Combined Notice of Filings #2, 11569 [2017-03564]
Download as PDF
Federal Register / Vol. 82, No. 36 / Friday, February 24, 2017 / Notices
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03567 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–976–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment AQ Revisions Addressing
Non-Material Delivery Point Changes to
be effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5074.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–977–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA Oak Creek I Project SA Nos. 948–
949 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5078.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–978–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA Oak Creek II Project SA Nos.
946–947 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5079.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–979–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 4618, Queue
Position AB1–150 to be effective
1/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5118.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–980–000.
Applicants: Alliant Energy Corporate
Services, Inc.
Description: § 205(d) Rate Filing:
AECS Updated Rate Schedule 2 to be
effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5126.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–981–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
WAPA NITSA Rev 5 to be effective
2/1/2017.
VerDate Sep<11>2014
17:20 Feb 23, 2017
Jkt 241001
Filed Date: 2/16/17.
Accession Number: 20170216–5145.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17–982–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement Nos.
3086 and 4118, Queue No. M24 to Sch.
B, C, F to be effective 2/14/2017.
Filed Date: 2/16/17.
Accession Number: 20170216–5160.
Comments Due: 5 p.m. ET 3/9/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03564 Filed 2–23–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14824–000]
Merchant Hydro Developers, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 18, 2017, Merchant Hydro
Developers, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Girard Estate Pumped Storage
Hydro Project to be located near Zerbe
Township in Northumberland County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
11569
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new upper reservoir
with a surface area of 90 acres and a
storage capacity of 1,350 acre-feet at a
surface elevation of approximately 1,400
feet above mean sea level (msl) created
through construction of a new rollercompacted concrete or rock-filled dam;
(2) a new lower reservoir, including an
existing abandoned mine pit, with a
surface area of 25 acres and a storage
capacity of 1,620 acre-feet at a surface
elevation of 1,000 feet msl; (3) a new
2,242-foot-long, 48-inch-diameter
penstock connecting the upper and
lower reservoirs; (4) a new 150-footlong, 50-foot-wide, 25-foot-high
powerhouse containing two turbinegenerator units with a total rated
capacity of 44 megawatts; (5) a new
10,000-foot-long transmission line
connecting the powerhouse to the
Sunbury-Eldred-Frackville 230-kilovolt
circuit owned by PPL Corporation; and
(6) appurtenant facilities. The proposed
project would have an annual
generation of 161,587 megawatt-hours.
Applicant Contact: Adam Rousselle,
Merchant Hydro Developers, LLC, 5710
Oak Crest Drive, Doylestown, PA 18902;
phone: 267–254–6107.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14824–000.
More information about this project,
including a copy of the application, can
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 82, Number 36 (Friday, February 24, 2017)]
[Notices]
[Page 11569]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03564]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-976-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Attachment AQ Revisions
Addressing Non-Material Delivery Point Changes to be effective 4/17/
2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5074.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17-977-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: GIA & DSA Oak Creek I
Project SA Nos. 948-949 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5078.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17-978-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: GIA & DSA Oak Creek II
Project SA Nos. 946-947 to be effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5079.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17-979-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA SA No. 4618,
Queue Position AB1-150 to be effective 1/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5118.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17-980-000.
Applicants: Alliant Energy Corporate Services, Inc.
Description: Sec. 205(d) Rate Filing: AECS Updated Rate Schedule 2
to be effective 4/17/2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5126.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17-981-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: WAPA NITSA Rev 5 to be
effective 2/1/2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5145.
Comments Due: 5 p.m. ET 3/9/17.
Docket Numbers: ER17-982-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to Service
Agreement Nos. 3086 and 4118, Queue No. M24 to Sch. B, C, F to be
effective 2/14/2017.
Filed Date: 2/16/17.
Accession Number: 20170216-5160.
Comments Due: 5 p.m. ET 3/9/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 16, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-03564 Filed 2-23-17; 8:45 am]
BILLING CODE 6717-01-P