Eugene Water and Electric Board; Notice of Technical Conference, 11030 [2017-03154]
Download as PDF
11030
Federal Register / Vol. 82, No. 32 / Friday, February 17, 2017 / Notices
are invited to attend. The Carmen-Smith
Project is located approximately 71
miles east of Eugene, Oregon.
h. All participants should meet at the
project headquarters on U.S. Highway
126 (McKenzie Highway), immediately
upstream from the Carmen powerhouse.
Parking during the Environmental Site
Review will be limited and carpooling
is encouraged. Participants should dress
for outdoor winter weather. Anyone
intending to participate or with
questions about the Environmental Site
Review should contact Patty Boyle of
EWEB at (541) 685–7406.
DEPARTMENT OF ENERGY
Dated: February 10, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Combined Notice of Filings #1
Dated: February 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Comments Due: 5 p.m. ET 3/3/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Federal Energy Regulatory
Commission
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
[FR Doc. 2017–03218 Filed 2–16–17; 8:45 am]
Dated: February 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–03154 Filed 2–16–17; 8:45 am]
[FR Doc. 2017–03221 Filed 2–16–17; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2242–078]
BILLING CODE 6717–01–P
mstockstill on DSK3G9T082PROD with NOTICES
Eugene Water and Electric Board;
Notice of Technical Conference
a. Date and Time of Meeting:
Wednesday, March 29, 2017, beginning
at 9:00 a.m. (PST) and concluding no
later than 4:00 p.m. (PST)
b. Place: Willamette National Forest
Supervisor’s Office, 3106 Pierce
Parkway, Suite D, Room 213,
Springfield, Oregon 97477. For
directions, please contact the
Supervisor’s Office at (541) 225–6300.
c. FERC Contact: Dianne Rodman at
(202) 502–6077 or dianne.rodman@
ferc.gov.
d. Purpose of Meeting: To discuss the
amended settlement agreement, filed on
November 30, 2016 by the Eugene Water
and Electric Board (EWEB), as part of
the application for new license for
EWEB’s Carmen-Smith Hydroelectric
Project No. 2242.
e. There will be no transcript of the
conference, but a summary will be
prepared for the project record.
f. All local, state, and federal agencies,
Indian tribes, and other interested
parties are invited to participate either
in person or by telephone. Please call
Patty Boyle at (541) 685–7406 by 5:00
p.m. March 27, 2017, to RSVP and to
receive specific instructions on how to
participate by telephone.
g. EWEB and FERC staff will conduct
a project Environmental Site Review
beginning at 9:00 a.m. on Tuesday,
March 28, 2017. All interested
individuals, organizations, and agencies
VerDate Sep<11>2014
17:38 Feb 16, 2017
Jkt 241001
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–955–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Third Revised ISA No. 2554, Queue No.
Z1–087 to be effective 1/9/2017.
Filed Date: 2/9/17.
Accession Number: 20170209–5212.
Comments Due: 5 p.m. ET 3/2/17.
Docket Numbers: ER17–956–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing: Att.
O Formula Rate Protocols Revisions to
be effective 4/12/2017.
Filed Date: 2/10/17.
Accession Number: 20170210–5045.
Comments Due: 5 p.m. ET 3/3/17.
Take notice that the Commission
received the following electric
reliability filings.
Docket Numbers: RD16–10–000.
Applicants: North American Electric
Reliability Corporation, Western
Electricity Coordinating Council.
Description: Joint Petition of the
North American Electric Reliability
Corporation and Western Electricity
Coordinating Council for Approval of
Retirement of Regional Reliability
Standard TOP–007–WECC–1a. Also, on
11/16/2016 Supplemental Information
for Petition was submitted.
Filed Date: 3/23/2016; 11/16/16.
Accession Number: 20160323–5219;
20161116–5174.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC17–47–000.
Applicants: Wisconsin Power and
Light Company, Wisconsin Public
Service Corporation, Madison Gas and
Electric Company.
Description: Amendment to December
13, 2016 Joint Amendment to December
13, 2016 Joint Application (Revised Pro
Forma Accounting Entries) under
Section 203 of the Federal Power Act of
Wisconsin Power and Light Company,
et al.
Filed Date: 2/9/17.
Accession Number: 20170209–5266.
Comments Due: 5 p.m. ET 3/2/17.
Docket Numbers: EC17–60–000.
Applicants: TerraForm Private LLC,
Meadow Creek Project Company LLC,
Goshen Phase II LLC, Wolverine Creek
Goshen Interconnection LLC, Canadian
Hills Wind, LLC, Rockland Wind Farm
LLC, Burley Butte Wind Park, LLC,
Golden Valley Wind Park, LLC, Milner
Dam Wind Park, LLC, Oregon Trail
Wind Park, LLC, Pilgrim Stage Station
Wind Park, LLC, Thousand Springs
Wind Park, LLC, Tuana Gulch Wind
Park, LLC, Camp Reed Wind Park, LLC,
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 82, Number 32 (Friday, February 17, 2017)]
[Notices]
[Page 11030]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03154]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2242-078]
Eugene Water and Electric Board; Notice of Technical Conference
a. Date and Time of Meeting: Wednesday, March 29, 2017, beginning
at 9:00 a.m. (PST) and concluding no later than 4:00 p.m. (PST)
b. Place: Willamette National Forest Supervisor's Office, 3106
Pierce Parkway, Suite D, Room 213, Springfield, Oregon 97477. For
directions, please contact the Supervisor's Office at (541) 225-6300.
c. FERC Contact: Dianne Rodman at (202) 502-6077 or
dianne.rodman@ferc.gov.
d. Purpose of Meeting: To discuss the amended settlement agreement,
filed on November 30, 2016 by the Eugene Water and Electric Board
(EWEB), as part of the application for new license for EWEB's Carmen-
Smith Hydroelectric Project No. 2242.
e. There will be no transcript of the conference, but a summary
will be prepared for the project record.
f. All local, state, and federal agencies, Indian tribes, and other
interested parties are invited to participate either in person or by
telephone. Please call Patty Boyle at (541) 685-7406 by 5:00 p.m. March
27, 2017, to RSVP and to receive specific instructions on how to
participate by telephone.
g. EWEB and FERC staff will conduct a project Environmental Site
Review beginning at 9:00 a.m. on Tuesday, March 28, 2017. All
interested individuals, organizations, and agencies are invited to
attend. The Carmen-Smith Project is located approximately 71 miles east
of Eugene, Oregon.
h. All participants should meet at the project headquarters on U.S.
Highway 126 (McKenzie Highway), immediately upstream from the Carmen
powerhouse. Parking during the Environmental Site Review will be
limited and carpooling is encouraged. Participants should dress for
outdoor winter weather. Anyone intending to participate or with
questions about the Environmental Site Review should contact Patty
Boyle of EWEB at (541) 685-7406.
Dated: February 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-03154 Filed 2-16-17; 8:45 am]
BILLING CODE 6717-01-P