Combined Notice of Filings #1, 12810-12811 [2017-04409]
Download as PDF
12810
Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................
Commission issues EA ...............................................................................................................................................................
Comments on EA or EIS .............................................................................................................................................................
Modified terms and conditions ....................................................................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in § 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: March 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–04376 Filed 3–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1959–006;
ER15–2014–003; ER15–2013–005;
ER15–2020–004; ER15–2018–003;
ER15–2022–003; ER15–2026–003;
ER17–105–002; ER17–104–002; ER17–
556–001; ER10–2432–012; ER10–2435–
012; ER10–2440–010; ER10–71–004;
ER10–2444–012; ER10–2446–010;
VerDate Sep<11>2014
16:01 Mar 06, 2017
Jkt 241001
ER10–2449–010; ER13–2308–005;
ER12–2510–007; ER12–2512–007;
ER12–2513–007; ER10–3286–011;
ER10–3299–010; ER10–3310–012;
ER11–2489–009; ER12–726–007; ER12–
2639–007; ER11–3620–010; ER12–1431–
008; ER12–1434–008; ER12–1432–008;
ER12–1435–008; ER13–2102–006;
ER14–1439–006; ER15–1019–005;
ER10–2628–005; ER11–3959–007.
Applicants: Lower Mount Bethel
Energy, LLC, Brunner Island, LLC, Talen
Energy Marketing, LLC, Talen Montana,
LLC, Martins Creek, LLC, Montour, LLC,
Susquehanna Nuclear, LLC, Broadview
Energy JN, LLC, Broadview Energy KW,
LLC, Grady Wind Energy Center, LLC,
Bayonne Plant Holding, L.L.C., Camden
Plant Holding, L.L.C., Dartmouth Power
Associates Limited Partnership,
Elmwood Park Power, LLC, Newark Bay
Cogeneration Partnership, L.P.,
Pedricktown Cogeneration Company LP,
York Generation Company LLC,
Sapphire Power Marketing LLC,
Brandon Shores LLC, H.A. Wagner LLC,
Raven Power Marketing LLC,
Millennium Power Partners, LP, New
Athens Generating Company, LLC, New
Harquahala Generating Company, LLC,
Hatchet Ridge Wind, LLC, Spring Valley
Wind LLC, Ocotillo Express LLC,
Lyonsdale Biomass, LLC, ReEnergy
Ashland LLC, ReEnergy Fort Fairfield
LLC, ReEnergy Livermore Falls LLC,
ReEnergy Stratton LLC, ReEnergy Black
River LLC, TrailStone Power, LLC,
Fowler Ridge IV Wind Farm LLC, Lost
Creek Wind, LLC, Post Rock Wind
Power Project, LLC.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
April, 2017.
September, 2017.
October, 2017.
December, 2017.
Description: Notice of Non-Material
Change in Status of the Riverstone MBR
Entities.
Filed Date: 2/27/17.
Accession Number: 20170227–5242.
Comments Due: 5 p.m. ET 3/20/17.
Docket Numbers: ER16–2100–001;
ER16–2101–001.
Applicants: Gila River Power LLC.
Description: Second Supplement to
June 30, 2016 and October 3, 2016
Updated Market Power Analysis for
Southwest Region of Gila River Power
LLC, et. al.
Filed Date: 2/28/17.
Accession Number: 20170228–5360.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–468–002.
Applicants: Ohio Valley Electric
Corporation.
Description: Compliance filing: Errata
to December 1 Amendment Filing to be
effective 10/14/2016.
Filed Date: 2/28/17.
Accession Number: 20170228–5246.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–1057–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OA Sched 1, sec 7.9 and
OATT Att K-Appx, sect 7.9 RE Residual
ARR to be effective 5/1/2017.
Filed Date: 2/28/17.
Accession Number: 20170228–5235.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–1060–000.
Applicants: Public Service Company
of Colorado.
E:\FR\FM\07MRN1.SGM
07MRN1
Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices
Description: § 205(d) Rate Filing:
PSCo-TSGT–JM Shafer IA 114 0.1.0 to
be effective 2/28/2017.
Filed Date: 2/28/17.
Accession Number: 20170228–5248.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–1061–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2017–02–28_Submittal of pro forma
Pseudo-Tie Agreement & assoc. tariff
revisions to be effective 3/15/2017.
Filed Date: 2/28/17.
Accession Number: 20170228–5287.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–1063–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Queue Position AB2–057, Original
Service Agreement No. 4648 to be
effective 1/31/2017.
Filed Date: 3/1/17.
Accession Number: 20170301–5087.
Comments Due: 5 p.m. ET 3/22/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
sradovich on DSK3GMQ082PROD with NOTICES
[FR Doc. 2017–04409 Filed 3–6–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:01 Mar 06, 2017
Jkt 241001
participate in the Commission’s
proceedings.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–62–000]
Gulf South Pipeline Company, LP;
Notice of Intent To Prepare a
Supplemental Environmental
Assessment for the Amended Coastal
Bend Header Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the amendment to the Coastal Bend
Header Project (Project) involving
construction and operation of facilities
by Gulf South Pipeline Company, LP
(Gulf South) in southeastern Texas. The
Commission will use this EA in its
decision-making process to determine
whether the amendment to the Project is
in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
Your input during the scoping process
will help the Commission staff
determine what issues need to be
evaluated in the EA. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Please
note that the scoping period will close
on March 31, 2017.
Further details on how to submit
written comments are in the Public
Participation section of this notice. If
you sent comments on this project to the
Commission before the opening of this
docket on November 5, 2014, you will
need to file those comments in Docket
No. CP17–62–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this Project and includes
landowners affected by the amended
Project. State and local government
officials are asked to notify their
constituents of this planned Project and
encourage them to comment on their
areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility on My Land? What Do I Need
to Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
12811
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the Project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or minimize environmental
impacts. The more specific your
comments, the more useful they will be.
To ensure that your comments are
timely and properly recorded, please
send your comments so the Commission
receives them in Washington, DC on or
before March 31, 2017.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the Project
docket number (CP17–62–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
1. You can file your comments
electronically using the eComment
feature located on the Commission’s
Web site (www.ferc.gov) under the link
to Documents and Filings. This is an
easy method for interested persons to
submit brief, text-only comments on a
project;
2. You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
3. You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Summary of the Planned Project and
Proposed Amendment
On June 12, 2015, Gulf South Pipeline
Company, LP (Gulf South) filed an
application with the FERC for the
Coastal Bend Header Project (Project),
pursuant to Section 7(c) of the Natural
Gas Act and Part 157 of the
Commission’s regulations for a
Certificate of Public Convenience and
Necessity (Certificate) in Docket No.
CP15–517–000. The EA for the Project
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 82, Number 43 (Tuesday, March 7, 2017)]
[Notices]
[Pages 12810-12811]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-04409]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1959-006; ER15-2014-003; ER15-2013-005; ER15-
2020-004; ER15-2018-003; ER15-2022-003; ER15-2026-003; ER17-105-002;
ER17-104-002; ER17-556-001; ER10-2432-012; ER10-2435-012; ER10-2440-
010; ER10-71-004; ER10-2444-012; ER10-2446-010; ER10-2449-010; ER13-
2308-005; ER12-2510-007; ER12-2512-007; ER12-2513-007; ER10-3286-011;
ER10-3299-010; ER10-3310-012; ER11-2489-009; ER12-726-007; ER12-2639-
007; ER11-3620-010; ER12-1431-008; ER12-1434-008; ER12-1432-008; ER12-
1435-008; ER13-2102-006; ER14-1439-006; ER15-1019-005; ER10-2628-005;
ER11-3959-007.
Applicants: Lower Mount Bethel Energy, LLC, Brunner Island, LLC,
Talen Energy Marketing, LLC, Talen Montana, LLC, Martins Creek, LLC,
Montour, LLC, Susquehanna Nuclear, LLC, Broadview Energy JN, LLC,
Broadview Energy KW, LLC, Grady Wind Energy Center, LLC, Bayonne Plant
Holding, L.L.C., Camden Plant Holding, L.L.C., Dartmouth Power
Associates Limited Partnership, Elmwood Park Power, LLC, Newark Bay
Cogeneration Partnership, L.P., Pedricktown Cogeneration Company LP,
York Generation Company LLC, Sapphire Power Marketing LLC, Brandon
Shores LLC, H.A. Wagner LLC, Raven Power Marketing LLC, Millennium
Power Partners, LP, New Athens Generating Company, LLC, New Harquahala
Generating Company, LLC, Hatchet Ridge Wind, LLC, Spring Valley Wind
LLC, Ocotillo Express LLC, Lyonsdale Biomass, LLC, ReEnergy Ashland
LLC, ReEnergy Fort Fairfield LLC, ReEnergy Livermore Falls LLC,
ReEnergy Stratton LLC, ReEnergy Black River LLC, TrailStone Power, LLC,
Fowler Ridge IV Wind Farm LLC, Lost Creek Wind, LLC, Post Rock Wind
Power Project, LLC.
Description: Notice of Non-Material Change in Status of the
Riverstone MBR Entities.
Filed Date: 2/27/17.
Accession Number: 20170227-5242.
Comments Due: 5 p.m. ET 3/20/17.
Docket Numbers: ER16-2100-001; ER16-2101-001.
Applicants: Gila River Power LLC.
Description: Second Supplement to June 30, 2016 and October 3, 2016
Updated Market Power Analysis for Southwest Region of Gila River Power
LLC, et. al.
Filed Date: 2/28/17.
Accession Number: 20170228-5360.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17-468-002.
Applicants: Ohio Valley Electric Corporation.
Description: Compliance filing: Errata to December 1 Amendment
Filing to be effective 10/14/2016.
Filed Date: 2/28/17.
Accession Number: 20170228-5246.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17-1057-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OA Sched 1, sec
7.9 and OATT Att K-Appx, sect 7.9 RE Residual ARR to be effective 5/1/
2017.
Filed Date: 2/28/17.
Accession Number: 20170228-5235.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17-1060-000.
Applicants: Public Service Company of Colorado.
[[Page 12811]]
Description: Sec. 205(d) Rate Filing: PSCo-TSGT-JM Shafer IA 114
0.1.0 to be effective 2/28/2017.
Filed Date: 2/28/17.
Accession Number: 20170228-5248.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17-1061-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2017-02-28_Submittal of pro
forma Pseudo-Tie Agreement & assoc. tariff revisions to be effective 3/
15/2017.
Filed Date: 2/28/17.
Accession Number: 20170228-5287.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17-1063-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Queue Position AB2-057,
Original Service Agreement No. 4648 to be effective 1/31/2017.
Filed Date: 3/1/17.
Accession Number: 20170301-5087.
Comments Due: 5 p.m. ET 3/22/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 1, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-04409 Filed 3-6-17; 8:45 am]
BILLING CODE 6717-01-P