Wisconsin Public Service Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 12809-12810 [2017-04376]
Download as PDF
Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices
12809
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................
Commission issues EA ...............................................................................................................................................................
Comments on EA ........................................................................................................................................................................
Modified terms and conditions ....................................................................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: March 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–04375 Filed 3–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1966–054]
sradovich on DSK3GMQ082PROD with NOTICES
Wisconsin Public Service Corporation;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major New
License.
b. Project No.: 1966–054.
c. Date filed: March 28, 2016.
d. Applicant: Wisconsin Public
Service Corporation.
e. Name of Project: Grandfather Falls
Hydroelectric Project.
f. Location: The existing project is
located on the Wisconsin River in
Lincoln County, Wisconsin. The project
does affect federal lands. There are nonreservation federal lands within the
Project Boundary. One Bureau of Land
Management (BLM)-owned island (0.1
acres) is located in the tailrace of the
project boundary.
VerDate Sep<11>2014
16:01 Mar 06, 2017
Jkt 241001
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Todd
Jastremski, Asset Manager Hydro
Operations, We Energies, 800 Industrial
Park Drive, Iron Mountain, MI 49801,
Telephone (906) 779–4099.
i. FERC Contact: Lee Emery,
Telephone (202) 502–8379, and email
lee.emery@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–1966–054.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
April, 2017.
September, 2017.
October, 2017.
December, 2017.
l. The existing Grandfather Falls
Hydroelectric Project consists of: (1) A
36-foot-high and 762-foot-long
reinforced concrete dam consisting of a
52-foot-long masonry retaining wall, a
263-foot-long concrete spillway section,
a 147-foot-long non-overflow masonry
dam, and a 300-foot-long rockfill
embankment; (2) a 108-foot-long, 12foot-wide timber (concrete pier
supported) canal bridge that crosses the
upstream end of the canal, three intake
canal embankments totaling 3,400 feet
in length, a 4,000-foot-long, 300-footwide intake canal, and a 55.5-foot-wide
intake structure; (3) an existing 340-acre
reservoir at elevation 1,397.1 National
Geodetic Vertical Datum (NGVD) and a
gross storage capacity of 2,200 acre-feet
with the pool elevation maintained
between 1,396.1 and 1,397.1 feet NGVD;
(4) two 55.5-foot-wide, 30.5-foot-high
trashracks with clear bar spacing of 2.5
inches; (5) an 11-foot-diameter, 1,317foot-long wood-stave penstock that
transitions into a 30-foot-long steel
penstock and a 13.5-foot-diameter
1,310-foot-long wood-stave penstock
that transitions into a 30-foot-long steel
penstock; (6) a 51-foot-diameter surge
tank with a 37.87-foot-high internal riser
and a 39-foot-diameter surge tank with
a 33.43-foot-high internal riser that are
connected to the steel portion of the
penstocks; (7) a 67-foot-wide, 53-footlong, 46-foot-high concrete and masonry
powerhouse containing two generating
units with a total installed capacity of
17.24 megawatts (MW); (8) a 50-footlong, 60-foot-wide bedrock excavated
tailrace; (9) a 300-foot-long, 46 kilovolt
overhead transmission power line; and
(10) appurtenant facilities. The project
is estimated to generate an average of
72,031.72 megawatt-hours annually.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
E:\FR\FM\07MRN1.SGM
07MRN1
12810
Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................
Commission issues EA ...............................................................................................................................................................
Comments on EA or EIS .............................................................................................................................................................
Modified terms and conditions ....................................................................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in § 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: March 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–04376 Filed 3–6–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1959–006;
ER15–2014–003; ER15–2013–005;
ER15–2020–004; ER15–2018–003;
ER15–2022–003; ER15–2026–003;
ER17–105–002; ER17–104–002; ER17–
556–001; ER10–2432–012; ER10–2435–
012; ER10–2440–010; ER10–71–004;
ER10–2444–012; ER10–2446–010;
VerDate Sep<11>2014
16:01 Mar 06, 2017
Jkt 241001
ER10–2449–010; ER13–2308–005;
ER12–2510–007; ER12–2512–007;
ER12–2513–007; ER10–3286–011;
ER10–3299–010; ER10–3310–012;
ER11–2489–009; ER12–726–007; ER12–
2639–007; ER11–3620–010; ER12–1431–
008; ER12–1434–008; ER12–1432–008;
ER12–1435–008; ER13–2102–006;
ER14–1439–006; ER15–1019–005;
ER10–2628–005; ER11–3959–007.
Applicants: Lower Mount Bethel
Energy, LLC, Brunner Island, LLC, Talen
Energy Marketing, LLC, Talen Montana,
LLC, Martins Creek, LLC, Montour, LLC,
Susquehanna Nuclear, LLC, Broadview
Energy JN, LLC, Broadview Energy KW,
LLC, Grady Wind Energy Center, LLC,
Bayonne Plant Holding, L.L.C., Camden
Plant Holding, L.L.C., Dartmouth Power
Associates Limited Partnership,
Elmwood Park Power, LLC, Newark Bay
Cogeneration Partnership, L.P.,
Pedricktown Cogeneration Company LP,
York Generation Company LLC,
Sapphire Power Marketing LLC,
Brandon Shores LLC, H.A. Wagner LLC,
Raven Power Marketing LLC,
Millennium Power Partners, LP, New
Athens Generating Company, LLC, New
Harquahala Generating Company, LLC,
Hatchet Ridge Wind, LLC, Spring Valley
Wind LLC, Ocotillo Express LLC,
Lyonsdale Biomass, LLC, ReEnergy
Ashland LLC, ReEnergy Fort Fairfield
LLC, ReEnergy Livermore Falls LLC,
ReEnergy Stratton LLC, ReEnergy Black
River LLC, TrailStone Power, LLC,
Fowler Ridge IV Wind Farm LLC, Lost
Creek Wind, LLC, Post Rock Wind
Power Project, LLC.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
April, 2017.
September, 2017.
October, 2017.
December, 2017.
Description: Notice of Non-Material
Change in Status of the Riverstone MBR
Entities.
Filed Date: 2/27/17.
Accession Number: 20170227–5242.
Comments Due: 5 p.m. ET 3/20/17.
Docket Numbers: ER16–2100–001;
ER16–2101–001.
Applicants: Gila River Power LLC.
Description: Second Supplement to
June 30, 2016 and October 3, 2016
Updated Market Power Analysis for
Southwest Region of Gila River Power
LLC, et. al.
Filed Date: 2/28/17.
Accession Number: 20170228–5360.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–468–002.
Applicants: Ohio Valley Electric
Corporation.
Description: Compliance filing: Errata
to December 1 Amendment Filing to be
effective 10/14/2016.
Filed Date: 2/28/17.
Accession Number: 20170228–5246.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–1057–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OA Sched 1, sec 7.9 and
OATT Att K-Appx, sect 7.9 RE Residual
ARR to be effective 5/1/2017.
Filed Date: 2/28/17.
Accession Number: 20170228–5235.
Comments Due: 5 p.m. ET 3/21/17.
Docket Numbers: ER17–1060–000.
Applicants: Public Service Company
of Colorado.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 82, Number 43 (Tuesday, March 7, 2017)]
[Notices]
[Pages 12809-12810]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-04376]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1966-054]
Wisconsin Public Service Corporation; Notice of Application
Accepted for Filing, Soliciting Motions To Intervene and Protests,
Ready for Environmental Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major New License.
b. Project No.: 1966-054.
c. Date filed: March 28, 2016.
d. Applicant: Wisconsin Public Service Corporation.
e. Name of Project: Grandfather Falls Hydroelectric Project.
f. Location: The existing project is located on the Wisconsin River
in Lincoln County, Wisconsin. The project does affect federal lands.
There are non-reservation federal lands within the Project Boundary.
One Bureau of Land Management (BLM)-owned island (0.1 acres) is located
in the tailrace of the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Todd Jastremski, Asset Manager Hydro
Operations, We Energies, 800 Industrial Park Drive, Iron Mountain, MI
49801, Telephone (906) 779-4099.
i. FERC Contact: Lee Emery, Telephone (202) 502-8379, and email
lee.emery@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, preliminary terms and conditions, and preliminary
prescriptions: 60 days from the issuance date of this notice; reply
comments are due 105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, preliminary
terms and conditions, and preliminary fishway prescriptions using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-1966-054.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The existing Grandfather Falls Hydroelectric Project consists
of: (1) A 36-foot-high and 762-foot-long reinforced concrete dam
consisting of a 52-foot-long masonry retaining wall, a 263-foot-long
concrete spillway section, a 147-foot-long non-overflow masonry dam,
and a 300-foot-long rockfill embankment; (2) a 108-foot-long, 12-foot-
wide timber (concrete pier supported) canal bridge that crosses the
upstream end of the canal, three intake canal embankments totaling
3,400 feet in length, a 4,000-foot-long, 300-foot-wide intake canal,
and a 55.5-foot-wide intake structure; (3) an existing 340-acre
reservoir at elevation 1,397.1 National Geodetic Vertical Datum (NGVD)
and a gross storage capacity of 2,200 acre-feet with the pool elevation
maintained between 1,396.1 and 1,397.1 feet NGVD; (4) two 55.5-foot-
wide, 30.5-foot-high trashracks with clear bar spacing of 2.5 inches;
(5) an 11-foot-diameter, 1,317-foot-long wood-stave penstock that
transitions into a 30-foot-long steel penstock and a 13.5-foot-diameter
1,310-foot-long wood-stave penstock that transitions into a 30-foot-
long steel penstock; (6) a 51-foot-diameter surge tank with a 37.87-
foot-high internal riser and a 39-foot-diameter surge tank with a
33.43-foot-high internal riser that are connected to the steel portion
of the penstocks; (7) a 67-foot-wide, 53-foot-long, 46-foot-high
concrete and masonry powerhouse containing two generating units with a
total installed capacity of 17.24 megawatts (MW); (8) a 50-foot-long,
60-foot-wide bedrock excavated tailrace; (9) a 300-foot-long, 46
kilovolt overhead transmission power line; and (10) appurtenant
facilities. The project is estimated to generate an average of
72,031.72 megawatt-hours annually.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
[[Page 12810]]
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
o. Procedural Schedule: The application will be processed according
to the following revised Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of recommendations, April, 2017.
preliminary terms and conditions,
and preliminary fishway
prescriptions.
Commission issues EA................. September, 2017.
Comments on EA or EIS................ October, 2017.
Modified terms and conditions........ December, 2017.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
q. A license applicant must file no later than 60 days following
the date of issuance of the notice of acceptance and ready for
environmental analysis provided for in Sec. 5.22: (1) A copy of the
water quality certification; (2) a copy of the request for
certification, including proof of the date on which the certifying
agency received the request; or (3) evidence of waiver of water quality
certification.
Dated: March 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-04376 Filed 3-6-17; 8:45 am]
BILLING CODE 6717-01-P