KEI (Maine) Power Management (III) LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 10572-10573 [2017-02950]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
10572
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
Chapel Hill, in Chatham County, North
Carolina. The project does not occupy
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Andrew J.
McMahan, President, McMahan
Hydroelectric, L.L.C., 105 Durham
Eubanks Road, Pittsboro, NC 27312;
(336) 509–2148; emailmcmahanhydro@gmail.com.
i. FERC Contact: Sean Murphy at
(202) 502–6145; or email at
sean.murphy@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–4093–035.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis.
l. The existing Bynum Project
includes: (1) A 900-foot-long, 10-foothigh stone masonry dam (Bynum Dam,
or Odell Lake Dam), consisting of a 750foot-long uncontrolled spillway section
and a 150-foot-long non-overflow
section that contains canal intake
facilities; (2) a reservoir with a surface
area of 20 acres (referred to as Odell
Lake), with gross storage of 100 acre-feet
at elevation 315.0 feet mean sea level;
(3) two 6-foot-wide Tainter gates
controlling the intake to the canal; (4) a
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
2,000-foot-long, 40-foot-wide power
canal; (5) a powerhouse containing one
600 kilowatt generating unit; (6) a 500foot-long, 50-foot-wide tailrace; (7) a
100-foot-long, 0.48 kilovolt transmission
line to a utility company’s transformer;
and (9) appurtenant facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms, and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
Dated: February 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–02951 Filed 2–13–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2808–017]
KEI (Maine) Power Management (III)
LLC; Notice of Application Tendered
for Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: P–2808–017.
c. Date filed: January 31, 2017.
d. Applicant: KEI (Maine) Power
Management (III) LLC.
e. Name of Project: Lower Barker
Hydroelectric Project.
f. Location: On the Little
Androscoggin River, in the City of
Auburn, Androscoggin County, Maine.
The project does not occupy lands of the
United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Lewis Loon,
Operations and Maintenance Manager,
37 Alfred Plourde Parkway, Suite 2,
Lewiston, Maine 04240; (207) 786–8834.
i. FERC Contact: Karen Sughrue at
(202) 502–8556 or email at
Karen.Sughrue@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: March 31, 2017.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2808–017.
m. The application is not ready for
environmental analysis at this time.
n. The Lower Barker Project consists
of the following existing facilities: (1) A
232-foot-long, 30-foot-high concrete
dam with a 125-foot-long spillway with
flashboards, a 46-foot-long non-overflow
section with two waste gates along the
left buttress, and a 61-foot-long nonoverflow section with seven stop-logs
adjacent to the intake canal; (2) a 16.5acre reservoir with a storage capacity of
150-acre-feet; (3) a 60-foot-long, 20-footwide, 9.6-foot-deep intake canal on the
right bank with seven stop-logs; (4) a 35foot-long, 20-foot-wide gatehouse
containing a single gate and fitted with
trash racks; (5) a buried 650-foot-long,
10-foot-wide, 8-foot-high concrete
penstock; (6) a 50-foot-long, 25-footwide concrete powerhouse containing a
single semi-Kaplan-type turbine and
generating unit with a rated capacity of
1.5 megawatts; (7) a tailrace; (8) a 250foot-long, 4.2 kilovolt underground
power line; (9) a substation; and (10)
appurtenant facilities. The project
produces an average of 5,087 megawatthours annually.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Acceptance or Deficiency/Additional Information Letter ..................................................................................................
Issue Scoping Document 1 for comment ..................................................................................................................................
Hold Scoping Meeting ................................................................................................................................................................
Request Additional Information (if necessary) ...........................................................................................................................
Issue Scoping Document 2 (if necessary) .................................................................................................................................
Issue notice of ready for environmental analysis ......................................................................................................................
Notice of the availability of the draft NEPA document ..............................................................................................................
Initiate the 10(j) process ............................................................................................................................................................
Notice of the availability of the final NEPA document ...............................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: February 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–02950 Filed 2–13–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–959–001.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
Compliance notice re: effective date for
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
UDR tariff revisions to be effective 2/17/
2017.
Filed Date: 2/3/17.
Accession Number: 20170203–5097
Comments Due: 5 p.m. ET 2/24/17.
Docket Numbers: ER17–703–001.
Applicants: PacifiCorp.
Description: Tariff Amendment: BPA
NITSA (Yakama) Rev 7.1 to be effective
12/1/2016.
Filed Date: 2/3/17.
Accession Number: 20170203–5169.
Comments Due: 5 p.m. ET 2/24/17.
Docket Numbers: ER17–925–001.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Tariff Amendment: Part 2
of Two-Part Filing to Remove Active
Demand Resource Types to be effective
6/1/2018.
Filed Date: 2/3/17.
Accession Number: 20170203–5134.
Comments Due: 5 p.m. ET 2/24/17.
Docket Numbers: ER17–927–000.
Applicants: Wisconsin Public Service
Corporation.
Description: § 205(d) Rate Filing:
Assignment—Ancillary Services AGMT
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
10573
April 2017.
June 2017.
July 2017.
July 2017.
August 2017.
September 2017.
March 2018.
April 2018.
July 2018.
Combined Locks to Appleton Coated to
be effective 2/4/2017.
Filed Date: 2/3/17.
Accession Number: 20170203–5100.
Comments Due: 5 p.m. ET 2/24/17.
Docket Numbers: ER17–928–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
& DSA AVS-Phase 2 Project SA Nos. 943
& 944 to be effective 2/4/2017.
Filed Date: 2/3/17.
Accession Number: 20170203–5107.
Comments Due: 5 p.m. ET 2/24/17.
Docket Numbers: ER17–929–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Cancellation Distribution
Service Agreement Pristine Sun Fund 9,
LL to be effective 4/5/2017.
Filed Date: 2/3/17.
Accession Number: 20170203–5130.
Comments Due: 5 p.m. ET 2/24/17.
Docket Numbers: ER17–930–000.
Applicants: Guttman Energy Inc.
Description: Notice of Cancellation of
Market-Based Rate Tariff of Guttman
Energy Inc.
E:\FR\FM\14FEN1.SGM
14FEN1
Agencies
[Federal Register Volume 82, Number 29 (Tuesday, February 14, 2017)]
[Notices]
[Pages 10572-10573]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-02950]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2808-017]
KEI (Maine) Power Management (III) LLC; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: P-2808-017.
c. Date filed: January 31, 2017.
d. Applicant: KEI (Maine) Power Management (III) LLC.
e. Name of Project: Lower Barker Hydroelectric Project.
f. Location: On the Little Androscoggin River, in the City of
Auburn, Androscoggin County, Maine. The project does not occupy lands
of the United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Lewis Loon, Operations and Maintenance
Manager, 37 Alfred Plourde Parkway, Suite 2, Lewiston, Maine 04240;
(207) 786-8834.
i. FERC Contact: Karen Sughrue at (202) 502-8556 or email at
Karen.Sughrue@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if
[[Page 10573]]
any resource agency, Indian Tribe, or person believes that an
additional scientific study should be conducted in order to form an
adequate factual basis for a complete analysis of the application on
its merit, the resource agency, Indian Tribe, or person must file a
request for a study with the Commission not later than 60 days from the
date of filing of the application, and serve a copy of the request on
the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: March 31, 2017.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-2808-017.
m. The application is not ready for environmental analysis at this
time.
n. The Lower Barker Project consists of the following existing
facilities: (1) A 232-foot-long, 30-foot-high concrete dam with a 125-
foot-long spillway with flashboards, a 46-foot-long non-overflow
section with two waste gates along the left buttress, and a 61-foot-
long non-overflow section with seven stop-logs adjacent to the intake
canal; (2) a 16.5-acre reservoir with a storage capacity of 150-acre-
feet; (3) a 60-foot-long, 20-foot-wide, 9.6-foot-deep intake canal on
the right bank with seven stop-logs; (4) a 35-foot-long, 20-foot-wide
gatehouse containing a single gate and fitted with trash racks; (5) a
buried 650-foot-long, 10-foot-wide, 8-foot-high concrete penstock; (6)
a 50-foot-long, 25-foot-wide concrete powerhouse containing a single
semi-Kaplan-type turbine and generating unit with a rated capacity of
1.5 megawatts; (7) a tailrace; (8) a 250-foot-long, 4.2 kilovolt
underground power line; (9) a substation; and (10) appurtenant
facilities. The project produces an average of 5,087 megawatt-hours
annually.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Acceptance or Deficiency/Additional April 2017.
Information Letter.
Issue Scoping Document 1 for comment....... June 2017.
Hold Scoping Meeting....................... July 2017.
Request Additional Information (if July 2017.
necessary).
Issue Scoping Document 2 (if necessary).... August 2017.
Issue notice of ready for environmental September 2017.
analysis.
Notice of the availability of the draft March 2018.
NEPA document.
Initiate the 10(j) process................. April 2018.
Notice of the availability of the final July 2018.
NEPA document.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: February 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-02950 Filed 2-13-17; 8:45 am]
BILLING CODE 6717-01-P