Eugene Water and Electric Board; Notice of Technical Conference, 11030 [2017-03154]

Download as PDF 11030 Federal Register / Vol. 82, No. 32 / Friday, February 17, 2017 / Notices are invited to attend. The Carmen-Smith Project is located approximately 71 miles east of Eugene, Oregon. h. All participants should meet at the project headquarters on U.S. Highway 126 (McKenzie Highway), immediately upstream from the Carmen powerhouse. Parking during the Environmental Site Review will be limited and carpooling is encouraged. Participants should dress for outdoor winter weather. Anyone intending to participate or with questions about the Environmental Site Review should contact Patty Boyle of EWEB at (541) 685–7406. DEPARTMENT OF ENERGY Dated: February 10, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. Combined Notice of Filings #1 Dated: February 8, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. Comments Due: 5 p.m. ET 3/3/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2017–03218 Filed 2–16–17; 8:45 am] Dated: February 10, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–03154 Filed 2–16–17; 8:45 am] [FR Doc. 2017–03221 Filed 2–16–17; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2242–078] BILLING CODE 6717–01–P mstockstill on DSK3G9T082PROD with NOTICES Eugene Water and Electric Board; Notice of Technical Conference a. Date and Time of Meeting: Wednesday, March 29, 2017, beginning at 9:00 a.m. (PST) and concluding no later than 4:00 p.m. (PST) b. Place: Willamette National Forest Supervisor’s Office, 3106 Pierce Parkway, Suite D, Room 213, Springfield, Oregon 97477. For directions, please contact the Supervisor’s Office at (541) 225–6300. c. FERC Contact: Dianne Rodman at (202) 502–6077 or dianne.rodman@ ferc.gov. d. Purpose of Meeting: To discuss the amended settlement agreement, filed on November 30, 2016 by the Eugene Water and Electric Board (EWEB), as part of the application for new license for EWEB’s Carmen-Smith Hydroelectric Project No. 2242. e. There will be no transcript of the conference, but a summary will be prepared for the project record. f. All local, state, and federal agencies, Indian tribes, and other interested parties are invited to participate either in person or by telephone. Please call Patty Boyle at (541) 685–7406 by 5:00 p.m. March 27, 2017, to RSVP and to receive specific instructions on how to participate by telephone. g. EWEB and FERC staff will conduct a project Environmental Site Review beginning at 9:00 a.m. on Tuesday, March 28, 2017. All interested individuals, organizations, and agencies VerDate Sep<11>2014 17:38 Feb 16, 2017 Jkt 241001 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–955–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Third Revised ISA No. 2554, Queue No. Z1–087 to be effective 1/9/2017. Filed Date: 2/9/17. Accession Number: 20170209–5212. Comments Due: 5 p.m. ET 3/2/17. Docket Numbers: ER17–956–000. Applicants: Louisville Gas and Electric Company. Description: § 205(d) Rate Filing: Att. O Formula Rate Protocols Revisions to be effective 4/12/2017. Filed Date: 2/10/17. Accession Number: 20170210–5045. Comments Due: 5 p.m. ET 3/3/17. Take notice that the Commission received the following electric reliability filings. Docket Numbers: RD16–10–000. Applicants: North American Electric Reliability Corporation, Western Electricity Coordinating Council. Description: Joint Petition of the North American Electric Reliability Corporation and Western Electricity Coordinating Council for Approval of Retirement of Regional Reliability Standard TOP–007–WECC–1a. Also, on 11/16/2016 Supplemental Information for Petition was submitted. Filed Date: 3/23/2016; 11/16/16. Accession Number: 20160323–5219; 20161116–5174. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–47–000. Applicants: Wisconsin Power and Light Company, Wisconsin Public Service Corporation, Madison Gas and Electric Company. Description: Amendment to December 13, 2016 Joint Amendment to December 13, 2016 Joint Application (Revised Pro Forma Accounting Entries) under Section 203 of the Federal Power Act of Wisconsin Power and Light Company, et al. Filed Date: 2/9/17. Accession Number: 20170209–5266. Comments Due: 5 p.m. ET 3/2/17. Docket Numbers: EC17–60–000. Applicants: TerraForm Private LLC, Meadow Creek Project Company LLC, Goshen Phase II LLC, Wolverine Creek Goshen Interconnection LLC, Canadian Hills Wind, LLC, Rockland Wind Farm LLC, Burley Butte Wind Park, LLC, Golden Valley Wind Park, LLC, Milner Dam Wind Park, LLC, Oregon Trail Wind Park, LLC, Pilgrim Stage Station Wind Park, LLC, Thousand Springs Wind Park, LLC, Tuana Gulch Wind Park, LLC, Camp Reed Wind Park, LLC, E:\FR\FM\17FEN1.SGM 17FEN1

Agencies

[Federal Register Volume 82, Number 32 (Friday, February 17, 2017)]
[Notices]
[Page 11030]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-03154]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2242-078]


Eugene Water and Electric Board; Notice of Technical Conference

    a. Date and Time of Meeting: Wednesday, March 29, 2017, beginning 
at 9:00 a.m. (PST) and concluding no later than 4:00 p.m. (PST)
    b. Place: Willamette National Forest Supervisor's Office, 3106 
Pierce Parkway, Suite D, Room 213, Springfield, Oregon 97477. For 
directions, please contact the Supervisor's Office at (541) 225-6300.
    c. FERC Contact: Dianne Rodman at (202) 502-6077 or 
dianne.rodman@ferc.gov.
    d. Purpose of Meeting: To discuss the amended settlement agreement, 
filed on November 30, 2016 by the Eugene Water and Electric Board 
(EWEB), as part of the application for new license for EWEB's Carmen-
Smith Hydroelectric Project No. 2242.
    e. There will be no transcript of the conference, but a summary 
will be prepared for the project record.
    f. All local, state, and federal agencies, Indian tribes, and other 
interested parties are invited to participate either in person or by 
telephone. Please call Patty Boyle at (541) 685-7406 by 5:00 p.m. March 
27, 2017, to RSVP and to receive specific instructions on how to 
participate by telephone.
    g. EWEB and FERC staff will conduct a project Environmental Site 
Review beginning at 9:00 a.m. on Tuesday, March 28, 2017. All 
interested individuals, organizations, and agencies are invited to 
attend. The Carmen-Smith Project is located approximately 71 miles east 
of Eugene, Oregon.
    h. All participants should meet at the project headquarters on U.S. 
Highway 126 (McKenzie Highway), immediately upstream from the Carmen 
powerhouse. Parking during the Environmental Site Review will be 
limited and carpooling is encouraged. Participants should dress for 
outdoor winter weather. Anyone intending to participate or with 
questions about the Environmental Site Review should contact Patty 
Boyle of EWEB at (541) 685-7406.

    Dated: February 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-03154 Filed 2-16-17; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.