Combined Notice of Filings #1, 11027-11028 [2017-03207]
Download as PDF
Federal Register / Vol. 82, No. 32 / Friday, February 17, 2017 / Notices
• Public Comments
• Final Comments from the Board
• Adjourn
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Greg
Simonton at least seven days in advance
of the meeting at the phone number
listed above. Written statements may be
filed with the Board either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Greg
Simonton at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Greg Simonton at the
address and phone number listed above.
Minutes will also be available at the
following Web site: https://www.portsssab.energy.gov/.
Issued at Washington, DC, on February 9,
2017.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2017–03196 Filed 2–16–17; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4814–000]
mstockstill on DSK3G9T082PROD with NOTICES
Watterra Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 5, 2017, Watterra Energy,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Tuttle Creek Dam Hydroelectric Project
(Tuttle Creek Project or project) to be
located at the U.S. Army Corps of
Engineers’ (Corps) Tuttle Creek Dam on
the Big Blue River in Manhattan County,
VerDate Sep<11>2014
17:38 Feb 16, 2017
Jkt 241001
Kansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following all new facilities: (1) An
18-foot-diameter, 800-foot-long steel
penstock that bifurcates into one 18foot-diameter, 60-foot-long steel
penstock discharging into an existing
stilling basin and one 18-foot-diameter,
250-foot-long steel penstock carrying
flows to the project’s powerhouse; (2) a
bifurcation structure located at the end
of the 800-foot-long penstock near an
existing stilling basin; (3) a 70-foot-long,
55-foot-wide, 30-foot-high powerhouse
located on the south side of the stilling
basin; (4) two horizontal Francis
turbines each with an installed capacity
of 5.93 megawatts (MW) for a total
capacity of 11.86 MW; (5) a single
generator connected to the two Francis
turbines; (6) a 8,200-foot-long, 12.7
kilovolt transmission line
interconnecting to an existing
distribution system using an existing
substation; and (7) appurtenant
facilities. The estimated annual
generation of the Tuttle Creek Project
would be 64,643 megawatt-hours.
Applicant Contact: Mr. Craig Dalton,
7100 Commercial Avenue, Suite 4,
Billings, MT 59101; Email: cdalton@
watterraenergy.com; phone: (406) 384–
0080.
FERC Contact: Sergiu Serban; Email:
sergiu.serban@ferc.gov; phone: (202)
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
11027
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14814–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14814) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: February 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–03155 Filed 2–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–58–000.
Applicants: Whitney Point Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Whitney Point Solar,
LLC.
Filed Date: 2/13/17.
Accession Number: 20170213–5034.
Comments Due: 5 p.m. ET 3/6/17.
Docket Numbers: EG17–59–000.
Applicants: Westside Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Westside Solar, LLC.
Filed Date: 2/13/17.
Accession Number: 20170213–5035.
Comments Due: 5 p.m. ET 3/6/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–505–001.
Applicants: South Central MCN LLC.
Description: Compliance filing: South
Central MCN LLC Compliance Filing to
be effective 4/1/2016.
Filed Date: 2/10/17.
Accession Number: 20170210–5158.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17–446–002.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing: Errata
Capacity Exports Compliance to be
effective 1/29/2017.
Filed Date: 2/10/17.
Accession Number: 20170210–5161.
E:\FR\FM\17FEN1.SGM
17FEN1
mstockstill on DSK3G9T082PROD with NOTICES
11028
Federal Register / Vol. 82, No. 32 / Friday, February 17, 2017 / Notices
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17–961–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: § 205(d) Rate Filing:
MMU TOP 539 0.1.0 Agrmt Filing to be
effective 4/11/2017.
Filed Date: 2/10/17.
Accession Number: 20170210–5152.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17–962–000.
Applicants: MS Solar 2, LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 4/11/2017.
Filed Date: 2/10/17.
Accession Number: 20170210–5159.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17–963–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits Fourth Quarter 2016 Capital
Budget Report.
Filed Date: 2/10/17.
Accession Number: 20170210–5187.
Comments Due: 5 p.m. ET 3/3/17.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES17–12–000.
Applicants: Xcel Energy Southwest
Transmission Company, LLC.
Description: Supplement (Corrected
Exhibits) to January 31, 2017
Application under Section 204 of the
Federal Power Act of Xcel Energy
Southwest Transmission Company,
LLC.
Filed Date: 2/7/17.
Accession Number: 20170207–5232.
Comments Due: 5 p.m. ET 2/21/17.
Docket Numbers: ES17–13–000.
Applicants: Xcel Energy Transmission
Development Company, LLC.
Description: Supplement (Corrected
Exhibits) to January 31, 2017
Application under Section 204 of the
Federal Power Act of Xcel Energy
Transmission Development Company,
LLC.
Filed Date: 2/7/17.
Accession Number: 20170207–5233.
Comments Due: 5 p.m. ET 2/21/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
VerDate Sep<11>2014
17:38 Feb 16, 2017
Jkt 241001
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 13, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–03207 Filed 2–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–40–000; PF16–9–000]
Spire STL Pipeline, LLC; Notice of
Application
Take notice that on January 26, 2017,
Spire STL Pipeline LLC (Spire), 700
Market Street, St. Louis, Missouri
63101, filed an application pursuant to
section 7(c) of the Natural Gas Act
(NGA) and Parts 157 and 284 of the
Commission’s Regulations requesting
authority to construct and operate a
pipeline project which would include:
(i) The construction of approximately 59
miles of a new greenfield, 24-inchdiameter pipeline; (ii) the acquisition of
approximately seven miles of existing
Line 880, currently owned by Laclede
Gas Company (Laclede); and (iii) minor
modifications to line 880 after it is
acquired. Spire’s new pipeline would
extend from an interconnection with the
Rockies Express Pipeline (REX)
southward through Scott, Greene and
Jersey Counties, Illinois and St. Charles
and St. Louis Counties, Missouri to an
interconnection with the Laclede’s Line
880. Combined the project will be a
new, approximately 66 mile long
interstate natural gas pipeline that is
designed to provide approximately
400,000 dekatherms per day (Dth/d) of
new firm natural gas transportation
service to the St. Louis metropolitan
area. The cost to construct and acquire
the project facilities is approximately
$220 million dollars.
The filing may be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to Scott
Jaskowiak, Vice President, Spire STL
Pipeline LLC, 700 Market Street, St.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Louis, Missouri 63101, phone: 314–516–
8588, email: scott.jaskowiak@
spireenergy.com.
On July 22, 2016 the Commission
granted Spire’s request to utilize the
Pre-Filing Process and assigned Docket
No. PF16–9–000 to staff activities
involved in the Spire project. Now, as
of the filing of the January 26
application, the Pre-Filing Process for
this project has ended. From this time
forward, this proceeding will be
conducted in Docket No. CP17–40–000
as noted in the caption of this Notice.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
5 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 82, Number 32 (Friday, February 17, 2017)]
[Notices]
[Pages 11027-11028]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03207]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG17-58-000.
Applicants: Whitney Point Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Whitney Point Solar, LLC.
Filed Date: 2/13/17.
Accession Number: 20170213-5034.
Comments Due: 5 p.m. ET 3/6/17.
Docket Numbers: EG17-59-000.
Applicants: Westside Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Westside Solar, LLC.
Filed Date: 2/13/17.
Accession Number: 20170213-5035.
Comments Due: 5 p.m. ET 3/6/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-505-001.
Applicants: South Central MCN LLC.
Description: Compliance filing: South Central MCN LLC Compliance
Filing to be effective 4/1/2016.
Filed Date: 2/10/17.
Accession Number: 20170210-5158.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17-446-002.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Errata Capacity Exports Compliance
to be effective 1/29/2017.
Filed Date: 2/10/17.
Accession Number: 20170210-5161.
[[Page 11028]]
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17-961-000.
Applicants: Northern States Power Company, a Minnesota corporation.
Description: Sec. 205(d) Rate Filing: MMU TOP 539 0.1.0 Agrmt
Filing to be effective 4/11/2017.
Filed Date: 2/10/17.
Accession Number: 20170210-5152.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17-962-000.
Applicants: MS Solar 2, LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
4/11/2017.
Filed Date: 2/10/17.
Accession Number: 20170210-5159.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17-963-000.
Applicants: ISO New England Inc.
Description: ISO New England Inc. submits Fourth Quarter 2016
Capital Budget Report.
Filed Date: 2/10/17.
Accession Number: 20170210-5187.
Comments Due: 5 p.m. ET 3/3/17.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES17-12-000.
Applicants: Xcel Energy Southwest Transmission Company, LLC.
Description: Supplement (Corrected Exhibits) to January 31, 2017
Application under Section 204 of the Federal Power Act of Xcel Energy
Southwest Transmission Company, LLC.
Filed Date: 2/7/17.
Accession Number: 20170207-5232.
Comments Due: 5 p.m. ET 2/21/17.
Docket Numbers: ES17-13-000.
Applicants: Xcel Energy Transmission Development Company, LLC.
Description: Supplement (Corrected Exhibits) to January 31, 2017
Application under Section 204 of the Federal Power Act of Xcel Energy
Transmission Development Company, LLC.
Filed Date: 2/7/17.
Accession Number: 20170207-5233.
Comments Due: 5 p.m. ET 2/21/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 13, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-03207 Filed 2-16-17; 8:45 am]
BILLING CODE 6717-01-P