Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Column Line N Wall ITAAC Dimension Change, 12856-12857 [2017-04455]
Download as PDF
12856
Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[Notice: (17–012)]
NASA Advisory Council; Human
Exploration and Operations
Committee; Meeting
National Aeronautics and
Space Administration.
ACTION: Notice of meeting.
AGENCY:
In accordance with the
Federal Advisory Committee Act, as
amended, the National Aeronautics and
Space Administration (NASA)
announces a meeting of the Human
Exploration and Operations Committee
of the NASA Advisory Council (NAC).
This Committee reports to the NAC.
DATES: Tuesday, March 28, 2017, 9:30
a.m.–5:30 p.m.; and Wednesday, March
29, 2017, 8:00 a.m.–2:30 p.m. All times
are Local Time.
ADDRESSES: NASA Headquarters,
Glennan Conference Center (Room
1Q39), 300 E Street SW., Washington,
DC 20546.
FOR FURTHER INFORMATION CONTACT: Dr.
Bette Siegel, Executive Secretary, NAC
Human Exploration and Operations
Committee, NASA Headquarters,
Washington, DC 20546, (202) 358–2245,
or bette.siegel@nasa.gov.
SUPPLEMENTARY INFORMATION: The
meeting will be open to the public up
to the seating capacity of the room. This
meeting is also available telephonically
and by WebEx. You must use a touch
tone phone to participate in this
meeting. Any interested person may call
the USA toll-free conference number 1–
844–467–6272, and then the numeric
participant passcode: 270812 followed
by the # sign. To join via WebEx, link
is https://nasa.webex.com/, the meeting
number is 999 427 165, and the
password is ‘‘Exploration@2017’’ (case
sensitive).
The agenda for the meeting includes
the following topics:
—Status of the NASA Human
Exploration and Operations Mission
Directorate
—Exploration Architecture Planning
—International Space Station and Low
Earth Orbit Commercialization
—Space Life and Physical Sciences
Research and Applications
—Commercial Space Division/
Commercial Crew Program
—Exploration Systems Development
Status
—Cislunar Hab/Environmental Control
and Life Support System
—In-Space Power/Propulsion
Attendees will be requested to sign a
register and to comply with NASA
sradovich on DSK3GMQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
16:01 Mar 06, 2017
Jkt 241001
Headquarters security requirements,
including the presentation of a valid
picture ID to Security before access to
NASA Headquarters. Due to the Real ID
Act, Public Law 109–13, any attendees
with driver’s licenses issued from noncompliant states/territories must present
a second form of ID. [Federal employee
badge; passport; active military
identification card; enhanced driver’s
license; U.S. Coast Guard Merchant
Mariner card; Native American tribal
document; school identification
accompanied by an item from LIST C
(documents that establish employment
authorization) from the ‘‘List of the
Acceptable Documents’’ on Form I–9].
Non-compliant states/territories are:
Maine, Minnesota, Missouri, Montana,
and Washington. Foreign nationals
attending this meeting will be required
to provide a copy of their passport and
visa in addition to providing the
following information no less than 10
days prior to the meeting: Full name;
gender; date/place of birth; citizenship;
passport information (number, country,
telephone); visa information (number,
type, expiration date); employer/
affiliation information (name of
institution, address, country,
telephone); title/position of attendee. To
expedite admittance, attendees that are
U.S. citizens and Permanent Residents
(green card holders) are requested to
provide full name and citizenship status
3 working days in advance. Information
should be sent to Dr. Bette Siegel via
email at bette.siegel@nasa.gov. It is
imperative that the meeting be held on
these dates to the scheduling priorities
of the key participants.
Patricia D. Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 2017–04465 Filed 3–6–17; 8:45 am]
BILLING CODE 7510–13–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc., Vogtle Electric Generating Plant,
Units 3 and 4; Column Line N Wall
ITAAC Dimension Change
Nuclear Regulatory
Commission.
ACTION: Exemption and combined
license amendment; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is granting an
exemption to allow a departure from the
SUMMARY:
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
certification information of Tier 1 of the
generic design control document (DCD)
and is issuing License Amendment No.
59 to Combined Licenses (COL), NPF–
91 and NPF–92. The COLs were issued
to Southern Nuclear Operating
Company, Inc., and Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC,
MEAG Power SPVJ, LLC, MEAG Power
SPVP, LLC, Authority of Georgia, and
the City of Dalton, Georgia (the
licensee); for construction and operation
of the Vogtle Electric Generating Plant
(VEGP) Units 3 and 4, located in Burke
County, Georgia.
The granting of the exemption allows
the changes to Tier 1 information asked
for in the amendment. Because the
acceptability of the exemption was
determined in part by the acceptability
of the amendment, the exemption and
amendment are being issued
concurrently.
DATES: The exemption and amendment
were issued on December 16, 2016.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document. The
request for the amendment and
exemption was submitted by letter
dated May 17, 2016, and available in
ADAMS under Accession No.
ML16138A431.
• NRC’s PDR: You may examine and
purchase copies of public documents at
E:\FR\FM\07MRN1.SGM
07MRN1
Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is granting an exemption
from Paragraph B of Section III, ‘‘Scope
and Contents,’’ of appendix D, ‘‘Design
Certification Rule for the AP1000,’’ to
part 52 of title 10 of the Code of Federal
Regulations (10 CFR), and issuing
License Amendment No. 59 to COLs,
NPF–91 and NPF–92, to the licensee.
The exemption is required by Paragraph
A.4 of Section VIII, ‘‘Processes for
Changes and Departures,’’ appendix D,
to 10 CFR part 52 to allow the licensee
to depart from Tier 1 information. With
the requested amendment, the licensee
sought proposed changes that would
revises COL Appendix C and plantspecific Tier 1, Table 3.3–1, ‘‘Definition
of Wall Thickness for Nuclear Island
Buildings, Turbine Building, and Annex
Building,’’ to change the tolerance for
the concrete wall thickness of the
Column Line N from Column Lines 2 to
4 between elevation (EL.) 100′–0″ and
EL.135′–3″ from ±1 inch to a tolerance
of ¥1 inch and +4 inches above grade.
For the remainder of the wall below
grade, the concrete thickness tolerance
remains unchanged as currently
specified in Note 2 of Tier 1, Table 3.3–
1, +12 inches and ¥1 inch.
Part of the justification for granting
the exemption was provided by the
review of the amendment. Because the
exemption is necessary in order to issue
the requested license amendment, the
NRC granted the exemption and issued
the amendment concurrently, rather
than in sequence. This included issuing
a combined safety evaluation containing
the NRC staff’s review of both the
exemption request and the license
amendment. The exemption met all
applicable regulatory criteria set forth in
10 CFR 50.12, 10 CFR 52.7, and Section
VIII.A.4 of appendix D to 10 CFR part
52. The license amendment was found
to be acceptable as well. The combined
safety evaluation is available in ADAMS
under Accession No. ML16315A426.
Identical exemption documents
(except for referenced unit numbers and
license numbers) were issued to the
licensee for VEGP Units 3 and 4 (COLs
NPF–91 and NPF–92). The exemption
documents for VEGP Units 3 and 4 can
be found in ADAMS under Accession
VerDate Sep<11>2014
16:01 Mar 06, 2017
Jkt 241001
Nos. ML16315A139 and ML16315A140,
respectively. The exemption is
reproduced (with the exception of
abbreviated titles and additional
citations) in Section II of this document.
The amendment documents for COLs
NPF–91 and NPF–92 are available in
ADAMS under Accession Nos.
ML16315A145 and ML16315A416,
respectively. A summary of the
amendment documents is provided in
Section III of this document.
II. Exemption
Reproduced below is the exemption
document issued to VEGP Units 3 and
Unit 4. It makes reference to the
combined safety evaluation that
provides the reasoning for the findings
made by the NRC (and listed under Item
1) in order to grant the exemption:
1. In a letter dated May 17, 2016, the
licensee requested from the Commission
an exemption to allow departures from
Tier 1 information in the certified DCD
incorporated by reference in 10 CFR
part 52, appendix D, as part of license
amendment request 16–003, ‘‘Column
Line N Wall ITAAC Dimension
Change.’’
For the reasons set forth in Section 3.1
of the NRC staff’s Safety Evaluation,
which can be found in ADAMS under
Accession No. ML16315A426, the
Commission finds that:
A. The exemption is authorized by
law;
B. the exemption presents no undue
risk to public health and safety;
C. the exemption is consistent with
the common defense and security;
D. special circumstances are present
in that the application of the rule in this
circumstance is not necessary to serve
the underlying purpose of the rule;
E. the special circumstances outweigh
any decrease in safety that may result
from the reduction in standardization
caused by the exemption; and
F. the exemption will not result in a
significant decrease in the level of safety
otherwise provided by the design.
2. Accordingly, the licensee is granted
an exemption from the certified DCD
Tier 1 information, with corresponding
changes to Appendix C of the Facility
Combined License as described in the
licensee’s request dated May 17, 2016.
This exemption is related to, and
necessary for the granting of License
Amendment No. 59, which is being
issued concurrently with this
exemption.
3. As explained in Section 5.0 of the
NRC staff’s Safety Evaluation (ADAMS
Accession No. ML16315A426), this
exemption meets the eligibility criteria
for categorical exclusion set forth in 10
CFR 51.22(c)(9). Therefore, pursuant to
PO 00000
Frm 00076
Fmt 4703
Sfmt 9990
12857
10 CFR 51.22(b), no environmental
impact statement or environmental
assessment needs to be prepared in
connection with the issuance of the
exemption.
4. This exemption is effective as of the
date of its issuance.
III. License Amendment Request
By letter dated May 17, 2016 (ADAMS
Accession No. ML16138A431), the
licensee requested that the NRC amend
the COLs for VEGP, Units 3 and 4, COLs
NPF–91 and NPF–92. The proposed
amendment is described in Section I of
this Federal Register notice.
The Commission has determined for
these amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or COL, as applicable, proposed
no significant hazards consideration
determination, and opportunity for a
hearing in connection with these
actions, was published in the Federal
Register on July 19, 2016 (81 FR 46958).
No comments were received during the
30-day comment period.
The Commission has determined that
these amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the
combined safety evaluation, the staff
granted the exemption and issued the
amendment that the licensee requested
on May 17, 2016. The exemption and
amendment were issued on December
16, 2016, as part of a combined package
to the licensee (ADAMS Accession No.
ML16315A113).
Dated at Rockville, Maryland, this 28th day
of February 2017.
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity, Chief,
Licensing Branch 4, Division of New Reactor
Licensing, Office of New Reactors.
[FR Doc. 2017–04455 Filed 3–6–17; 8:45 am]
BILLING CODE 7590–01–P
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 82, Number 43 (Tuesday, March 7, 2017)]
[Notices]
[Pages 12856-12857]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-04455]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc., Vogtle Electric
Generating Plant, Units 3 and 4; Column Line N Wall ITAAC Dimension
Change
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemption and combined license amendment; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an
exemption to allow a departure from the certification information of
Tier 1 of the generic design control document (DCD) and is issuing
License Amendment No. 59 to Combined Licenses (COL), NPF-91 and NPF-92.
The COLs were issued to Southern Nuclear Operating Company, Inc., and
Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM,
LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia,
and the City of Dalton, Georgia (the licensee); for construction and
operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4,
located in Burke County, Georgia.
The granting of the exemption allows the changes to Tier 1
information asked for in the amendment. Because the acceptability of
the exemption was determined in part by the acceptability of the
amendment, the exemption and amendment are being issued concurrently.
DATES: The exemption and amendment were issued on December 16, 2016.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document. The request for the amendment and exemption was submitted by
letter dated May 17, 2016, and available in ADAMS under Accession No.
ML16138A431.
NRC's PDR: You may examine and purchase copies of public
documents at
[[Page 12857]]
the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3025; email: Chandu.Patel@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is granting an exemption from Paragraph B of Section III,
``Scope and Contents,'' of appendix D, ``Design Certification Rule for
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations
(10 CFR), and issuing License Amendment No. 59 to COLs, NPF-91 and NPF-
92, to the licensee. The exemption is required by Paragraph A.4 of
Section VIII, ``Processes for Changes and Departures,'' appendix D, to
10 CFR part 52 to allow the licensee to depart from Tier 1 information.
With the requested amendment, the licensee sought proposed changes that
would revises COL Appendix C and plant-specific Tier 1, Table 3.3-1,
``Definition of Wall Thickness for Nuclear Island Buildings, Turbine
Building, and Annex Building,'' to change the tolerance for the
concrete wall thickness of the Column Line N from Column Lines 2 to 4
between elevation (EL.) 100'-0'' and EL.135'-3'' from 1
inch to a tolerance of -1 inch and +4 inches above grade. For the
remainder of the wall below grade, the concrete thickness tolerance
remains unchanged as currently specified in Note 2 of Tier 1, Table
3.3-1, +12 inches and -1 inch.
Part of the justification for granting the exemption was provided
by the review of the amendment. Because the exemption is necessary in
order to issue the requested license amendment, the NRC granted the
exemption and issued the amendment concurrently, rather than in
sequence. This included issuing a combined safety evaluation containing
the NRC staff's review of both the exemption request and the license
amendment. The exemption met all applicable regulatory criteria set
forth in 10 CFR 50.12, 10 CFR 52.7, and Section VIII.A.4 of appendix D
to 10 CFR part 52. The license amendment was found to be acceptable as
well. The combined safety evaluation is available in ADAMS under
Accession No. ML16315A426.
Identical exemption documents (except for referenced unit numbers
and license numbers) were issued to the licensee for VEGP Units 3 and 4
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and
4 can be found in ADAMS under Accession Nos. ML16315A139 and
ML16315A140, respectively. The exemption is reproduced (with the
exception of abbreviated titles and additional citations) in Section II
of this document. The amendment documents for COLs NPF-91 and NPF-92
are available in ADAMS under Accession Nos. ML16315A145 and
ML16315A416, respectively. A summary of the amendment documents is
provided in Section III of this document.
II. Exemption
Reproduced below is the exemption document issued to VEGP Units 3
and Unit 4. It makes reference to the combined safety evaluation that
provides the reasoning for the findings made by the NRC (and listed
under Item 1) in order to grant the exemption:
1. In a letter dated May 17, 2016, the licensee requested from the
Commission an exemption to allow departures from Tier 1 information in
the certified DCD incorporated by reference in 10 CFR part 52, appendix
D, as part of license amendment request 16-003, ``Column Line N Wall
ITAAC Dimension Change.''
For the reasons set forth in Section 3.1 of the NRC staff's Safety
Evaluation, which can be found in ADAMS under Accession No.
ML16315A426, the Commission finds that:
A. The exemption is authorized by law;
B. the exemption presents no undue risk to public health and
safety;
C. the exemption is consistent with the common defense and
security;
D. special circumstances are present in that the application of the
rule in this circumstance is not necessary to serve the underlying
purpose of the rule;
E. the special circumstances outweigh any decrease in safety that
may result from the reduction in standardization caused by the
exemption; and
F. the exemption will not result in a significant decrease in the
level of safety otherwise provided by the design.
2. Accordingly, the licensee is granted an exemption from the
certified DCD Tier 1 information, with corresponding changes to
Appendix C of the Facility Combined License as described in the
licensee's request dated May 17, 2016. This exemption is related to,
and necessary for the granting of License Amendment No. 59, which is
being issued concurrently with this exemption.
3. As explained in Section 5.0 of the NRC staff's Safety Evaluation
(ADAMS Accession No. ML16315A426), this exemption meets the eligibility
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment needs to be prepared in
connection with the issuance of the exemption.
4. This exemption is effective as of the date of its issuance.
III. License Amendment Request
By letter dated May 17, 2016 (ADAMS Accession No. ML16138A431), the
licensee requested that the NRC amend the COLs for VEGP, Units 3 and 4,
COLs NPF-91 and NPF-92. The proposed amendment is described in Section
I of this Federal Register notice.
The Commission has determined for these amendments that the
application complies with the standards and requirements of the Atomic
Energy Act of 1954, as amended (the Act), and the Commission's rules
and regulations. The Commission has made appropriate findings as
required by the Act and the Commission's rules and regulations in 10
CFR chapter I, which are set forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or COL, as applicable, proposed no significant
hazards consideration determination, and opportunity for a hearing in
connection with these actions, was published in the Federal Register on
July 19, 2016 (81 FR 46958). No comments were received during the 30-
day comment period.
The Commission has determined that these amendments satisfy the
criteria for categorical exclusion in accordance with 10 CFR 51.22.
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the combined safety evaluation, the
staff granted the exemption and issued the amendment that the licensee
requested on May 17, 2016. The exemption and amendment were issued on
December 16, 2016, as part of a combined package to the licensee (ADAMS
Accession No. ML16315A113).
Dated at Rockville, Maryland, this 28th day of February 2017.
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity, Chief,
Licensing Branch 4, Division of New Reactor Licensing, Office of New
Reactors.
[FR Doc. 2017-04455 Filed 3-6-17; 8:45 am]
BILLING CODE 7590-01-P