Interstate Gas Transmission, LLC submits
tariff filing per 154.203: Cancellation of TIGT 5th Revised Volume No.
1 Tariff to be effective 4/1/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317-5186.
Comment Date: 5:00 p.m. Eastern Time on Wednesday, March 29, 2017.
Docket Numbers: RP17-541-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Iroquois Gas Transmission System, L.P. submits tariff
filing per 154.204: 03/17/17 Negotiated Rates--Consolidated Edison
Energy Inc. (HUB) 2275-89 to be effective 3/16/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317-5062.
Comment Date: 5:00 p.m. Eastern Time on Wednesday, March 29, 2017.
Docket Numbers: RP17-542-000.
Applicants: ANR Pipeline Company.
Description: ANR Pipeline Company submits tariff filing per
154.601: Shell Energy FTS-1 NC Agreement to be effective 4/1/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317-5107.
Comment Date: 5:00 p.m. Eastern Time on Wednesday, March 29, 2017.
Docket Numbers: RP17-543-000.
Applicants: Ryckman Creek Resources, LLC.
Description: Ryckman Creek Resources, LLC submits tariff filing per
154.204: Non Conforming Service Agreements to be effective 4/1/2017.
Filed Date: 03/17/2017.
Accession Number: 20170317-5124.
Comment Date: 5:00 p.m. Eastern Time on Friday, March 24, 2017.
Docket Numbers: RP13-459-000.
Applicants: Trailblazer Pipeline Company LLC.
Description: Trailblazer Pipeline Company LLC submits tariff filing
per 154.501: 2016 Penalty Revenue Credit Report.
Filed Date: 03/20/2017.
Accession Number: 20170320-5168.
Comment Date: 5:00 p.m. Eastern Time on Monday, April 03, 2017.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 21, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-06159 Filed 3-28-17; 8:45 am]