Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC, 11148 [2017-03372]

Download as PDF 11148 Federal Register / Vol. 82, No. 33 / Tuesday, February 21, 2017 / Rules and Regulations of the local flight standards district office/ certificate holding district office (j) Related Information For more information about this AD, contact Myles Jalalian, Aerospace Engineer, Systems and Equipment Branch, ACE–119A, FAA, Atlanta ACO, 1701 Columbia Avenue, College Park, GA 30337; phone: 404–474– 5572; fax: 404–474–5606; email: Myles.Jalalian@faa.gov. (k) Material Incorporated by Reference (1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. (2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. (i) Gulfstream G650 Aircraft Service Change 037, Revision A, dated June 28, 2016. (ii) Gulfstream G650ER Aircraft Service Change 037, Revision A, dated June 28, 2016. (3) For service information identified in this AD, contact Gulfstream Aerospace Corporation, Technical Publications Dept., P.O. Box 2206, Savannah, GA 31402–2206; telephone: 800–810–4853; fax: 912–965– 3520; email: pubs@gulfstream.com; Internet: https://www.gulfstream.com/product_ support/technical_pubs/pubs/index.htm. (4) You may view this service information at FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425–227–1221. (5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: https:// www.archives.gov/federal-register/cfr/ibrlocations.html. Issued in Renton, Washington, on February 2, 2017. Michael Kaszycki, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 2017–03026 Filed 2–17–17; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 rmajette on DSK2TPTVN1PROD with RULES [Docket No. USCG–2016–1087] Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating SUMMARY: VerDate Sep<11>2014 14:42 Feb 17, 2017 Jkt 241001 schedule that governs the S.R. 74 Bridge across the Atlantic Intracoastal Waterway, mile 283.1, at Wrightsville Beach, NC. The deviation is necessary to accommodate the free movement of pedestrians and vehicles during the 8th Annual Wrightsville Beach Marathon. This deviation allows the bridge to remain in the closed-to-navigation position. DATES: The deviation is effective from 5 a.m. to 11 a.m. on March 25, 2017. ADDRESSES: The docket for this deviation, [USCG–2016–1087] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Mr. Martin Bridges, Bridge Administration Branch Fifth District, Coast Guard, telephone 757–398–6422, email Martin.A.Bridges@ uscg.mil. SUPPLEMENTARY INFORMATION: The event director, Without Limits, with approval from the North Carolina Department of Transportation, who owns and operates the S.R. 74 Bridge across the Atlantic Intracoastal Waterway, mile 283.1, at Wrightsville Beach, NC, has requested a temporary deviation from the current operating regulations. This temporary deviation is necessary to accommodate the free movement of pedestrians and vehicles during the 8th Annual Wrightsville Beach Marathon. The bridge is a double bascule bridge and has a vertical clearance in the closed position of 20 feet above mean high water. The current operating schedule is set out in 33 CFR 117.821(a)(4). Under this temporary deviation, the bridge will remain in the closed-to-navigation position from 5 a.m. to 11 a.m., on March 25, 2017. The Atlantic Intracoastal Waterway is used by a variety of vessels including recreational vessels, tug and barge traffic, fishing vessels, and small commercial vessels. The Coast Guard has carefully coordinated the restrictions with waterway users in publishing this temporary deviation. Vessels able to pass through the bridge in the closed position may do so at any time. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels unable to pass through the bridge in the closed position. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels PO 00000 Frm 00018 Fmt 4700 Sfmt 4700 can arrange their transits to minimize any impacts caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 14, 2017. Hal R. Pitts, Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2017–03372 Filed 2–17–17; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2017–0050] RIN 1625–AA09 Drawbridge Operation Regulation; Sturgeon Bay, Sturgeon Bay, WI Coast Guard, DHS. Interim rule with request for comments. AGENCY: ACTION: The Coast Guard is modifying the operating regulation that governs the Bayview (State Route 42/57) Bridge, Mile 3.0, Maple-Oregon Bridge, Mile 4.17, and Michigan Street Bridge, Mile 4.3, all over Sturgeon Bay Ship Canal in Sturgeon Bay, WI, to allow testing of the remote operation equipment for all three drawbridges. The operating schedules are not changing. The three drawbridges will be remotely operated by a single tender throughout the 2017 navigation season with request for comments from all stakeholders on the safety and effectiveness of the remote operation arrangement. SUMMARY: This interim rule is effective from March 23, 2017 to midnight on March 15, 2018. Comments and related material must reach the Coast Guard on or before December 1, 2017. ADDRESSES: You may submit comments or view documents mentioned in this preamble as being available in the docket, go to https:// www.regulations.gov, type [USCG– 2017–0050] in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this rulemaking. See the ‘‘Public Participation and Request for Comments’’ portion of the SUPPLEMENTARY INFORMATION section DATES: E:\FR\FM\21FER1.SGM 21FER1

Agencies

[Federal Register Volume 82, Number 33 (Tuesday, February 21, 2017)]
[Rules and Regulations]
[Page 11148]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03372]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-1087]


Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, 
Wrightsville Beach, NC

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the S.R. 74 Bridge across the Atlantic 
Intracoastal Waterway, mile 283.1, at Wrightsville Beach, NC. The 
deviation is necessary to accommodate the free movement of pedestrians 
and vehicles during the 8th Annual Wrightsville Beach Marathon. This 
deviation allows the bridge to remain in the closed-to-navigation 
position.

DATES: The deviation is effective from 5 a.m. to 11 a.m. on March 25, 
2017.

ADDRESSES: The docket for this deviation, [USCG-2016-1087] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Martin Bridges, Bridge 
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6422, email Martin.A.Bridges@uscg.mil.

SUPPLEMENTARY INFORMATION: The event director, Without Limits, with 
approval from the North Carolina Department of Transportation, who owns 
and operates the S.R. 74 Bridge across the Atlantic Intracoastal 
Waterway, mile 283.1, at Wrightsville Beach, NC, has requested a 
temporary deviation from the current operating regulations. This 
temporary deviation is necessary to accommodate the free movement of 
pedestrians and vehicles during the 8th Annual Wrightsville Beach 
Marathon. The bridge is a double bascule bridge and has a vertical 
clearance in the closed position of 20 feet above mean high water.
    The current operating schedule is set out in 33 CFR 117.821(a)(4). 
Under this temporary deviation, the bridge will remain in the closed-
to-navigation position from 5 a.m. to 11 a.m., on March 25, 2017. The 
Atlantic Intracoastal Waterway is used by a variety of vessels 
including recreational vessels, tug and barge traffic, fishing vessels, 
and small commercial vessels. The Coast Guard has carefully coordinated 
the restrictions with waterway users in publishing this temporary 
deviation.
    Vessels able to pass through the bridge in the closed position may 
do so at any time. The bridge will be able to open for emergencies and 
there is no immediate alternate route for vessels unable to pass 
through the bridge in the closed position. The Coast Guard will also 
inform the users of the waterway through our Local and Broadcast Notice 
to Mariners of the change in operating schedule for the bridge so that 
vessels can arrange their transits to minimize any impacts caused by 
the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: February 14, 2017.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2017-03372 Filed 2-17-17; 8:45 am]
 BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.