Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 11569-11570 [2017-03592]
Download as PDF
Federal Register / Vol. 82, No. 36 / Friday, February 24, 2017 / Notices
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03567 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–976–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment AQ Revisions Addressing
Non-Material Delivery Point Changes to
be effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5074.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–977–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA Oak Creek I Project SA Nos. 948–
949 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5078.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–978–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA Oak Creek II Project SA Nos.
946–947 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5079.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–979–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 4618, Queue
Position AB1–150 to be effective
1/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5118.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–980–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: § 205(d) Rate Filing:
AECS Updated Rate Schedule 2 to be
effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5126.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–981–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
WAPA NITSA Rev 5 to be effective
2/1/2017.
VerDate Sep<11>2014
17:20 Feb 23, 2017
Jkt 241001
Filed Date: 2/16/17.
Accession Number: 20170216–5145.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–982–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement Nos.
3086 and 4118, Queue No. M24 to Sch.
B, C, F to be effective 2/14/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5160.
Comments Due: 5 p.m. ET 3/9/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03564 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14824–000]
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Girard Estate Pumped Storage
Hydro Project to be located near Zerbe
Township in Northumberland County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
11569
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 90 acres and a
storage capacity of 1,350 acre-feet at a
surface elevation of approximately 1,400
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam;
(2) a new lower reservoir, including an
existing abandoned mine pit, with a
surface area of 25 acres and a storage
capacity of 1,620 acre-feet at a surface
elevation of 1,000 feet msl; (3) a new
2,242-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (4) a new 150-footlong, 50-foot-wide, 25-foot-high
powerhouse containing two turbinegenerator units with a total rated
capacity of 44 megawatts; (5) a new
10,000-foot-long transmission line
connecting the powerhouse to the
Sunbury-Eldred-Frackville 230-kilovolt
circuit owned by PPL Corporation; and
(6) appurtenant facilities. The proposed
project would have an annual
generation of 161,587 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 267–254–6107.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14824–000.
More information about this project,
including a copy of the application, can
E:\FR\FM\24FEN1.SGM
24FEN1
11570
Federal Register / Vol. 82, No. 36 / Friday, February 24, 2017 / Notices
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14824) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: February 17, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03592 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL17–48–000]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Consumers Energy Company; Notice
of Petition for Declaratory Order
Take notice that on February 16, 2017,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2),
Consumers Energy Company
(Consumers Energy) filed a petition
seeking to terminate a long-standing
controversy, and to remove uncertainty,
between Consumers Energy and
Michigan Electric Transmission
Company regarding the ownership of
Consumer Energy current transmission
assets, as more fully explained in the
petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
VerDate Sep<11>2014
17:20 Feb 23, 2017
Jkt 241001
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 20, 2017.
Dated: February 17, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03589 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC17–2–000]
Commission Information Collection
Activities (FERC–549D & FERC–733);
Comment Request
Federal Energy Regulatory
Commission, DOE.
ACTION: Comment request.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is submitting its
information collection [FERC–549D
(Quarterly Transportation and Storage
Report for Interstate Gas and Hinshaw
Pipelines) and FERC–733 (Demand
Response/Time-Based Rate Programs
and Advanced Metering)] to the Office
of Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (81 FR 91160, 12/16/
2016) requesting public comments. The
Commission received no comments on
SUMMARY:
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
neither the FERC–549D nor the FERC–
733 and is making this notation in its
submittal to OMB.
DATES: Comments on the collection of
information are due by March 27, 2017.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0253 (FERC–549D) and 1902–
0271 (FERC–733) should be sent via
email to the Office of Information and
Regulatory Affairs: oira_submission@
omb.gov. Attention: Federal Energy
Regulatory Commission Desk Officer.
The Desk Officer may also be reached
via telephone at 202–395–4718.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC17–2–000, by either of the
following methods:
• eFiling at Commission’s Web site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Type of Request: Three-year extension
of the information collection
requirements for all collections
described below with no changes to the
current reporting requirements. Please
note that each collection is distinct from
the next.
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collections; and (4) ways to
minimize the burden of the collections
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 82, Number 36 (Friday, February 24, 2017)]
[Notices]
[Pages 11569-11570]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03592]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14824-000]
Merchant Hydro Developers, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro Developers, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Girard Estate Pumped Storage Hydro Project to be located near Zerbe
Township in Northumberland County, Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) A new
upper reservoir with a surface area of 90 acres and a storage capacity
of 1,350 acre-feet at a surface elevation of approximately 1,400 feet
above mean sea level (msl) created through construction of a new
roller-compacted concrete or rock-filled dam; (2) a new lower
reservoir, including an existing abandoned mine pit, with a surface
area of 25 acres and a storage capacity of 1,620 acre-feet at a surface
elevation of 1,000 feet msl; (3) a new 2,242-foot-long, 48-inch-
diameter penstock connecting the upper and lower reservoirs; (4) a new
150-foot-long, 50-foot-wide, 25-foot-high powerhouse containing two
turbine-generator units with a total rated capacity of 44 megawatts;
(5) a new 10,000-foot-long transmission line connecting the powerhouse
to the Sunbury-Eldred-Frackville 230-kilovolt circuit owned by PPL
Corporation; and (6) appurtenant facilities. The proposed project would
have an annual generation of 161,587 megawatt-hours.
Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC,
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267-254-6107.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14824-000.
More information about this project, including a copy of the
application, can
[[Page 11570]]
be viewed or printed on the ``eLibrary'' link of Commission's Web site
at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-14824) in the docket number field to access the document. For
assistance, contact FERC Online Support.
Dated: February 17, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-03592 Filed 2-23-17; 8:45 am]
BILLING CODE 6717-01-P