Littleville Power Company, Inc.; Hitchcock Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 14887 [2017-05791]

Download as PDF Federal Register / Vol. 82, No. 55 / Thursday, March 23, 2017 / Notices Dated: March 15, 2017. Kimberly D. Bose, Secretary . [FR Doc. 2017–05780 Filed 3–22–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2801–040] sradovich on DSK3GMQ082PROD with NOTICES Littleville Power Company, Inc.; Hitchcock Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On February 9, 2017, Littleville Power Company, Inc. (transferor) and Hitchcock Hydro, LLC (transferee) filed an application for the transfer of license of the Glendale Hydroelectric Project No. 2801. The project is located on the Housatonic River in Berkshire County, Massachusetts. The project does not occupy Federal lands. The applicants seek Commission approval to transfer the license for the Glendale Hydroelectric Project from the transferor to the transferee. Applicant’s Contacts: For Transferor: Mr. Stephen Pike, Vice President, Operations, Littleville Power Company, Inc., c/o Enel Green Power North America, Inc., 1 Tech Drive, Suite 220, Andover, MA 01810, Email: Stephen.Pike@enel.com, Vice President, Power Supply & General Counsel, Green Mountain Power Corporation, 163 Acorn Lane, Colchester; VT 05446; Ms. Elizabeth Kohler, Esq., Downs Rachlin Martin PLLC, 199 Main Street, P.O. Box 190, Burlington, VT 05402; and General Counsel, Enel Green Power North America, Inc., 1 Tech Drive, Suite 220, Andover, MA 01810, Email: generalcounsel@enel.com. For Transferee: Mr. Mark J. Boumansour, Chief Operating Officer, Hitchcock Hydro, LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, Suite 220, Boulder, CO 80302, Phone: (303) 440–3378, Email: mark@gravityrenewables.com; Mr. Karl F. Kumli, III, Dietze and Davis, P.C., 2060 Broadway, Suite 400, Boulder, CO 80302; and Mr. Robert A. Panasci, Esq., Young/Sommer, LLC, Executive Woods, Palisades Drive, Albany, NY 12205. FERC Contact: Patricia W. Gillis, (202) 502–8735, patricia.gillis@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and VerDate Sep<11>2014 17:13 Mar 22, 2017 Jkt 241001 protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2801–040. Dated: March 16, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–05791 Filed 3–22–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 14839–000] Village of North Bennington; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 28, 2017, the Village of North Bennington, Vermont, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Lake Paran Dam Hydroelectric Project (Lake Paran Project or project) to be located on Paran Creek, near the Village of North Bennington, in Bennington County, Vermont. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Lake Paran Project would consist of: (1) The existing 120foot-long, 10-foot-concrete gravity Lake Paran Dam and spillway; (2) an existing 35-acre impoundment with a normal maximum water surface elevation 646.65 feet above mean sea level; (3) a new intake structure; (4) a new 250-footlong, 36-inch diameter penstock; (5) a new 20-foot-long, 10-foot-wide concrete PO 00000 Frm 00023 Fmt 4703 Sfmt 9990 14887 and wood powerhouse containing a single 58-kilowatt turbine-generator unit; (6) a new 1,000-foot-long, 12.47kilovolt transmission line; and (7) appurtenant facilities. The estimated annual generation of the Lake Paran Project would be 281.84 megawatthours. Applicant Contact: William F. Scully, P.O. Box 338, North Bennington, Vermont 05257; phone: (802) 379–2469; email: wfscully@gmail.com. FERC Contact: Michael Watts; phone: (202) 502–6123; email: michael.watts@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14839–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14839) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 16, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–05794 Filed 3–22–17; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 82, Number 55 (Thursday, March 23, 2017)]
[Notices]
[Page 14887]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-05791]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2801-040]


Littleville Power Company, Inc.; Hitchcock Hydro, LLC; Notice of 
Application for Transfer of License and Soliciting Comments, Motions To 
Intervene, and Protests

    On February 9, 2017, Littleville Power Company, Inc. (transferor) 
and Hitchcock Hydro, LLC (transferee) filed an application for the 
transfer of license of the Glendale Hydroelectric Project No. 2801. The 
project is located on the Housatonic River in Berkshire County, 
Massachusetts. The project does not occupy Federal lands.
    The applicants seek Commission approval to transfer the license for 
the Glendale Hydroelectric Project from the transferor to the 
transferee.
    Applicant's Contacts: For Transferor: Mr. Stephen Pike, Vice 
President, Operations, Littleville Power Company, Inc., c/o Enel Green 
Power North America, Inc., 1 Tech Drive, Suite 220, Andover, MA 01810, 
Email: Stephen.Pike@enel.com, Vice President, Power Supply & General 
Counsel, Green Mountain Power Corporation, 163 Acorn Lane, Colchester; 
VT 05446; Ms. Elizabeth Kohler, Esq., Downs Rachlin Martin PLLC, 199 
Main Street, P.O. Box 190, Burlington, VT 05402; and General Counsel, 
Enel Green Power North America, Inc., 1 Tech Drive, Suite 220, Andover, 
MA 01810, Email: generalcounsel@enel.com.
    For Transferee: Mr. Mark J. Boumansour, Chief Operating Officer, 
Hitchcock Hydro, LLC, c/o Gravity Renewables, Inc., 1401 Walnut Street, 
Suite 220, Boulder, CO 80302, Phone: (303) 440-3378, Email: 
mark@gravityrenewables.com; Mr. Karl F. Kumli, III, Dietze and Davis, 
P.C., 2060 Broadway, Suite 400, Boulder, CO 80302; and Mr. Robert A. 
Panasci, Esq., Young/Sommer, LLC, Executive Woods, Palisades Drive, 
Albany, NY 12205.
    FERC Contact: Patricia W. Gillis, (202) 502-8735, 
patricia.gillis@ferc.gov.
    Deadline for filing comments, motions to intervene, and protests: 
30 days from the date that the Commission issues this notice. The 
Commission strongly encourages electronic filing. Please file comments, 
motions to intervene, and protests using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2801-040.

    Dated: March 16, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-05791 Filed 3-22-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.