Watterra Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 11027 [2017-03155]
Download as PDF
Federal Register / Vol. 82, No. 32 / Friday, February 17, 2017 / Notices
• Public Comments
• Final Comments from the Board
• Adjourn
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Greg
Simonton at least seven days in advance
of the meeting at the phone number
listed above. Written statements may be
filed with the Board either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Greg
Simonton at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Greg Simonton at the
address and phone number listed above.
Minutes will also be available at the
following Web site: https://www.portsssab.energy.gov/.
Issued at Washington, DC, on February 9,
2017.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2017–03196 Filed 2–16–17; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4814–000]
mstockstill on DSK3G9T082PROD with NOTICES
Watterra Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On January 5, 2017, Watterra Energy,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Tuttle Creek Dam Hydroelectric Project
(Tuttle Creek Project or project) to be
located at the U.S. Army Corps of
Engineers’ (Corps) Tuttle Creek Dam on
the Big Blue River in Manhattan County,
VerDate Sep<11>2014
17:38 Feb 16, 2017
Jkt 241001
Kansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following all new facilities: (1) An
18-foot-diameter, 800-foot-long steel
penstock that bifurcates into one 18foot-diameter, 60-foot-long steel
penstock discharging into an existing
stilling basin and one 18-foot-diameter,
250-foot-long steel penstock carrying
flows to the project’s powerhouse; (2) a
bifurcation structure located at the end
of the 800-foot-long penstock near an
existing stilling basin; (3) a 70-foot-long,
55-foot-wide, 30-foot-high powerhouse
located on the south side of the stilling
basin; (4) two horizontal Francis
turbines each with an installed capacity
of 5.93 megawatts (MW) for a total
capacity of 11.86 MW; (5) a single
generator connected to the two Francis
turbines; (6) a 8,200-foot-long, 12.7
kilovolt transmission line
interconnecting to an existing
distribution system using an existing
substation; and (7) appurtenant
facilities. The estimated annual
generation of the Tuttle Creek Project
would be 64,643 megawatt-hours.
Applicant Contact: Mr. Craig Dalton,
7100 Commercial Avenue, Suite 4,
Billings, MT 59101; Email: cdalton@
watterraenergy.com; phone: (406) 384–
0080.
FERC Contact: Sergiu Serban; Email:
sergiu.serban@ferc.gov; phone: (202)
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
11027
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14814–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14814) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: February 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–03155 Filed 2–16–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–58–000.
Applicants: Whitney Point Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Whitney Point Solar,
LLC.
Filed Date: 2/13/17.
Accession Number: 20170213–5034.
Comments Due: 5 p.m. ET 3/6/17.
Docket Numbers: EG17–59–000.
Applicants: Westside Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Westside Solar, LLC.
Filed Date: 2/13/17.
Accession Number: 20170213–5035.
Comments Due: 5 p.m. ET 3/6/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–505–001.
Applicants: South Central MCN LLC.
Description: Compliance filing: South
Central MCN LLC Compliance Filing to
be effective 4/1/2016.
Filed Date: 2/10/17.
Accession Number: 20170210–5158.
Comments Due: 5 p.m. ET 3/3/17.
Docket Numbers: ER17–446–002.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing: Errata
Capacity Exports Compliance to be
effective 1/29/2017.
Filed Date: 2/10/17.
Accession Number: 20170210–5161.
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 82, Number 32 (Friday, February 17, 2017)]
[Notices]
[Page 11027]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03155]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4814-000]
Watterra Energy, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On January 5, 2017, Watterra Energy, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Tuttle Creek Dam
Hydroelectric Project (Tuttle Creek Project or project) to be located
at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam on the
Big Blue River in Manhattan County, Kansas. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following all new
facilities: (1) An 18-foot-diameter, 800-foot-long steel penstock that
bifurcates into one 18-foot-diameter, 60-foot-long steel penstock
discharging into an existing stilling basin and one 18-foot-diameter,
250-foot-long steel penstock carrying flows to the project's
powerhouse; (2) a bifurcation structure located at the end of the 800-
foot-long penstock near an existing stilling basin; (3) a 70-foot-long,
55-foot-wide, 30-foot-high powerhouse located on the south side of the
stilling basin; (4) two horizontal Francis turbines each with an
installed capacity of 5.93 megawatts (MW) for a total capacity of 11.86
MW; (5) a single generator connected to the two Francis turbines; (6) a
8,200-foot-long, 12.7 kilovolt transmission line interconnecting to an
existing distribution system using an existing substation; and (7)
appurtenant facilities. The estimated annual generation of the Tuttle
Creek Project would be 64,643 megawatt-hours.
Applicant Contact: Mr. Craig Dalton, 7100 Commercial Avenue, Suite
4, Billings, MT 59101; Email: cdalton@watterraenergy.com; phone: (406)
384-0080.
FERC Contact: Sergiu Serban; Email: sergiu.serban@ferc.gov; phone:
(202) 502-6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14814-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14814) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: February 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-03155 Filed 2-16-17; 8:45 am]
BILLING CODE 6717-01-P