Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Dallas County, Texas, 14275 [2017-05367]
Download as PDF
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 82, No. 51 / Friday, March 17, 2017 / Notices
inadequate to meet future traffic
volumes, resulting in congestion and
reduced north/south mobility. In
addition, regional population growth
continues to increase demand for
additional capacity and access in this
corridor and the region. The purpose of
the project is to provide a facility that
would reduce congestion and improve
mobility between IH 30 and IH 20 in
southeast Dallas County, while
contributing to improved system
linkage.
The EIS will develop and evaluate a
range of Build Alternatives and a NoBuild Alternative within the study
corridor, generally bounded to the east
by the Dallas/Kaufman County Line,
and to the west by Bobtown Road in
Garland, Collins Road and Clay Road in
Sunnyvale, and Clay-Mathis Road and
Lawson Road in Mesquite. The EIS will
include an analysis of tolled lanes. The
EIS will analyze potential impacts from
construction and operation of the
proposed roadway including, but not
limited to, the following: Transportation
impacts, air quality and noise impacts;
water quality impacts including storm
water runoff; impacts to waters of the
United States, including wetlands;
impacts to floodplains; impacts to
historic and archeological resources;
socioeconomic impacts, including
Environmental Justice and Limited
English Proficiency populations;
impacts to land use, vegetation, and
wildlife, including threatened and
endangered species; impacts to or
potential displacement of residents and
businesses; and impacts to aesthetic and
visual resources.
TxDOT will issue a single Final
Environmental Impact Statement and
Record of Decision document pursuant
to Public Law 112–141, 126 Stat. 405,
Section 1319(b) unless TxDOT
determines statutory criteria or
practicability considerations preclude
issuance of the combined document
pursuant to section 1319.
Anticipated state and federal permits,
pending selection of alternatives and
field surveys, may include, but are not
limited to, the following: United States
Army Corps of Engineers (USACE)
Section 404 permit; Texas Commission
on Environmental Quality (TCEQ)
Section 401 Water Quality Certification;
TCEQ Texas Pollutant Discharge
Elimination System (TPDES) permit.
Public involvement is a critical
component of the project development
process and will continue throughout
the development of the EIS. A draft
Project Coordination Plan has been
developed in accordance with 23 U.S.C.
139, Efficient Environmental Reviews
for Project Decision Making, to identify
VerDate Sep<11>2014
20:02 Mar 16, 2017
Jkt 241001
14275
and document opportunities for project
involvement by the public and other
agencies. The Project Coordination Plan
will promote involvement from
stakeholders, agencies, and the public as
well as describe the proposed project,
the roles of the agencies and the public,
the project purpose and need, schedule,
level of detail for alternatives analysis,
and the proposed process for
coordination and communication. The
Project Coordination Plan will be
available for public review, input, and
comments at the public meetings,
including scoping meetings, and hearing
held in accordance with the National
Environmental Policy Act (NEPA), and
upon request at the TxDOT Dallas
District Office.
In accordance with 23 U.S.C. 139,
cooperating agencies, participating
agencies, and the public will be given
an opportunity for continued input on
project development. Agency meetings
are ongoing and a public scoping
meeting is planned for late spring of
2017. The purpose of the public scoping
meeting is to present the project studies
completed to date and identify
significant and other relevant issues
related to the proposed SH 190 corridor
as part of the NEPA process. The
scoping meeting will provide an
opportunity for participating agencies,
cooperating agencies, and the public to
review and comment on the draft
Project Coordination Plan, the project
purpose and need, and the range of
alternatives developed to date to be
considered and evaluated in the EIS.
In addition to the agency and public
scoping meetings, a public hearing will
be held. Public notice will be given of
the time and place of the meetings and
hearing. To ensure that the full range of
issues related to this proposed action is
addressed and all significant issues are
identified, comments and suggestions
are invited from all interested parties.
Such comments or questions concerning
this proposed action should be directed
to TxDOT at the address provided
above.
DEPARTMENT OF TRANSPORTATION
(Catalog of Federal Domestic Assistance
Program Number 20.205, Highway Planning
and Construction.)
Issued on: March 13, 2017.
Michael T. Leary,
Director, Planning and Program Development,
Federal Highway Administration.
(Catalog of Federal Domestic Assistance
Program Number 20.205, Highway Planning
and Construction.)
[FR Doc. 2017–05370 Filed 3–16–17; 8:45 am]
BILLING CODE 4910–22–P
PO 00000
Frm 00078
Fmt 4703
Federal Highway Administration
Notice To Rescind a Notice of Intent To
Prepare an Environmental Impact
Statement: Dallas County, Texas
Texas Department of
Transportation (TxDOT), Federal
Highway Administration (FHWA),
Department of Transportation.
AGENCY:
Notice to rescind a Notice of
Intent to prepare an Environmental
Impact Statement (EIS).
ACTION:
FHWA, on behalf of TxDOT,
is issuing this notice to advise the
public that we are rescinding the Notice
of Intent (NOI) for the proposed SH 190
project from IH 30 to IH 20 in southeast
Dallas County. An NOI to prepare an
EIS was published in the Federal
Register on July 1, 2005.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Travis Owens, P.E., Transportation
Engineer, 4777 E. Highway 80,
Mesquite, Texas, 75150; telephone:
(214) 320–6625; email: travis.owens@
txdot.gov. TxDOT’s normal business
hours are 8:00 a.m.–5:00 p.m., Monday
through Friday.
The
environmental review, consultation, and
other actions required by applicable
Federal environmental laws for this
project are being, or have been, carriedout by TxDOT pursuant to 23 U.S.C. 327
and a Memorandum of Understanding
dated December 16, 2014, and executed
by FHWA and TxDOT. FHWA, in
cooperation with TxDOT, published an
NOI in the Federal Register on July 1,
2005. Because so much time has passed
since the original NOI, TxDOT is
rescinding the old NOI and will publish
a new NOI to re-initiate the EIS process.
The new NOI should be published in
the Federal Register either in this
edition or in the near future. Comments
or questions concerning this proposed
action should be directed to TxDOT at
the address provided above.
SUPPLEMENTARY INFORMATION:
Issued on: March 13, 2017.
Michael T. Leary,
Director, Planning and Program Development,
Federal Highway Administration.
[FR Doc. 2017–05367 Filed 3–16–17; 8:45 am]
BILLING CODE 4910–22–P
Sfmt 9990
E:\FR\FM\17MRN1.SGM
17MRN1
Agencies
[Federal Register Volume 82, Number 51 (Friday, March 17, 2017)]
[Notices]
[Page 14275]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-05367]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice To Rescind a Notice of Intent To Prepare an Environmental
Impact Statement: Dallas County, Texas
AGENCY: Texas Department of Transportation (TxDOT), Federal Highway
Administration (FHWA), Department of Transportation.
ACTION: Notice to rescind a Notice of Intent to prepare an
Environmental Impact Statement (EIS).
-----------------------------------------------------------------------
SUMMARY: FHWA, on behalf of TxDOT, is issuing this notice to advise the
public that we are rescinding the Notice of Intent (NOI) for the
proposed SH 190 project from IH 30 to IH 20 in southeast Dallas County.
An NOI to prepare an EIS was published in the Federal Register on July
1, 2005.
FOR FURTHER INFORMATION CONTACT: Travis Owens, P.E., Transportation
Engineer, 4777 E. Highway 80, Mesquite, Texas, 75150; telephone: (214)
320-6625; email: travis.owens@txdot.gov. TxDOT's normal business hours
are 8:00 a.m.-5:00 p.m., Monday through Friday.
SUPPLEMENTARY INFORMATION: The environmental review, consultation, and
other actions required by applicable Federal environmental laws for
this project are being, or have been, carried-out by TxDOT pursuant to
23 U.S.C. 327 and a Memorandum of Understanding dated December 16,
2014, and executed by FHWA and TxDOT. FHWA, in cooperation with TxDOT,
published an NOI in the Federal Register on July 1, 2005. Because so
much time has passed since the original NOI, TxDOT is rescinding the
old NOI and will publish a new NOI to re-initiate the EIS process. The
new NOI should be published in the Federal Register either in this
edition or in the near future. Comments or questions concerning this
proposed action should be directed to TxDOT at the address provided
above.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction.)
Issued on: March 13, 2017.
Michael T. Leary,
Director, Planning and Program Development, Federal Highway
Administration.
[FR Doc. 2017-05367 Filed 3-16-17; 8:45 am]