Water Street Land, LLC; Notice of Availability of Environmental Assessment, 13327 [2017-04722]
Download as PDF
Federal Register / Vol. 82, No. 46 / Friday, March 10, 2017 / Notices
Cooperative, Inc. to be effective
5/6/2017.
Filed Date: 3/6/17.
Accession Number: 20170306–5112.
Comments Due: 5 p.m. ET 3/27/17.
Docket Numbers: ER17–1105–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Exelon NITSA (OR D.A.) to be effective
2/28/2017.
Filed Date: 3/6/17.
Accession Number: 20170306–5129.
Comments Due: 5 p.m. ET 3/27/17.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR17–3–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of
Amendments to the Texas Reliability
Entity Bylaws and Regional Reliability
Standards Development Process.
Filed Date: 3/6/17.
Accession Number: 20170306–5079.
Comments Due: 5 p.m. ET 3/27/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for exemption from
licensing for the Natick Pond Dam
Hydroelectric Project, to be located on
the Pawtuxet River, in the towns of
Warwick and West Warwick, Kent
County, Rhode Island, and has prepared
an Environmental Assessment (EA). In
the EA, Commission staff analyzes the
potential environmental effects of the
project and concludes that issuing an
exemption for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact John
Ramer at (202) 502–8969 or john.ramer@
ferc.gov.
Dated: March 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–04722 Filed 3–9–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Dated: March 6, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2017–04727 Filed 3–9–17; 8:45 am]
[Docket No. CP17–40–000]
BILLING CODE 6717–01–P
Spire STL Pipeline Company, LLC;
Supplemental Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Spire STL Pipeline
Project and Request for Comments on
Environmental Issues
sradovich on DSK3GMQ082PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14680–002–RI]
Water Street Land, LLC; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
VerDate Sep<11>2014
18:37 Mar 09, 2017
Jkt 241001
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Spire STL Pipeline Project (Project)
involving construction and operation of
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
13327
facilities by Spire STL Pipeline
Company, LLC (Spire) in Scott, Greene,
and Jersey Counties, Illinois and St.
Charles and St. Louis Counties,
Missouri. The Commission will use this
EA in its decision-making process to
determine whether the Project is in the
public convenience and necessity.
On October 26, 2016, the Federal
Energy Regulatory Commission (FERC
or Commission) issued in Docket No.
PF16–9–000 a Notice of Intent to
Prepare an Environmental Assessment
for the Planned Spire STL Pipeline
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Sessions (NOI). Spire
has subsequently filed a potential
pipeline route alternative in St. Louis
County, Missouri.
This supplemental notice announces
the opening of the scoping process the
Commission will use to gather input
from the public and interested agencies
regarding the pipeline route alternative.
You can make a difference by providing
us with your specific comments or
concerns about the new route under
consideration. Your comments should
focus on the potential environmental
effects, reasonable alternatives, and
measures to avoid or lessen
environmental impacts. Your input will
help the Commission staff determine
what issues to evaluate in the EA. To
ensure that your comments are timely
and properly recorded, please send your
comments so that the Commission
receives them in Washington, DC on or
before April 3, 2017.
This notice is being sent to a subset
of the Commission’s current
environmental mailing list for this
Project, relevant to the new alternative
in St. Louis County. State and local
government representatives should also
notify their constituents and encourage
them to comment on their areas of
concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the Project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 82, Number 46 (Friday, March 10, 2017)]
[Notices]
[Page 13327]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-04722]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14680-002-RI]
Water Street Land, LLC; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has
reviewed the application for exemption from licensing for the Natick
Pond Dam Hydroelectric Project, to be located on the Pawtuxet River, in
the towns of Warwick and West Warwick, Kent County, Rhode Island, and
has prepared an Environmental Assessment (EA). In the EA, Commission
staff analyzes the potential environmental effects of the project and
concludes that issuing an exemption for the project, with appropriate
environmental measures, would not constitute a major federal action
significantly affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
field, to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
For further information, contact John Ramer at (202) 502-8969 or
john.ramer@ferc.gov.
Dated: March 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-04722 Filed 3-9-17; 8:45 am]
BILLING CODE 6717-01-P