John A. Dodson; Village of Highland Falls High-Point Utility, LDC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests, 11568-11569 [2017-03567]
Download as PDF
11568
Federal Register / Vol. 82, No. 36 / Friday, February 24, 2017 / Notices
asabaliauskas on DSK3SPTVN1PROD with NOTICES
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: March 10, 2017.
Dated: February 17, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. CP16–498–000; PF16–4–000 ]
[Project No. 7656–013]
Columbia Gas Transmission, LLC;
Notice of Revised Schedule for
Environmental Review of the B-System
Project
John A. Dodson; Village of Highland
Falls High-Point Utility, LDC; Notice of
Application for Transfer of License and
Soliciting Comments, Motions To
Intervene, and Protests
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental assessment (EA) for
Columbia Gas Transmission, LLC’s
(Columbia) B-System Project. The
original notice of schedule, issued on
December 20, 2016, identified March 13,
2017 as the EA issuance date. Due to
updated B-System Project information
filed by Columbia on February 7, 2017,
staff has revised the schedule for
issuance of the EA.
Schedule for Environmental Review
Issuance of EA—April 28, 2017
90-day Federal Authorization Decision
Deadline—July 27, 2017
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription
(https://www.ferc.gov/docs-filing/
esubscription.asp). Additional
information about the project may be
obtained by contacting the
Environmental Project Manager,
Kenneth Warn, by telephone at 202–
502–6859 or by electronic mail at
kenneth.warn@ferc.gov.
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03565 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2017–03591 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:20 Feb 23, 2017
Jkt 241001
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
On August 11, 2016, and
supplemented on November 28, 2016
and January 24, 2017, Mr. John A.
Dodson (transferor) and the Village of
Highland Falls High-Point Utility, LDC
(transferee) filed an application to
transfer the license for the Buttermilk
Falls Hydroelectric Project No. 7656.
The project is located on Buttermilk
Falls Brook in Orange County, New
York.
The above parties seek Commission
approval to transfer the license for the
project from the transferor to the
transferee.
Applicants’ Contact: For Transferor:
Mr. John A. Dodson, 27 Webb Lane,
Highland Falls, NY 10928, Phone: (914)
446–7704, Email: thayerenergy@
gmail.com. For Transferee: Mr. William
J. Florence, Jr., Village of Highland Falls
High-Point Utility, LDC, 303 Main
Street, Highland Falls, NY 10928,
Phone: (914) 737–7001, Email:
williamflorence@mac.com.
FERC Contact: Ashish Desai, (202)
502–8370, Ashish.Desai@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 days from
the issuance date of this notice by the
Commission. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–7656–013.
E:\FR\FM\24FEN1.SGM
24FEN1
Federal Register / Vol. 82, No. 36 / Friday, February 24, 2017 / Notices
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03567 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–976–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment AQ Revisions Addressing
Non-Material Delivery Point Changes to
be effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5074.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–977–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA Oak Creek I Project SA Nos. 948–
949 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5078.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–978–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA Oak Creek II Project SA Nos.
946–947 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5079.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–979–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 4618, Queue
Position AB1–150 to be effective
1/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5118.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–980–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: § 205(d) Rate Filing:
AECS Updated Rate Schedule 2 to be
effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5126.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–981–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
WAPA NITSA Rev 5 to be effective
2/1/2017.
VerDate Sep<11>2014
17:20 Feb 23, 2017
Jkt 241001
Filed Date: 2/16/17.
Accession Number: 20170216–5145.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–982–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement Nos.
3086 and 4118, Queue No. M24 to Sch.
B, C, F to be effective 2/14/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5160.
Comments Due: 5 p.m. ET 3/9/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03564 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14824–000]
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Girard Estate Pumped Storage
Hydro Project to be located near Zerbe
Township in Northumberland County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
11569
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 90 acres and a
storage capacity of 1,350 acre-feet at a
surface elevation of approximately 1,400
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam;
(2) a new lower reservoir, including an
existing abandoned mine pit, with a
surface area of 25 acres and a storage
capacity of 1,620 acre-feet at a surface
elevation of 1,000 feet msl; (3) a new
2,242-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (4) a new 150-footlong, 50-foot-wide, 25-foot-high
powerhouse containing two turbinegenerator units with a total rated
capacity of 44 megawatts; (5) a new
10,000-foot-long transmission line
connecting the powerhouse to the
Sunbury-Eldred-Frackville 230-kilovolt
circuit owned by PPL Corporation; and
(6) appurtenant facilities. The proposed
project would have an annual
generation of 161,587 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 267–254–6107.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14824–000.
More information about this project,
including a copy of the application, can
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 82, Number 36 (Friday, February 24, 2017)]
[Notices]
[Pages 11568-11569]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03567]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7656-013]
John A. Dodson; Village of Highland Falls High-Point Utility,
LDC; Notice of Application for Transfer of License and Soliciting
Comments, Motions To Intervene, and Protests
On August 11, 2016, and supplemented on November 28, 2016 and
January 24, 2017, Mr. John A. Dodson (transferor) and the Village of
Highland Falls High-Point Utility, LDC (transferee) filed an
application to transfer the license for the Buttermilk Falls
Hydroelectric Project No. 7656. The project is located on Buttermilk
Falls Brook in Orange County, New York.
The above parties seek Commission approval to transfer the license
for the project from the transferor to the transferee.
Applicants' Contact: For Transferor: Mr. John A. Dodson, 27 Webb
Lane, Highland Falls, NY 10928, Phone: (914) 446-7704, Email:
thayerenergy@gmail.com. For Transferee: Mr. William J. Florence, Jr.,
Village of Highland Falls High-Point Utility, LDC, 303 Main Street,
Highland Falls, NY 10928, Phone: (914) 737-7001, Email:
williamflorence@mac.com.
FERC Contact: Ashish Desai, (202) 502-8370, Ashish.Desai@ferc.gov.
Deadline for filing comments, motions to intervene, and protests:
30 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-7656-013.
[[Page 11569]]
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-03567 Filed 2-23-17; 8:45 am]
BILLING CODE 6717-01-P