Download as PDF asabaliauskas on DSK3SPTVN1PROD with NOTICES 12578 Federal Register / Vol. 82, No. 42 / Monday, March 6, 2017 / Notices 3 of the Natural Gas Act (NGA), and part 153 of the Commission’s regulations requesting authorization to transfer the NGA section 3 Authorization and Presidential Permit issued to Bakken Hunter, LLC on April 24, 2014 in Docket No. CP14-24-000 to Steppe Petroleum USA Inc. This authorization would transfer to Steppe Petroleum USA Inc. the authorization to operate and maintain natural gas pipeline facilities at a point on the International Boundary between the United States of America and Canada in the vicinity of Divide County, North Dakota, and to transfer to Steppe Petroleum USA Inc. the permit to construct, operate and maintain the border crossing facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Any questions regarding this application should be directed to Shaun Robinson, P. Eng, Senior Project Engineer, Polaris Engineering, Ltd. 200, 1120—29th Avenue NE., Calgary, AB, Canada, T2E 7P1 or by calling (403) 736–8024 (telephone) or (403) 263–1387 (fax) shaun.robertson@polariseng.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to VerDate Sep<11>2014 19:24 Mar 03, 2017 Jkt 241001 obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 5 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: March 17, 2017. Dated: February 24, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–04217 Filed 3–3–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–1058–000; EL16–56–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.19a(b): Refund Report to be effective N/A. Filed Date: 2/22/17. Accession Number: 20170222–5113. Comments Due: 5 p.m. ET 3/15/17. Docket Numbers: ER16–791–001. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Compliance Filing in ER16–791— Settlement Revenue Distribution Mechanism to be effective 2/1/2016. Filed Date: 2/22/17. Accession Number: 20170222–5054. Comments Due: 5 p.m. ET 3/15/17. Docket Numbers: ER17–1008–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Golden Oasis Project SA No. 188 to be effective 2/23/2017. Filed Date: 2/22/17. Accession Number: 20170222–5091. Comments Due: 5 p.m. ET 3/15/17. Docket Numbers: ER17–1009–000. E:\FR\FM\06MRN1.SGM 06MRN1 asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 82, No. 42 / Monday, March 6, 2017 / Notices Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to Service Agreement No. 2934 re: Change of Contact Info to be effective 10/5/2014. Filed Date: 2/22/17. Accession Number: 20170222–5107. Comments Due: 5 p.m. ET 3/15/17. Docket Numbers: ER17–1010–000. Applicants: Power Authority of the State of New York, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: NYPA 205 depreciation rate to comply with settlement to be effective 3/1/2017. Filed Date: 2/22/17. Accession Number: 20170222–5109. Comments Due: 5 p.m. ET 3/15/17. Docket Numbers: ER17–1011–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original Service Agreement No. 4626; Queue No. AA1–135 to be effective 1/ 23/2017. Filed Date: 2/22/17. Accession Number: 20170222–5127. Comments Due: 5 p.m. ET 3/15/17. Docket Numbers: ER17–1012–000. Applicants: Arizona Public Service Company. Description: Tariff Cancellation: Cancellation of Interconnection Operating, Service Agreement No. 174 to be effective 4/24/2017. Filed Date: 2/22/17. Accession Number: 20170222–5130. Comments Due: 5 p.m. ET 3/15/17. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR15–2–005. Applicants: North American Electric Reliability Corporation. Description: 2016 ERO Enterprise Annual CMEP Report and Petition. Filed Date: 2/21/17. Accession Number: 20170221–5264. Comments Due: 5 p.m. ET 3/14/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, VerDate Sep<11>2014 19:24 Mar 03, 2017 Jkt 241001 service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 12579 Comments Due: 5 p.m. ET 3/21/17. Docket Numbers: ER17–1049–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Dated: February 22, 2017. ATSI and MAIT submit Interconnection Nathaniel J. Davis, Sr., Agreement SA No. 4576 to be effective Deputy Secretary. 2/1/2017. [FR Doc. 2017–04211 Filed 3–3–17; 8:45 am] Filed Date: 2/28/17. BILLING CODE 6717–01–P Accession Number: 20170228–5105. Comments Due: 5 p.m. ET 3/21/17. Docket Numbers: ER17–1050–000. DEPARTMENT OF ENERGY Applicants: Consolidated Edison Company of New York, Inc. Federal Energy Regulatory Description: § 205(d) Rate Filing: WDS Commission Tariff change RY 1 to be effective 5/1/ 2017. Combined Notice of Filings #2 Filed Date: 2/28/17. Take notice that the Commission Accession Number: 20170228–5109. received the following electric rate Comments Due: 5 p.m. ET 3/21/17. filings: Docket Numbers: ER17–1051–000. Docket Numbers: ER17–107–001. Applicants: AEP Texas Inc. Applicants: Southwest Power Pool, Description: Baseline eTariff Filing: Inc. AEP Texas Inc. RS and SA Tariff Description: Compliance filing: Database to be effective 3/1/2017. Compliance Filing in ER17–107— Filed Date: 2/28/17. Orders 827 and 828 to be effective 9/21/ Accession Number: 20170228–5143. 2016. Comments Due: 5 p.m. ET 3/21/17. Filed Date: 2/28/17. Docket Numbers: ER17–1052–000. Accession Number: 20170228–5220. Applicants: AEP Texas Inc. Comments Due: 5 p.m. ET 3/21/17. Description: § 205(d) Rate Filing: AEP Docket Numbers: ER17–787–001. TX-SolaireHolman 1 Interconnection Applicants: Southern California Agreement to be effective 3/1/2017. Edison Company. Filed Date: 2/28/17. Description: Tariff Amendment: Accession Number: 20170228–5161. Request for Deferral of Action—Notice Comments Due: 5 p.m. ET 3/21/17. of Cancellation Ecos Energy, LLC to be Docket Numbers: ER17–1053–000. effective 12/31/9998. Applicants: ITC Midwest LLC. Filed Date: 2/28/17. Description: § 205(d) Rate Filing: Accession Number: 20170228–5103. Filing of CIAC Agreement with IP&L to Comments Due: 5 p.m. ET 3/21/17. be effective 5/1/2017. Docket Numbers: ER17–808–001. Filed Date: 2/28/17. Applicants: Clearview Electric, Inc. Accession Number: 20170228–5197. Description: Tariff Amendment: Comments Due: 5 p.m. ET 3/21/17. Amendment to Application for MBR to Docket Numbers: ER17–1054–000. be effective 1/23/2017. Applicants: PSEG Energy Resources & Filed Date: 2/28/17. Trade LLC. Accession Number: 20170228–5214. Description: § 205(d) Rate Filing: Comments Due: 5 p.m. ET 3/21/17. Cancellation of certain tariff records to Docket Numbers: ER17–913–001. be effective 2/28/2017. Filed Date: 2/28/17. Applicants: Consolidated Edison Accession Number: 20170228–5205. Company of New York, Inc. Comments Due: 5 p.m. ET 3/21/17. Description: Tariff Amendment: Amendment PASNY RY 1 filing to be Docket Numbers: ER17–1055–000. effective 2/1/2017. Applicants: Northern States Power Filed Date: 2/28/17. Company, a Minnesota corporation. Accession Number: 20170228–5098. Description: Notice of Cancellation of Comments Due: 5 p.m. ET 3/21/17. Interconnection Agreement Rate Schedule No. 496 of Northern States Docket Numbers: ER17–934–001. Power Company, a Minnesota Applicants: PJM Interconnection, corporation. L.L.C. Filed Date: 2/28/17. Description: Tariff Amendment: Errata Accession Number: 20170228–5212. to 2/3/17 Filing of Revisions to MISO– Comments Due: 5 p.m. ET 3/21/17. PJM JOA re CTS Eff Date to be effective 10/3/2017. Docket Numbers: ER17–1056–000. Applicants: Public Service Company Filed Date: 2/28/17. Accession Number: 20170228–5225. of Colorado. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\06MRN1.SGM 06MRN1

Agencies

[Federal Register Volume 82, Number 42 (Monday, March 6, 2017)]
[Notices]
[Pages 12578-12579]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-04211]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER16-1058-000; EL16-56-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Midcontinent Independent System Operator, Inc. submits 
tariff filing per 35.19a(b): Refund Report to be effective N/A.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5113.
    Comments Due: 5 p.m. ET 3/15/17.

    Docket Numbers: ER16-791-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Compliance filing: Compliance Filing in ER16-791--
Settlement Revenue Distribution Mechanism to be effective 2/1/2016.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5054.
    Comments Due: 5 p.m. ET 3/15/17.

    Docket Numbers: ER17-1008-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: LGIA Golden Oasis Project SA 
No. 188 to be effective 2/23/2017.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5091.
    Comments Due: 5 p.m. ET 3/15/17.

    Docket Numbers: ER17-1009-000.

[[Page 12579]]

    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to Service 
Agreement No. 2934 re: Change of Contact Info to be effective 10/5/
2014.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5107.
    Comments Due: 5 p.m. ET 3/15/17.

    Docket Numbers: ER17-1010-000.
    Applicants: Power Authority of the State of New York, New York 
Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: NYPA 205 depreciation rate 
to comply with settlement to be effective 3/1/2017.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5109.
    Comments Due: 5 p.m. ET 3/15/17.

    Docket Numbers: ER17-1011-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
No. 4626; Queue No. AA1-135 to be effective 1/23/2017.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5127.
    Comments Due: 5 p.m. ET 3/15/17.

    Docket Numbers: ER17-1012-000.
    Applicants: Arizona Public Service Company.
    Description: Tariff Cancellation: Cancellation of Interconnection 
Operating, Service Agreement No. 174 to be effective 4/24/2017.
    Filed Date: 2/22/17.
    Accession Number: 20170222-5130.
    Comments Due: 5 p.m. ET 3/15/17.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR15-2-005.
    Applicants: North American Electric Reliability Corporation.
    Description: 2016 ERO Enterprise Annual CMEP Report and Petition.
    Filed Date: 2/21/17.
    Accession Number: 20170221-5264.
    Comments Due: 5 p.m. ET 3/14/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: February 22, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-04211 Filed 3-3-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.