Town of Carbondale, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 14712-14713 [2017-05669]
Download as PDF
14712
Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Notices
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2302–085.
k. Description of Request: The
licensee requests to remove the Canal
System and its four non-operating canal
generating facilities from the Lewiston
Falls Project and convey the canals and
the conveyance facilities to the City of
Lewiston for non-hydropower
redevelopment and public use. This
would reduce the project’s installed
capacity from 35.6 MW to 28 MW, but
the operation of the project would
remain unchanged.
l. This filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction in the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 13, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–05674 Filed 3–21–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD17–8–000]
Town of Carbondale, Colorado; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On March 9, 2017, the Town of
Carbondale, Colorado, filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Town of
Carbondale Nettle Creek WTP Hydro
Project would have an installed capacity
of 28 kilowatts (kW), and would be
located along an existing raw water
pipeline adjacent to the applicant’s
water treatment plant. The project
would be located near the Town of
Carbondale in Pitkin County, Colorado.
Applicant Contact: Mark O’Meara,
Utility Director, Town of Carbondale,
511 Colorado Avenue, Carbondale, CO
81623 Phone No. (970) 963–3140.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) An new
pressure reduction valve vault
containing one turbine/generating unit
with an installed capacity of 28 kW; (2)
a short, 10-inch-diameter penstock
teeing off the existing raw water
pipeline; (3) a short, 10-inch-diameter
discharge pipe returning water to the
existing raw water pipeline; and (4)
appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of 190,000 kilowatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii),
HREA.
VerDate Sep<11>2014
as
amended
18:14 Mar 21, 2017
by
Jkt 241001
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
E:\FR\FM\22MRN1.SGM
22MRN1
Y
Y
Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Notices
14713
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Description
Satisfies
(Y/N)
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
Statutory provision
asabaliauskas on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(iii),
HREA.
as
amended
by
Preliminary Determination: The
proposed addition of the hydroelectric
project along the existing raw water
pipeline will not alter its primary
purpose. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
1 18
CFR 385.2001–2005 (2016).
VerDate Sep<11>2014
18:14 Mar 21, 2017
Jkt 241001
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD17–8) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: March 13, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–05669 Filed 3–21–17; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–ORD–2015–0765; FRL–9960–04–
ORD]
Board of Scientific Counselors
Homeland Security Subcommittee;
Notification of Public Teleconference
and Public Comment
Environmental Protection
Agency (EPA).
ACTION: Notification of public meeting
and public comment.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, Public Law
92–463, the U.S. Environmental
Protection Agency hereby provides
notice that the Board of Scientific
Counselors (BOSC) Homeland Security
Subcommittee (HSS) will host a public
SUMMARY:
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
teleconference. The meeting will be
held on Tuesday, March 28, 2017 from
11:00 a.m. to 12:30 p.m. All times noted
are Eastern Time and are approximate.
The primary discussions will focus on
finalizing the draft report on the
effective and efficient tools, strategies
and methods to characterize and assess
exposure and decontamination
following a biological contamination
incident. There will be a public
comment period at 11:15 a.m. For
information on registering to participate
on the call or to provide public
comment, please see the SUPPLEMENTARY
INFORMATION section below. Due to
unforeseen administrative
circumstances, EPA is announcing this
meeting with less than fifteen calendar
days’ notice.
DATES: The BOSC HSS meeting will be
held on Tuesday, March 28, 2017 from
11:00 a.m. to 12:30 p.m. All times noted
are Eastern Time and are approximate.
FOR FURTHER INFORMATION CONTACT:
Questions or correspondence
concerning the meeting should be
directed to Tom Tracy, Designated
Federal Officer, Environmental
Protection Agency, by mail at 1200
Pennsylvania Avenue NW., (MC 8104
R), Washington, DC 20460; by telephone
at 202–564–6518; fax at 202–565–2911;
or via email at tracy.tom@epa.gov.
SUPPLEMENTARY INFORMATION: The
Charter of the BOSC states that the
advisory committee shall provide
independent advice to the
Administrator on technical and
management aspects of the ORD’s
research program. Additional
information about the BOSC is available
at: https://www2.epa.gov/bosc.
Registration: In order to participate in
the meeting, you must register at the
following site: https://us-epa-2017-boschs-subcommitteeteleconference.eventbrite.com. Once you
have completed the online registration,
you will be contacted and provided
with the meeting information.
Registration will close on March 27,
2017.
Oral Statements: Members of the
public who wish to provide oral
comment during the meeting must
preregister. Individuals or groups
making remarks during the public
comment period will be limited to five
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 82, Number 54 (Wednesday, March 22, 2017)]
[Notices]
[Pages 14712-14713]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-05669]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD17-8-000]
Town of Carbondale, Colorado; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On March 9, 2017, the Town of Carbondale, Colorado, filed a notice
of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act (FPA), as amended by
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA).
The proposed Town of Carbondale Nettle Creek WTP Hydro Project would
have an installed capacity of 28 kilowatts (kW), and would be located
along an existing raw water pipeline adjacent to the applicant's water
treatment plant. The project would be located near the Town of
Carbondale in Pitkin County, Colorado.
Applicant Contact: Mark O'Meara, Utility Director, Town of
Carbondale, 511 Colorado Avenue, Carbondale, CO 81623 Phone No. (970)
963-3140.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) An new pressure reduction valve vault
containing one turbine/generating unit with an installed capacity of 28
kW; (2) a short, 10-inch-diameter penstock teeing off the existing raw
water pipeline; (3) a short, 10-inch-diameter discharge pipe returning
water to the existing raw water pipeline; and (4) appurtenant
facilities. The proposed project would have an estimated annual
generating capacity of 190,000 kilowatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
[[Page 14713]]
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed addition of the
hydroelectric project along the existing raw water pipeline will not
alter its primary purpose. Therefore, based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions To Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2016).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD17-8) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: March 13, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-05669 Filed 3-21-17; 8:45 am]
BILLING CODE 6717-01-P