Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Dallas County, Texas, 14275 [2017-05367]

Download as PDF asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 82, No. 51 / Friday, March 17, 2017 / Notices inadequate to meet future traffic volumes, resulting in congestion and reduced north/south mobility. In addition, regional population growth continues to increase demand for additional capacity and access in this corridor and the region. The purpose of the project is to provide a facility that would reduce congestion and improve mobility between IH 30 and IH 20 in southeast Dallas County, while contributing to improved system linkage. The EIS will develop and evaluate a range of Build Alternatives and a NoBuild Alternative within the study corridor, generally bounded to the east by the Dallas/Kaufman County Line, and to the west by Bobtown Road in Garland, Collins Road and Clay Road in Sunnyvale, and Clay-Mathis Road and Lawson Road in Mesquite. The EIS will include an analysis of tolled lanes. The EIS will analyze potential impacts from construction and operation of the proposed roadway including, but not limited to, the following: Transportation impacts, air quality and noise impacts; water quality impacts including storm water runoff; impacts to waters of the United States, including wetlands; impacts to floodplains; impacts to historic and archeological resources; socioeconomic impacts, including Environmental Justice and Limited English Proficiency populations; impacts to land use, vegetation, and wildlife, including threatened and endangered species; impacts to or potential displacement of residents and businesses; and impacts to aesthetic and visual resources. TxDOT will issue a single Final Environmental Impact Statement and Record of Decision document pursuant to Public Law 112–141, 126 Stat. 405, Section 1319(b) unless TxDOT determines statutory criteria or practicability considerations preclude issuance of the combined document pursuant to section 1319. Anticipated state and federal permits, pending selection of alternatives and field surveys, may include, but are not limited to, the following: United States Army Corps of Engineers (USACE) Section 404 permit; Texas Commission on Environmental Quality (TCEQ) Section 401 Water Quality Certification; TCEQ Texas Pollutant Discharge Elimination System (TPDES) permit. Public involvement is a critical component of the project development process and will continue throughout the development of the EIS. A draft Project Coordination Plan has been developed in accordance with 23 U.S.C. 139, Efficient Environmental Reviews for Project Decision Making, to identify VerDate Sep<11>2014 20:02 Mar 16, 2017 Jkt 241001 14275 and document opportunities for project involvement by the public and other agencies. The Project Coordination Plan will promote involvement from stakeholders, agencies, and the public as well as describe the proposed project, the roles of the agencies and the public, the project purpose and need, schedule, level of detail for alternatives analysis, and the proposed process for coordination and communication. The Project Coordination Plan will be available for public review, input, and comments at the public meetings, including scoping meetings, and hearing held in accordance with the National Environmental Policy Act (NEPA), and upon request at the TxDOT Dallas District Office. In accordance with 23 U.S.C. 139, cooperating agencies, participating agencies, and the public will be given an opportunity for continued input on project development. Agency meetings are ongoing and a public scoping meeting is planned for late spring of 2017. The purpose of the public scoping meeting is to present the project studies completed to date and identify significant and other relevant issues related to the proposed SH 190 corridor as part of the NEPA process. The scoping meeting will provide an opportunity for participating agencies, cooperating agencies, and the public to review and comment on the draft Project Coordination Plan, the project purpose and need, and the range of alternatives developed to date to be considered and evaluated in the EIS. In addition to the agency and public scoping meetings, a public hearing will be held. Public notice will be given of the time and place of the meetings and hearing. To ensure that the full range of issues related to this proposed action is addressed and all significant issues are identified, comments and suggestions are invited from all interested parties. Such comments or questions concerning this proposed action should be directed to TxDOT at the address provided above. DEPARTMENT OF TRANSPORTATION (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction.) Issued on: March 13, 2017. Michael T. Leary, Director, Planning and Program Development, Federal Highway Administration. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction.) [FR Doc. 2017–05370 Filed 3–16–17; 8:45 am] BILLING CODE 4910–22–P PO 00000 Frm 00078 Fmt 4703 Federal Highway Administration Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Dallas County, Texas Texas Department of Transportation (TxDOT), Federal Highway Administration (FHWA), Department of Transportation. AGENCY: Notice to rescind a Notice of Intent to prepare an Environmental Impact Statement (EIS). ACTION: FHWA, on behalf of TxDOT, is issuing this notice to advise the public that we are rescinding the Notice of Intent (NOI) for the proposed SH 190 project from IH 30 to IH 20 in southeast Dallas County. An NOI to prepare an EIS was published in the Federal Register on July 1, 2005. SUMMARY: FOR FURTHER INFORMATION CONTACT: Travis Owens, P.E., Transportation Engineer, 4777 E. Highway 80, Mesquite, Texas, 75150; telephone: (214) 320–6625; email: travis.owens@ txdot.gov. TxDOT’s normal business hours are 8:00 a.m.–5:00 p.m., Monday through Friday. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carriedout by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. FHWA, in cooperation with TxDOT, published an NOI in the Federal Register on July 1, 2005. Because so much time has passed since the original NOI, TxDOT is rescinding the old NOI and will publish a new NOI to re-initiate the EIS process. The new NOI should be published in the Federal Register either in this edition or in the near future. Comments or questions concerning this proposed action should be directed to TxDOT at the address provided above. SUPPLEMENTARY INFORMATION: Issued on: March 13, 2017. Michael T. Leary, Director, Planning and Program Development, Federal Highway Administration. [FR Doc. 2017–05367 Filed 3–16–17; 8:45 am] BILLING CODE 4910–22–P Sfmt 9990 E:\FR\FM\17MRN1.SGM 17MRN1

Agencies

[Federal Register Volume 82, Number 51 (Friday, March 17, 2017)]
[Notices]
[Page 14275]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-05367]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Notice To Rescind a Notice of Intent To Prepare an Environmental 
Impact Statement: Dallas County, Texas

AGENCY: Texas Department of Transportation (TxDOT), Federal Highway 
Administration (FHWA), Department of Transportation.

ACTION: Notice to rescind a Notice of Intent to prepare an 
Environmental Impact Statement (EIS).

-----------------------------------------------------------------------

SUMMARY: FHWA, on behalf of TxDOT, is issuing this notice to advise the 
public that we are rescinding the Notice of Intent (NOI) for the 
proposed SH 190 project from IH 30 to IH 20 in southeast Dallas County. 
An NOI to prepare an EIS was published in the Federal Register on July 
1, 2005.

FOR FURTHER INFORMATION CONTACT: Travis Owens, P.E., Transportation 
Engineer, 4777 E. Highway 80, Mesquite, Texas, 75150; telephone: (214) 
320-6625; email: travis.owens@txdot.gov. TxDOT's normal business hours 
are 8:00 a.m.-5:00 p.m., Monday through Friday.

SUPPLEMENTARY INFORMATION: The environmental review, consultation, and 
other actions required by applicable Federal environmental laws for 
this project are being, or have been, carried-out by TxDOT pursuant to 
23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 
2014, and executed by FHWA and TxDOT. FHWA, in cooperation with TxDOT, 
published an NOI in the Federal Register on July 1, 2005. Because so 
much time has passed since the original NOI, TxDOT is rescinding the 
old NOI and will publish a new NOI to re-initiate the EIS process. The 
new NOI should be published in the Federal Register either in this 
edition or in the near future. Comments or questions concerning this 
proposed action should be directed to TxDOT at the address provided 
above.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction.)

    Issued on: March 13, 2017.
Michael T. Leary,
Director, Planning and Program Development, Federal Highway 
Administration.
[FR Doc. 2017-05367 Filed 3-16-17; 8:45 am]