Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 10590-10605 [2017-02795]
Download as PDF
10590
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
financial assistance under the National
Foundation on the Arts and Humanities
Act of 1965 and make recommendations
thereon to the Chairman; and to
consider gifts offered to NEH and make
recommendations thereon to the
Chairman.
The meeting will be held on
Thursday, March 2, 2017, from 10:30
a.m. until 12:30 p.m., and Friday, March
3, 2017, from 9:00 a.m. until adjourned.
ADDRESSES: The meeting will be held at
Constitution Center, 400 7th Street SW.,
Washington, DC 20506. See
SUPPLEMENTARY INFORMATION section for
room numbers.
FOR FURTHER INFORMATION CONTACT:
Elizabeth Voyatzis, Committee
Management Officer, 400 7th Street
SW., 4th Floor, Washington, DC 20506;
(202) 606–8322; evoyatzis@neh.gov.
SUPPLEMENTARY INFORMATION: The
National Council on the Humanities is
meeting pursuant to the National
Foundation on the Arts and Humanities
Act of 1965 (20 U.S.C. 951–960, as
amended). The Committee meetings of
the National Council on the Humanities
will be held on March 2, 2017, as
follows: The policy discussion session
(open to the public) will convene at
10:30 a.m. until approximately 11:30
a.m., followed by the discussion of
specific grant applications and programs
before the Council (closed to the public)
from 11:30 a.m. until 12:30 p.m.
Digital Humanities: Room 4085.
Education Programs: Room 4002.
Federal/State Partnership: Room
4089.
Preservation and Access: Room 2002.
Public Programs/Federal/State
Partnership: Room P003.
Research Programs: Room P002.
In addition, the Humanities Medal
Committee (closed to the public) will
meet from 2:30 p.m. until 3:30 p.m. in
Room P002.
The plenary session of the National
Council on the Humanities will convene
on March 3, 2017, at 9:00 a.m. in the
Conference Center at Constitution
Center. The agenda for the morning
session (open to the public) will be as
follows:
A. Minutes of the Previous Meeting
B. Reports
1. Chairman’s Remarks
2. Deputy Chairman’s Remarks
3. Presentation by guest speaker
Deborah Hess Norris
4. Congressional Affairs Report
5. Reports on Policy and General
Matters
a. Digital Humanities
b. Education Programs
c. Federal/State Partnership
sradovich on DSK3GMQ082PROD with NOTICES
DATES:
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
d. Preservation and Access
e. Public Programs
f. Research Programs
g. Humanities Medals
The remainder of the plenary session
will be for consideration of specific
applications and therefore will be
closed to the public.
As identified above, portions of the
meeting of the National Council on the
Humanities will be closed to the public
pursuant to sections 552b(c)(4),
552b(c)(6) and 552b(c)(9)(b) of Title 5
U.S.C., as amended. The closed sessions
will include review of personal and/or
proprietary financial and commercial
information given in confidence to the
agency by grant applicants, and
discussion of certain information, the
premature disclosure of which could
significantly frustrate implementation of
proposed agency action. I have made
this determination pursuant to the
authority granted me by the Chairman’s
Delegation of Authority to Close
Advisory Committee Meetings dated
April 15, 2016.
Please note that individuals planning
to attend the public sessions of the
meeting are subject to security screening
procedures. If you wish to attend any of
the public sessions, please inform NEH
as soon as possible by contacting Ms.
Katherine Griffin at (202) 606–8322 or
kgriffin@neh.gov. Please also provide
advance notice of any special needs or
accommodations, including for a sign
language interpreter.
Dated: February 8, 2017.
Elizabeth Voyatzis,
Committee Management Officer.
[FR Doc. 2017–02920 Filed 2–13–17; 8:45 am]
BILLING CODE 7536–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2017–0038]
Biweekly Notice; Applications and
Amendments to Facility Operating
Licenses and Combined Licenses
Involving No Significant Hazards
Considerations
Nuclear Regulatory
Commission.
ACTION: Biweekly notice.
AGENCY:
Pursuant to Section 189a.(2)
of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear
Regulatory Commission (NRC) is
publishing this regular biweekly notice.
The Act requires the Commission to
publish notice of any amendments
issued, or proposed to be issued, and
grants the Commission the authority to
SUMMARY:
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
issue and make immediately effective
any amendment to an operating license
or combined license, as applicable,
upon a determination by the
Commission that such amendment
involves no significant hazards
consideration, notwithstanding the
pendency before the Commission of a
request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued, from January 14
to January 30, 2017. The last biweekly
notice was published on January 31,
2017.
Comments must be filed by
March 16, 2017. A request for a hearing
must be filed by April 17, 2017.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0038. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Paula Blechman, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington DC
20555–0001; telephone: 301–415–2242,
email: Paula.Blechman@nrc.gov.
SUPPLEMENTARY INFORMATION:
DATES:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2017–
0038, facility name, unit number(s),
plant docket number, application date,
and subject when contacting the NRC
about the availability of information for
this action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2017–0038.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
sradovich on DSK3GMQ082PROD with NOTICES
B. Submitting Comments
Please include Docket ID NRC–2017–
0038, facility name, unit number(s),
plant docket number, application date,
and subject in your comment
submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Notice of Consideration of Issuance
of Amendments to Facility Operating
Licenses and Combined Licenses and
Proposed No Significant Hazards
Consideration Determination
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
§ 50.92 of title 10 of the Code of Federal
Regulations (10 CFR), this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated, or (2)
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period if circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility. If
the Commission takes action prior to the
expiration of either the comment period
or the notice period, it will publish in
the Federal Register a notice of
issuance. If the Commission makes a
final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
A. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s Web site at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
10591
appropriate, a notice of a hearing will be
issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
E:\FR\FM\14FEN1.SGM
14FEN1
sradovich on DSK3GMQ082PROD with NOTICES
10592
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to
establish when the hearing is held. If the
final determination is that the
amendment request involves no
significant hazards consideration, the
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission by April 17, 2017. The
petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or Federallyrecognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federallyrecognized Indian Tribe, or agency
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562, August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. Participants
may not submit paper copies of their
filings unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public Web site at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click cancel when
the link requests certificates and you
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to
these license amendment applications,
see the application for amendment
which is available for public inspection
in ADAMS and at the NRC’s PDR. For
additional direction on accessing
information related to this document,
see the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station Units 1, 2, and
3 (ONS), Oconee County, South
Carolina
Date of amendment request: July 20,
2016. Publicly-available version is in
ADAMS under Accession No.
ML16209A222.
Description of amendment request:
The proposed amendment requests to
revise the Technical Specifications
(TSs) associated with dry spent fuel
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
storage cask loading and unloading
requirements for ONS. Specifically, the
license amendment request would
revise TS 3.7.12, ‘‘Spent Fuel Pool
Boron Concentration’’; TS 3.7.18, ‘‘Dry
Spent Fuel Storage Cask Loading and
Unloading’’; and TS 4.4, ‘‘Dry Spent
Fuel Storage Cask Loading and
Unloading,’’ to remove certain TS
requirements that no longer pertain to
the ONS Independent Spent Fuel
Storage Facility general license, due to
changes in 10 CFR 50.68, ‘‘Criticality
accident requirements.’’
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below, with NRC edits in square
brackets:
1. Does the proposed change [amendment]
involve a significant increase in the
probability or consequences of an accident
previously evaluated?
Response: No.
The proposed changes to Technical
Specifications (TSs) 3.7.12, 3.7.18 and 4.4, do
not modify the method of nuclear fuel storage
or handling at Oconee Nuclear Station (ONS),
or make any physical changes to the facility
design, material, or construction standards.
The proposed change revises the criticality
requirements contained in the TSs, as
allowed by 10 CFR 50.68(c), that are
redundant to regulatory requirements
provided in 10 CFR part 72 and the Nuclear
Regulatory Commission (NRC)-approved
Certificate of Compliance (CoC) for the spent
fuel dry shielded canisters utilized at ONS.
The proposed change to the TS requirements
neither result[s] in operation that will
increase the probability of initiating an
analyzed event nor alter[s] assumptions
relative to mitigation of an accident or
transient event. The change has no effect on
the process variables, structures, systems,
and components that must be maintained
consistent with the safety analyses and
licensing basis.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes to TSs 3.7.12, 3.7.18
and 4.4, do not modify the method of nuclear
fuel storage or handling at ONS, nor make
any physical changes to the facility design,
material, or construction standards. The
change does not alter the plant configuration
(no new or different type of equipment will
be installed) or make changes in the methods
governing normal plant operation. The
proposed change to the ONS TS requirements
does not adversely impact the results of the
ONS safety analyses and is compliant with
the current licensing basis.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
10593
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any kind of accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed changes to TS 3.7.12, 3.7.18
and 4.4, do not modify the method of nuclear
fuel storage or handling at ONS, nor make
any physical changes to the facility design,
material, or construction standards. The
proposed changes comply with NRC
approved regulations and the station’s Part
72 and 50 licensing basis.
Therefore, the proposed TS change does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara S. Nichols,
Vice President Nuclear & EHS Legal
Support, Duke Energy Corporation, 526
South Church Street—EC07H, Charlotte,
NC 28202–1802.
NRC Branch Chief: Michael T.
Markley.
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station, Units 1, 2, and
3 (ONS), Oconee County, South
Carolina
Date of amendment request: July 21,
2016. Publicly-available version is in
ADAMS under Accession No.
ML16209A223.
Description of amendment request:
The proposed amendment requests to
revise the Technical Specifications
(TSs) for ONS. Specifically, the license
amendment request would revise TS
2.1.1.1, ‘‘Reactor Core Safety Limits
(SLs),’’ and TS 5.6.5, ‘‘Core Operating
Limits Report (COLR),’’ to allow the use
of the COPERNIC fuel performance
code.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below, with NRC edits in square
brackets:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change adds a limit on
maximum local fuel pin centerline
temperature to [the] ONS Technical
Specifications that is based on a[n] NRC
reviewed and approved fuel performance
E:\FR\FM\14FEN1.SGM
14FEN1
sradovich on DSK3GMQ082PROD with NOTICES
10594
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
code, and does not require a physical change
to plant systems, structures or components.
Plant operations and analysis will continue
to be in accordance with the ONS licensing
basis. The peak fuel centerline temperature is
the basis for protecting the fuel and is
consistent with the safety analysis.
The proposed change also adds a topical
report for a[n] NRC reviewed and approved
fuel performance code to the list of topical
reports in [the] ONS Technical
Specifications, which is administrative in
nature and has no impact on a plant
configuration or system performance relied
upon to mitigate the consequences of an
accident. The list of topical reports in the
Technical Specifications used to develop the
core operating limits does not impact either
the initiation of an accident or the mitigation
of its consequences.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change adds a limit on
maximum local fuel pin centerline
temperature to [the] ONS Technical
Specifications that is based on a[n] NRC
reviewed and approved fuel performance
code, and does not require a physical change
to plant systems, structures or components.
Specifying maximum local fuel pin
centerline temperature ensures that the fuel
design limits are met. Operations and
analysis will continue to be in compliance
with NRC regulations. The addition of a new
fuel pin centerline melt temperature versus
burnup relationship does not affect any
accident initiators that would create a new
accident.
The proposed change also adds a topical
report for a[n] NRC reviewed and approved
fuel performance code to the list of topical
reports in [the] ONS Technical
Specifications, which is administrative in
nature and has no impact on a plant
configuration or on system performance. The
proposed change updates the list of NRCapproved topical reports used to develop the
core operating limits. There is no change to
the parameters within which the plant is
normally operated. The possibility of a new
or different kind of accident is not created.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change to TS 2.1.1.1 adds a
limit on maximum local fuel pin centerline
temperature that is based on an NRC
reviewed and approved fuel performance
code, and does not require a physical change
to plant systems, structures or components.
Plant operations and analysis will continue
to be in accordance with [the] ONS licensing
basis.
Adding the local fuel pin centerline
temperature and burnup relationship defined
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
by the NRC reviewed and approved fuel
performance code to the ONS Technical
Specifications, does not impact the safety
margins established in the ONS licensing
basis.
The proposed change also adds a topical
report for a[n] NRC reviewed and approved
fuel performance code to the list of topical
reports in [the] ONS Technical
Specifications, which is administrative in
nature and does not amend the cycle specific
parameters presently required by the
Technical Specifications. The individual
Technical Specifications continue to require
operation of the plant within the bounds of
the limits specified in the Core Operating
Limits Report. The proposed change to the
list of analytical methods referenced in the
Core Operating Limits Report does not
impact the margin of safety.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara S. Nichols,
Vice President Nuclear & EHS Legal
Support, Duke Energy Corporation, 526
South Church Street—EC07H, Charlotte,
NC 28202–1802.
NRC Branch Chief: Michael T.
Markley.
Duke Energy Progress, LLC, Docket Nos.
50–325 and 50–324, Brunswick Steam
Electric Plant, Units 1 and 2 (BSEP),
Brunswick County, North Carolina
Duke Energy Carolinas, LLC, Docket
Nos. 50–413 and 50–414, Catawba
Nuclear Station, Units 1 and 2 (CNS),
York County, South Carolina
Duke Energy Progress, LLC, Docket No.
50–400, Shearon Harris Nuclear Power
Plant, Unit 1 (HNP), Wake County,
North Carolina
Duke Energy Carolinas, LLC, Docket
Nos. 50–369 and 50–370, McGuire
Nuclear Station, Units 1 and 2 (MNS),
Mecklenburg County, North Carolina
Duke Energy Carolinas, LLC, Docket
Nos. 50–269, 50–270, and 50–287,
Oconee Nuclear Station, Units 1, 2, and
3 (ONS), Oconee County, South
Carolina
Duke Energy Progress, LLC, Docket No.
50–261, H.B. Robinson Steam Electric
Plant, Unit No. 2 (RNP), Darlington
County, South Carolina
Duke Energy Carolinas, LLC, Docket
Nos. 52–018 and 52–019, William States
Lee III Nuclear Station, Units 1, and 2
(WLS), Cherokee County, South
Carolina
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Date of amendment request: April 29,
2016, as supplemented by letters dated
October 3, 2016, and January 16, 2017.
Publicly-available versions are in
ADAMS under Accession Nos.
ML16120A076, ML16277A521, and
ML17017A210, respectively.
Description of amendment request:
The NRC staff previously made a
proposed determination that the
amendment request dated April 29,
2016, involves no significant hazards
considerations (81 FR 43650; July 5,
2016). Subsequently, by letter dated
January 16, 2017, the licensee provided
additional information that expanded
the scope of the amendment request as
originally noticed. Accordingly, this
notice supersedes the previous notice in
its entirety.
The amendments would (1)
consolidate the Emergency Operations
Facilities (EOFs) for BSEP, HNP, and
RNP with the Duke Energy Progress,
LLC (Duke Energy) corporate EOF in
Charlotte, North Carolina; (2) decrease
the frequency for a multi-site drill from
once per 6 years to once per 8 years; (3)
allow the multi-site drill performance
with sites other than CNS, MNS, or
ONS, (4) change the BSEP, HNP, and
RNP augmentation times to be
consistent with those of the sites
currently supported by the Duke Energy
corporate EOF, and (5) decrease the
frequency of the unannounced
augmentation drill at BSEP from twice
per year to once per year. The January
16, 2017, letter also acknowledges the
addition of WLS to the Duke Energy
corporate EOF with the issuance of the
WLS operating license on December 19,
2016 (ADAMS Accession No.
ML16333A329).
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes relocate the BSEP,
HNP, and RNP EOFs from their present
onsite or near-site locations to the established
corporate EOF in Charlotte, North Carolina,
changes the required response times for
supplementing onsite personnel in response
to a radiological emergency, decreases the
multi-site drill frequency, allows the multisite drill to be performed with sites other
than ONS, MNS, or CNS, and decreases the
frequency of augmentation drills at BSEP.
The functions and capabilities of the
relocated EOFs will continue to meet the
applicable regulatory requirements. It has
E:\FR\FM\14FEN1.SGM
14FEN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
been evaluated and determined that the
change in response time does not
significantly affect the ability to supplement
the onsite staff. In addition, analysis shows
that the onsite staff can acceptably respond
to an event for longer than the requested time
for augmented staff to arrive. The proposed
changes have no effect on normal plant
operation or on any accident initiator or
precursors, and do not impact the function of
plant structures, systems, or components
(SSCs). The proposed changes do not alter or
prevent the ability of the emergency response
organization to perform its intended
functions to mitigate the consequences of an
accident or event.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes only impact the
implementation of the affected stations’
emergency plans by relocating their onsite or
near-site EOFs to the established corporate
EOF in Charlotte, North Carolina, changing
the required response time of responders
who supplement the onsite staff, decreasing
the multi-site drill frequency, allowing the
multi-site drill to be performed with sites
other than ONS, MNS, or CNS, and
decreasing the frequency of augmentation
drills at BSEP. The functions and capabilities
of the relocated EOFs will continue to meet
the applicable regulatory requirements. It has
been evaluated and determined that the
change in response time does not
significantly affect the ability to supplement
the onsite staff. In addition, analysis shows
that the onsite staff can acceptably respond
to an event for longer than the requested time
for augmented staff to arrive. The proposed
changes will not change the design function
or operation of SSCs. The changes do not
impact the accident analysis. The changes do
not involve a physical alteration of the plant,
a change in the method of plant operation,
or new operator actions. The proposed
changes do not introduce failure modes that
could result in a new accident, and the
changes do not alter assumptions made in the
safety analysis.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed changes only impacts the
implementation of the affected stations’
emergency plans by relocating their onsite or
near-site EOFs to the established corporate
EOF in Charlotte, North Carolina, changing
the required response time of responders
who supplement the onsite staff, decreasing
the multi-site drill frequency, allowing the
multi-site drill to be performed with sites
other than ONS, MNS, or CNS, and
decreasing the frequency of augmentation
drills at BSEP. The functions and capabilities
of the relocated EOFs will continue to meet
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
the applicable regulatory requirements. It has
been evaluated and determined that the
change in response time does not
significantly affect the ability to supplement
the onsite staff. In addition, analysis shows
that the onsite staff can acceptably respond
to an event for longer than the requested time
for augmented staff to arrive. Margin of safety
is associated with confidence in the ability of
the fission product barriers (i.e., fuel
cladding, reactor coolant system pressure
boundary, and containment structure) to
limit the level of radiation dose to the public.
The proposed changes are associated with
the emergency plans and do not impact
operation of the plant or its response to
transients or accidents. The changes do not
affect the Technical Specifications. The
changes do not involve a change in the
method of plant operation, and no accident
analyses will be affected by the proposed
changes. Safety analysis acceptance criteria
are not affected. The emergency plans will
continue to provide the necessary response
staff for emergencies as demonstrated by
staffing and functional analyses including the
necessary timeliness of performing major
tasks for the functional areas of the
emergency plans.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara S. Nichols,
Deputy General Counsel, Duke Energy
Corporation, 550 South Tyron Street,
Mail Code DEC45A, Charlotte, NC
28202.
NRC Branch Chief: Benjamin G.
Beasley.
Duke Energy Progress, LLC, Docket No.
50–400, Shearon Harris Nuclear Power
Plant (HNP), Unit 1, Wake and Chatham
Counties, North Carolina
Date of amendment request:
December 2, 2016. A publicly-available
version is in ADAMS under Accession
No. ML16337A249.
Description of amendment request:
The amendment would revise HNP
Technical Specifications (TSs) to
relocate selected figures and values from
the TSs to the Core Operating Limits
Report (COLR), remove all references to
a specific plant procedure as it pertains
to the COLR, and adopt Technical
Specification Task Force (TSTF)-5,
‘‘Delete Safety Limit Violation
Notification Requirements,’’ Revision 1,
which deletes duplicate notification,
reporting and restart requirements from
the Administrative Controls section of
TSs.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
10595
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
[Response: No.]
The proposed changes do not involve a
significant increase in the probability or
consequences of an accident previously
evaluated. The proposed changes are
administrative in nature, facilitate improved
content and presentation of Administrative
controls, and alter only the format and
location of cycle-specific parameter figures
and limits from the TS to the COLR. This
relocation does not result in the alteration of
the design, material, or construction
standards that were applicable prior to the
change. The proposed changes will not result
in modification of any system interface that
would increase the likelihood of an accident
since these events are independent of the
proposed change. The proposed amendment
will not change, degrade, or prevent actions,
or alter any assumptions previously made in
evaluating the radiological consequences of
an accident described in the Final Safety
Analysis Report (FSAR).
Therefore, the proposed changes do not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any previously evaluated?
[Response: No.]
The proposed changes do not create the
possibility of a new or different kind of
accident from any accident previously
evaluated. The proposed changes do not
involve any change to the configuration or
method of operation of any plant equipment.
Accordingly, no new failure modes have
been defined for any plant system or
component important to safety nor has any
new limiting single failure been identified as
a result of the proposed changes. Also, there
will be no change in types or increase in the
amounts of any effluents released offsite.
Therefore, the proposed changes do not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
[Response: No.]
The proposed changes do not involve a
significant reduction in a margin of safety.
Previously-approved methodologies will
continue to be used in determination of
cycle-specific core operating limits that are
present in the COLR. The proposed changes
are administrative in nature and will not
affect the plant design or system operating
parameters. As such, there is no detrimental
impact on any equipment design parameter
and the plant will continue to be operated
within prescribed limits.
E:\FR\FM\14FEN1.SGM
14FEN1
10596
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
Therefore, the proposed changes do not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Lara Nichols,
Deputy General Counsel, Duke Energy
Corporation, 550 South Tryon St., M/C
DEC45A, Charlotte, NC 28202.
NRC Branch Chief: Benjamin G.
Beasley.
sradovich on DSK3GMQ082PROD with NOTICES
Energy Northwest, Docket No. 50–397,
Columbia Generating Station, Benton
County, Washington
Date of amendment request:
November 8, 2016. A publicly-available
version is in ADAMS under Accession
No. ML16313A573.
Description of amendment request:
The proposed amendment would, on a
one-time basis, extend the Completion
Time by 7 days for Technical
Specification Conditions 3.5.1.A,
3.6.1.5.A, and 3.6.2.3.A. This onetime
extension will be used to support
preventive maintenance, which replaces
the residual heat removal train A
subsystem’s pump and motor.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment does not
increase the probability of an accident
because the residual heat removal (RHR)
system cannot initiate an accident. The RHR
system provides coolant injection to the
reactor core, cooling of the suppression pool
water inventory, and drywell sprays
following a design basis accident.
The proposed one time completion time
(CT) change for RHR train A does not alter
the conditions, operating configurations, or
minimum amount of operating equipment
assumed in the safety analysis for accident
mitigation. No changes are proposed in the
manner in which the emergency core cooling
system (ECCS) provides plant protection or
which create new modes of plant operation.
In addition, a probabilistic safety assessment
(PSA) evaluation concluded that the risk
contribution of the increased CT is a very
small increase in risk. The proposed change
in CT will not affect the probability of any
event initiators. There will be no degradation
in the performance of, or an increase in the
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
number of challenges imposed on, safety
related equipment assumed to function
during an accident situation. There will be
no change to normal plant operating
parameters or accident mitigation
performance.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any previously evaluated?
Response: No.
The proposed amendment will not create
the possibility of a new or different kind of
accident because inoperability of one RHR
subsystem is not an accident precursor.
There are no hardware changes nor are there
any changes in the method by which any
plant system performs a safety function. This
request does not affect the normal method of
plant operation. The proposed amendment
does not introduce new equipment, or new
way of operation of the system which could
create a new or different kind of accident. No
new external threats, release pathways, or
equipment failure modes are created. No new
accident scenarios, transient precursors,
failure mechanisms, or limiting single
failures are introduced as a result of this
request.
Therefore, the implementation of the
proposed amendment will not create a
possibility for an accident of a new or
different type than those previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
Columbia’s ECCS is designed with
sufficient redundancy such that a low
pressure ECCS subsystem may be removed
from service for maintenance or testing. The
remaining subsystems are capable of
providing water and removing heat loads to
satisfy the final safety analysis report (FSAR)
requirements for accident mitigation or plant
shutdown. A PSA evaluation concluded that
the risk contribution of the CT extension is
very small. There will be no change to the
manner in which safety limits or limiting
safety system settings are determined nor
will there be any change to those plant
systems necessary to assure the
accomplishment of protection functions.
There will be no change to post-LOCA peak
clad temperatures.
For these reasons, the proposed
amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: William A.
Horin, Esq., Winston & Strawn, 1700 K
Street NW., Washington, DC 20006–
3817.
NRC Branch Chief: Robert J.
Pascarelli.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Entergy Nuclear Operations, Inc.,
Docket No. 50–255, Palisades Nuclear
Plant, Van Buren County, Michigan
Date of amendment request:
November 9, 2016. A publicly-available
version is in ADAMS under Accession
No. ML16314A027.
Description of amendment request:
The proposed amendment would revise
Technical Specification (TS) 5.5.10,
‘‘Ventilation Filter Testing Program,’’ to
correct and modify the description of
the control room ventilation and fuel
handling area ventilation systems. In
addition, the proposed amendment
would correct an editorial omission in
TS Limiting Condition for Operation
3.0.9.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes to the Palisades
Nuclear Plant (PNP) Technical Specifications
(TS) are editorial or administrative in nature.
The changes make an editorial correction in
the TS, and correct and modify the
component descriptions in the ventilation
filter testing program TS. These changes do
not alter accident analysis assumptions, add
any initiators, or affect the function of plant
systems or the manner in which systems are
operated, maintained, modified, tested, or
inspected. The proposed changes do not
require any plant modifications which affect
the performance capability of the structures,
systems, and components relied upon to
mitigate the consequences of postulated
accidents, and have no impact on the
probability or consequences of an accident
previously evaluated.
Therefore, the proposed changes do not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes to the PNP TS are
editorial or administrative in nature. The
changes make an editorial correction in the
TS, and correct and modify the component
descriptions within the ventilation filter
testing program TS. The proposed changes do
not alter accident analysis assumptions, add
any initiators, or affect the function of plant
systems or the manner in which systems are
operated, maintained, modified, tested, or
inspected. The proposed changes do not
require any plant modifications which affect
the performance capability of the structures,
systems, and components relied upon to
mitigate the consequences of postulated
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
accidents, and do not create the possibility of
a new or different kind of accident from any
accident previously evaluated.
Therefore, the proposed changes do not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
Plant safety margins are established
through limiting conditions for operation,
limiting safety system settings, and safety
limits specified in the technical
specifications. The proposed changes to the
TS are editorial or administrative in nature
and do not impact any safety margins.
Because there is no impact on established
safety margins as a result of these changes,
the proposed change does not involve a
significant reduction in a margin of safety.
Therefore, the proposed changes do not
involve a significant reduction in a margin of
safety.
sradovich on DSK3GMQ082PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Jeanne Cho,
Senior Counsel, Entergy Services, Inc.,
440 Hamilton Ave., White Plains, NY
10601.
NRC Branch Chief: David J. Wrona.
Exelon Generation Company, LLC,
Docket Nos. 50–373 and 50–374, LaSalle
County Station (LSCS), Units 1 and 2,
LaSalle County, Illinois
Date of amendment request: October
26, 2016. A publicly-available version is
in ADAMS under Accession No.
ML16300A200.
Description of amendment request:
The proposed change revises TS 5.5.13,
‘‘Primary Containment Leakage Rate
Testing Program,’’ to allow for the
permanent extension of the Type A
Integrated Leak Rate Testing (ILRT) and
Type C Leak Rate Testing frequencies, to
change the documents used by LSCS to
implement the performance-based
leakage testing program, and to delete
the information regarding the
performance of the next LSCS Type A
tests to be performed.
Additionally, this license amendment
request (LAR) proposes to delete
Condition 2.D.(e) of the LSCS Unit 1
Renewed Facility Operating License
regarding conducting the third Type A
Test of each 10-year service period
when the plant is shutdown for the 10year plant inservice inspection (ISI).
Similarly, this LAR proposes to delete
Condition 2.D.(c) of the LSCS Unit 2
Renewed Facility Operating License
regarding conducting the third Type A
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
test of each 10-year service period when
the plant is shutdown for the 10 year
plant ISI.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment to the TS
involves the extension of the LSCS Type A
containment test interval to 15 years and the
extension of the Type C test interval to 75
months. The current Type A test interval of
120 months (10 years) would be extended on
a permanent basis to no longer than 15 years
from the last Type A test. The current Type
C test interval of 60 months for selected
components would be extended on a
performance basis to no longer than 75
months. Extensions of up to nine months
(total maximum interval of 84 months for
Type C tests) are permissible only for nonroutine emergent conditions.
The proposed extension does not involve
either a physical change to the plant or a
change in the manner in which the plant is
operated or controlled. The containment is
designed to provide an essentially leak tight
barrier against the uncontrolled release of
radioactivity to the environment for
postulated accidents. As such, the
containment and the testing requirements
invoked to periodically demonstrate the
integrity of the containment exist to ensure
the plant’s ability to mitigate the
consequences of an accident, and do not
involve the prevention or identification of
any precursors of an accident. The change in
dose risk for changing the Type A test
frequency from three-per-ten years to onceper-fifteen years, measured as an increase to
the total integrated dose risk for all internal
events accident sequences for LSCS, is
1.23E–02 person-rem/yr (0.33%) using the
EPRI [Electric Power Research Institute]
guidance with the base case corrosion
included. The change in dose risk drops to
3.15E–03 person-rem/yr (0.08%) when using
the EPRI Expert Elicitation methodology. The
values calculated per the EPRI guidance are
all lower than the acceptance criteria of ≤1.0
person-rem/yr or <1.0% person-rem/yr
defined in Section 1.3 of Attachment 3 of this
submittal. The results of the risk assessment
for this amendment meet these criteria.
Moreover, the risk impact for the ILRT
extension when compared to other severe
accident risks is negligible. Therefore, this
proposed extension does not involve a
significant increase in the probability of an
accident previously evaluated.
As documented in NUREG–1493, Type B
and C tests have identified a very large
percentage of containment leakage paths, and
the percentage of containment leakage paths
that are detected only by Type A testing is
very small. The LSCS Type A test history
supports this conclusion.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
10597
The integrity of the containment is subject
to two types of failure mechanisms that can
be categorized as: (1) Activity based and (2)
time based. Activity based failure
mechanisms are defined as degradation due
to system and/or component modifications or
maintenance. Local leak rate test
requirements and administrative controls
such as configuration management and
procedural requirements for system
restoration ensure that containment integrity
is not degraded by plant modifications or
maintenance activities. The design and
construction requirements of the
containment combined with the containment
inspections performed in accordance with
ASME [American Society of Mechanical
Engineers] Section XI and TS requirements
serve to provide a high degree of assurance
that the containment would not degrade in a
manner that is detectable only by a Type A
test. Based on the above, the proposed
extensions do not significantly increase the
consequences of an accident previously
evaluated.
The proposed amendment also deletes
exceptions previously granted to allow onetime extensions of the ILRT test frequency for
LSCS. These exceptions were for activities
that would have already taken place by the
time this amendment is approved; therefore,
their deletion is solely an administrative
action that has no effect on any component
and no impact on how the unit is operated.
Therefore, the proposed change does not
result in a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed amendment to the TS
involves the extension of the LSCS Type A
containment test interval to 15 years and the
extension of the Type C test interval to 75
months. The containment and the testing
requirements to periodically demonstrate the
integrity of the containment exist to ensure
the plant’s ability to mitigate the
consequences of an accident do not involve
any accident precursors or initiators. The
proposed change does not involve a physical
change to the plant (i.e., no new or different
type of equipment will be installed) or a
change to the manner in which the plant is
operated or controlled.
The proposed amendment also deletes
exceptions previously granted to allow onetime extensions of the ILRT test frequency for
LSCS. These exceptions were for activities
that would have already taken place by the
time this amendment is approved; therefore,
their deletion is solely an administrative
action that does not result in any change in
how the unit is operated.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed amendment to TS 5.5.13
involves the extension of the LSCS Type A
E:\FR\FM\14FEN1.SGM
14FEN1
10598
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
containment test interval to 15 years and the
extension of the Type C test interval to 75
months for selected components. This
amendment does not alter the manner in
which safety limits, limiting safety system set
points, or limiting conditions for operation
are determined. The specific requirements
and conditions of the TS Containment Leak
Rate Testing Program exist to ensure that the
degree of containment structural integrity
and leak-tightness that is considered in the
plant safety analysis is maintained. The
overall containment leak rate limit specified
by TS is maintained.
The proposed change involves only the
extension of the interval between Type A
containment leak rate tests and Type C tests
for LSCS. The proposed surveillance interval
extension is bounded by the 15-year ILRT
Interval and the 75-month Type C test
interval currently authorized within NEI
[Nuclear Energy Institute] 94–01, Revision 3–
A. Industry experience supports the
conclusion that Type B and C testing detects
a large percentage of containment leakage
paths and that the percentage of containment
leakage paths that are detected only by Type
A testing is small. The containment
inspections performed in accordance with
ASME Section XI and TS serve to provide a
high degree of assurance that the
containment would not degrade in a manner
that is detectable only by Type A testing. The
combination of these factors ensures that the
margin of safety in the plant safety analysis
is maintained. The design, operation, testing
methods and acceptance criteria for Type A,
B, and C containment leakage tests specified
in applicable codes and standards would
continue to be met, with the acceptance of
this proposed change, since these are not
affected by changes to the Type A and Type
C test intervals.
The proposed amendment also deletes
exceptions previously granted to allow one
time extensions of the ILRT test frequency for
LSCS. These exceptions were for activities
that would have already taken place by the
time this amendment is approved; therefore,
their deletion is solely an administrative
action and does not change how the unit is
operated and maintained. Thus, there is no
reduction in any margin of safety.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
requested amendments involve no
significant hazards consideration.
Attorney for licensee: Tamra Domeyer,
Associate General Counsel, Exelon
Generation Company, LLC, 4300
Winfield Road, Warrenville, IL 60555.
NRC Branch Chief: David J. Wrona.
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
South Carolina Electric & Gas Company
(SCE&G) and South Carolina Public
Service Authority, Docket Nos. 52–027
and 52–028, Virgil C. Summer Nuclear
Station (VCSNS) Units 2 and 3, Fairfield
County, South Carolina
Date of amendment request:
November 10, 2016. A publiclyavailable version is in ADAMS under
Accession No. ML16316A003.
Description of amendment request:
The amendment request proposes to add
to License Condition 2.D.(1) of the
VCSNS Units 2 and 3 combined licenses
(COLs), an Interim Amendment Request
process for changes during construction
when emergent conditions are present.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented below
with NRC staff edits in square brackets:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment would add an
Interim Amendment Request process to
Condition 2.D.(1) of the VCSNS 2 and 3 COLs
to allow construction to continue, at SCE&G’s
own risk, in emergent conditions, where a
non-conforming condition that has little or
no safety significance is discovered and the
work activity cannot be adjusted. The Interim
Amendment Request process would require
SCE&G to submit a Nuclear Construction
Safety Assessment which (1) identifies the
proposed change; (2) evaluates whether
emergent conditions are present; (3)
evaluates whether the change would result in
any material decrease in safety; and (4)
evaluates whether continued construction
would make the non-conforming condition
irreversible. Only if the continued
construction would have no material
decrease in safety would the NRC issue a
determination that construction could
continue pending SCE&G’s initiation of the
COL–ISG–025 PAR [preliminary amendment
request]/LAR [license amendment request]
process. The requirement to include a
Nuclear Construction Safety Assessment
ensures that the proposed amendment would
not involve a significant increase in the
probability or consequences of an accident
previously evaluated. If the continued
construction would result a material decrease
in safety, then continued construction would
not be authorized.
The proposed amendment does not modify
the design, construction, or operation of any
plant structures, systems, or components
(SSCs), nor does it change any procedures or
method of control for any SSCs. Because the
proposed amendment does not change the
design, construction, or operation of any
SSCs, it does not adversely affect any design
function as described in the Updated Final
Safety Analysis Report.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
The proposed amendment does not affect
the probability of an accident previously
evaluated. Similarly, because the proposed
amendment does not alter the design or
operation of the nuclear plant or any plant
SSCs, the proposed amendment does not
represent a change to the radiological effects
of an accident, and therefore, does not
involve an increase in the consequences of an
accident previously evaluated.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed amendment would add an
Interim Amendment Request process to
Condition 2.D.(1) of the VCSNS 2 and 3 COLs
to allow construction to continue, at SCE&G’s
own risk, in emergent conditions, where a
non-conforming condition that has little or
no safety significance is discovered and the
work activity cannot be adjusted. The Interim
Amendment Request process would require
SCE&G to submit a Nuclear Construction
Safety Assessment which (1) identifies the
proposed change; (2) evaluates whether
emergent conditions are present; (3)
evaluates whether the change would result in
any material decrease in safety; and (4)
evaluates whether continued construction
would make the non-conforming condition
irreversible. Only if the continued
construction would have no material
decrease in safety would NRC issue a
determination that construction could
continue pending SCE&G’s initiation of the
COL–ISG–025 PAR/LAR process.
The proposed amendment is not a
modification, addition to, or removal of any
plant SSCs. Furthermore, the proposed
amendment is not a change to procedures or
method of control of the nuclear plant or any
plant SSCs. The proposed amendment only
adds a new screening process and does not
change the design, construction, or operation
of the nuclear plant or any plant operations.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed amendment would add an
Interim Amendment Request process to
Condition 2.D.(1) of the VCSNS 2 and 3 COLs
to allow construction to continue, at SCE&G’s
own risk, in emergent conditions, where a
non-conforming condition that has little or
no safety significance is discovered and the
work activity cannot be adjusted. The Interim
Amendment Request process would require
SCE&G to submit a Nuclear Construction
Safety Assessment which (1) identifies the
proposed change; (2) evaluates whether
emergent conditions are present; (3)
evaluates whether the change would result in
any material decrease in safety; and (4)
evaluates whether continued construction
would make the non-conforming condition
irreversible. Only if the continued
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
construction would have no material
decrease in safety would the NRC issue
determination that construction could
continue pending SCE&G’s initiation of the
COL–ISG–025 PAR/LAR process.
The proposed amendment is not a
modification, addition to, or removal of any
plant SSCs. Furthermore, the proposed
amendment is not a change to procedures or
method of control of the nuclear plant or any
plant SSCs. The proposed amendment does
not alter any design function or safety
analysis. Consequently, no safety analysis or
design basis acceptance limit/criterion is
challenged or exceeded by the proposed
amendment, thus the margin of safety is not
reduced. The only impact of this activity is
the addition of an Interim Amendment
Request process.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
sradovich on DSK3GMQ082PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: M. Stanford
Blanton, Balch & Bingham LLP, 1710
Sixth Avenue North, Birmingham, AL
35203–2015.
NRC Branch Chief: Jennifer DixonHerrity.
South Carolina Electric & Gas Company
and South Carolina Public Service
Authority, Docket Nos. 52–027 and 52–
028, Virgil C. Summer Nuclear Station,
Units 2 and 3, Fairfield, South Carolina
Date of amendment request:
September 15, 2016. A publiclyavailable version is in ADAMS under
Accession No. ML16259A315.
Description of amendment request:
The amendment request proposes
changes to the Updated Final Safety
Analysis Report (UFSAR) in the form of
departures from the incorporated plantspecific Design Control Document Tier
2 information and a combined license
(COL) License Condition which
references one of the proposed changes.
Additionally, the proposed changes to
the UFSAR eliminate pressurizer spray
line monitoring during pressurizer surge
line first plant only testing. In addition,
these proposed changes correct
inconsistencies in testing purpose,
testing duration, and the ability to leave
equipment in place following the data
collection period. These changes
involve material which is specifically
referenced in Section 2.D.(2) of the COL.
This submittal requests approval of the
license amendment necessary to
implement these changes.
Basis for proposed no significant
hazards consideration determination:
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented below
with NRC staff edits in square brackets:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The design functions of the RCS [reactor
coolant system] include providing an
effective reactor coolant pressure boundary.
The proposed changes for removing the
requirement to install temporary
instrumentation on the pressurizer spray line
during the monitoring of the pressurizer
surge line for thermal stratification and
thermal cycling during hot functional testing
and during the first fuel cycle for the first
plant only, proposed changes to parameter
retention requirements, and proposed change
to remove the pressurizer spray and surge
line valve leakage requirement do not impact
the existing design requirements for the RCS.
These changes are acceptable as they are
consistent with the commitments made for
the pressurizer surge line monitoring
program for the first plant only, and do not
adversely affect the capability of the
pressurizer surge line and pressurizer spray
lines to perform the required reactor coolant
pressure boundary design functions.
These proposed changes to the monitoring
of the pressurizer surge line for thermal
stratification and thermal cycling during hot
functional testing and during the first fuel
cycle for the first plant only, proposed
changes to parameter retention requirements,
and proposed change to remove the
pressurizer spray and surge line valve
leakage requirement as described in the
current licensing basis do not have an
adverse effect on any of the design functions
of the systems. The proposed changes do not
affect the support, design, or operation of
mechanical and fluid systems required to
mitigate the consequences of an accident.
There is no change to plant systems or the
response of systems to postulated accident
conditions. There is no change to the
predicted radioactive releases due to
postulated accident conditions. The plant
response to previously evaluated accidents or
external events is not adversely affected, nor
do the proposed changes create any new
accident precursors.
Therefore, the requested amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes for removing the
requirement to install temporary
instrumentation on the pressurizer spray line
during the monitoring of the pressurizer
surge line for thermal stratification and
thermal cycling during hot functional testing
and during the first fuel cycle for the first
plant only, proposed changes to parameter
retention requirements, and proposed change
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
10599
to remove the pressurizer spray and surge
line valve leakage requirement as described
in the current licensing basis maintain the
required design functions, and are consistent
with other Updated Final Safety Analysis
Report (UFSAR) information. The proposed
changes do not adversely affect the design
requirements for the RCS, including the
pressurizer surge line and pressurizer spray
lines. The proposed changes do not adversely
affect the design function, support, design, or
operation of mechanical and fluid systems.
The proposed changes do not result in a new
failure mechanism or introduce any new
accident precursors. No design function
described in the UFSAR is adversely affected
by the proposed changes.
Therefore, the requested amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
No safety analysis or design basis
acceptance limit/criterion is challenged or
exceeded by the proposed changes, and no
margin of safety is reduced. Therefore, the
requested amendment does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius, LLC,
1111 Pennsylvania Ave. NW.,
Washington, DC 20004–2514.
NRC Branch Chief: Jennifer DixonHerrity.
South Carolina Electric & Gas Company
and South Carolina Public Service
Authority, Docket Nos. 52–027 and 52–
028, Virgil C. Summer Nuclear Station,
Units 2 and 3, Fairfield, South Carolina
Date of amendment request:
November 16, 2016. A publiclyavailable version is in ADAMS under
Accession No. ML16323A020.
Description of amendment request:
The amendment request proposes
changes to plant-specific Tier 1
information, with corresponding
changes to the associated Combined
License (COL) Appendix C information,
and involves associated Tier 2
information in the Updated Final Safety
Analysis Report (UFSAR). Specifically,
the requested amendment proposes
clarifications to a plant-specific Tier 1
(and COL Appendix C) table and a
UFSAR table in regard to the
inspections of the excore source,
intermediate, and power range
detectors. Pursuant to the provisions of
10 CFR 52.63(b)(1), an exemption from
E:\FR\FM\14FEN1.SGM
14FEN1
10600
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
elements of the design as certified in the
10 CFR part 52, appendix D, design
certification rule is also requested for
the plant-specific Design Control
Document Tier 1 material departures.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented below
with NRC staff’s edits in square
brackets:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change to specify the
inspection of the excore source, intermediate,
and power range detectors is done to verify
that aluminum surfaces are contained in
stainless steel or titanium, and avoids the
introduction of aluminum into the post-loss
of coolant accident (LOCA) containment
environment due to detector materials. The
proposed change does not alter any safety
related functions. The materials of
construction are compatible with the postLOCA conditions inside containment and
will not significantly contribute to hydrogen
generation or chemical precipitates. The
change does not affect the operation of any
systems or equipment that initiate an
analyzed accident or alter any structures,
systems, and components (SSC) accident
initiator or initiating sequence of events.
The change does not impact the support,
design, or operation of mechanical and fluid
systems. There is no change to plant systems
or the response of systems to postulated
accident conditions. There is no change to
the predicted radioactive releases due to
normal operation or postulated accident
conditions. Consequently, the plant response
to previously evaluated accidents or external
events is not adversely affected, nor does the
proposed change create any new accident
precursors.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change does not affect the
operation of any systems or equipment that
may initiate a new or different kind of
accident, or alter any SSC such that a new
accident initiator or initiating sequence of
events is created. The proposed change to
specify the inspection of the excore source,
intermediate, and power range detectors is
done to verify that aluminum surfaces are
contained in stainless steel or titanium, and
avoids the introduction of aluminum into the
post-LOCA containment environment due to
detector materials. In addition, the proposed
change to the ITAAC [inspections, tests,
analysis, and acceptance criteria] verified
materials of construction does not alter the
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
design function of the excore detectors. The
detector canning materials of construction
are compatible with the post-LOCA
containment environment and do not
contribute a significant amount of hydrogen
or chemical precipitates. The change to the
ITAAC aligns the inspection with the Tier 2
design feature. Consequently, because the
excore detectors functions are unchanged,
there are no adverse effects on accidents
previously evaluated in the UFSAR.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change to specify the
inspection of the excore source, intermediate,
and power range detectors is done to verify
that aluminum surfaces are contained in
stainless steel or titanium, and avoids the
introduction of aluminum into the postLOCA containment environment, does not
alter any safety-related equipment, applicable
design codes, code compliance, design
function, or safety analysis. Consequently, no
safety analysis or design basis acceptance
limit/criterion is challenged or exceeded by
the proposed change, thus the margin of
safety is not reduced.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Ms. Kathryn M.
Sutton, Morgan, Lewis & Bockius, LLC,
1111 Pennsylvania Avenue NW.,
Washington, DC 20004–2514.
NRC Branch Chief: Jennifer DixonHerrity.
Southern California Edison Company, et
al., Docket Nos. 50–206, 50–361, and
50–362, San Onofre Nuclear Generating
Station (SONGS), Units 1, 2, and 3, San
Diego County, California
Date of amendment request:
December 15, 2016. A publicly-available
version is in ADAMS under Accession
No. ML16355A014.
Description of amendment request:
The proposed amendment would revise
the Facility Operating Licenses and
associated Technical Specifications (TS)
for SONGS, Units 1, 2, and 3, to reflect
removal of all spent nuclear fuel from
the SONGS, Units 2 and 3 spent fuel
pools (SFPs) and its transfer to dry cask
storage within an onsite independent
spent fuel storage installation (ISFSI).
The proposed changes would also make
conforming changes to the SONGS, Unit
1 TS and combine them with the
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
SONGS, Units 2 and 3 TS. These
changes will more fully reflect the
permanently shutdown and defueled
status of the facility, as well as the
reduced scope of structures, systems,
and components necessary to ensure
plant safety once all spent fuel has been
permanently moved to the SONGS
ISFSI, an activity which is currently
scheduled for completion in 2019.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed amendment would modify
the SONGS, Units 2 and 3 facility operating
licenses and TS by deleting the portions of
the licenses and TSs that are no longer
applicable to a facility with no spent nuclear
fuel stored in the SFP, while modifying the
remaining portions to correspond to all
nuclear fuel stored within an ISFSI. This
amendment becomes effective upon removal
of all spent nuclear fuel from the SONGS,
Units 2 and 3 SFP and its transfer to dry cask
storage within an ISFSI.
Additionally, the proposed change would
revise the Unit 1 TSs for consistency with the
proposed changes to the Units 2 and 3 TSs.
Similar to the changes for Units 2 and 3, the
Unit 1 changes delete portions of the TSs that
are no longer applicable to a facility with
spent fuel no longer stored in the SFP, while
modifying the remaining portions to
correspond to all nuclear fuel in dry storage.
The Unit 1 TSs are also proposed to be
combined with the Units 2 and 3 TSs.
The definition of safety-related Structures,
Systems, and Components (SSCs) in 10 CFR
50.2 states that safety-related SSCs are those
relied on to remain functional during and
following design basis events to assure:
1. The integrity of the reactor coolant
boundary;
2. The capability to shutdown the reactor
and maintain it in a safe shutdown condition;
or
3. The capability to prevent or mitigate the
consequences of accidents which could
result in potential offsite exposures
comparable to the applicable guideline
exposures set forth in 10 CFR 50.43(a)(1) or
100.11.
The first two criteria (integrity of the
reactor coolant pressure boundary and safe
shutdown of the reactor) are not applicable
to a plant in a permanently defueled
condition. The third criterion is related to
preventing or mitigating the consequences of
accidents that could result in potential offsite
exposures exceeding limits. However, after
all nuclear spent fuel assemblies have been
transferred to dry cask storage within an
ISFSI, none of the SSCs at SONGS, Units 2
and 3 are required to be relied on for accident
mitigation. Therefore, none of the SSCs at
E:\FR\FM\14FEN1.SGM
14FEN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
SONGS, Units 2 and 3 meet the definition of
a safety-related SSC stated in 10 CFR 50.2.
The proposed deletion of requirements in the
TSs is not related to any systems credited in
an accident analysis at SONGS, Units 2 and
3.
Chapter 15 of the SONGS, Units 2 and 3
Updated Final Safety Analysis Report
(UFSAR) described the design basis accidents
(DBAs) related to the SFP. The majority of
these postulated accidents are predicated on
spent fuel being stored in the SFP. With the
removal of the spent fuel from the SFP, there
are no remaining spent fuel assemblies to be
monitored and there are no credible
accidents that require the actions of a
Certified Fuel Handler, Shift Manager, or a
Certified Operator to prevent occurrence or
mitigate the consequences of an accident.
With all of the SONGS 1 operating plant
above-ground structures having been
demolished and removed, and all Unit 1
spent fuel having been removed from the
SFP, there are no remaining design basis
accidents or transients in Chapter 8 of the
Unit 1 Defueled Safety Analysis Report
(DSAR).
The proposed changes do not have an
adverse impact on the remaining
decommissioning activities or any of their
potential consequences.
The proposed changes related to the
relocation of certain administrative
requirements do not affect operating
procedures or administrative controls that
have the function of preventing or mitigating
any accidents applicable to the safe
management of irradiated fuel or
decommissioning of the facility.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes eliminate the
operational requirements and certain design
requirements associated with the storage of
the spent fuel in the SFP, and relocate certain
administrative controls to the
Decommissioning Quality Assurance
Program or Licensee Controlled
Specifications (LCS).
After the removal of the spent fuel from the
Units 2 and 3 SFP and transfer to the ISFSI,
there are no spent fuel assemblies that
remain in a SFP on site. Coupled with a
prohibition against storage of fuel in the
Units 2 and 3 SFP (the Unit 1 SFP has been
dismantled), the potential for fuel related
accidents is removed. The proposed changes
do not introduce any new failure modes.
Therefore, the proposed amendment does
not create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The removal of all spent nuclear fuel from
the SFPs into storage in casks within an
ISFSI, coupled with a prohibition against
future storage of fuel within the Units 2 and
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
3 SFPs (the Unit 1 SFP has been dismantled),
removes the potential for fuel related
accidents.
The design basis and accident assumptions
within the SONGS, Units 1, 2 and 3 UFSARs
and the TSs relating to safe management and
safe storage of spent fuel in the SFP are no
longer applicable. The proposed changes do
not affect remaining plant operations,
systems, or components supporting
decommissioning activities.
The proposed deletion of TS requirements
is not related to any SSCs that will be
credited in the accident analysis for an
applicable postulated accident. As a result,
the proposed deletions do not affect the
margin of safety associated with the accident
analysis.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Walker A.
Matthews, Esquire, Southern California
Edison Company, 2244 Walnut Grove
Avenue, Rosemead, California 91770.
NRC Branch Chief: Bruce Watson.
Southern California Edison Company, et
al., Docket Nos. 50–206, 50–361, and
50–362, San Onofre Nuclear Generating
Station (SONGS), Units 1, 2, and 3, San
Diego County, California
Date of amendment request:
December 15, 2016. A publicly-available
version is in ADAMS under Accession
No. ML16355A015.
Description of amendment request:
The proposed amendment would revise
the Permanently Defueled Emergency
Plan into an Independent Spent Fuel
Storage Facility Installation (ISFSl)Only Emergency Plan, and revise the
Emergency Action Level (EAL) scheme
into an ISFSl-Only EAL scheme, for
SONGS, Units 1, 2, and 3. The proposed
changes would more fully reflect the
permanently shutdown and defueled
status of the facility, as well as the
reduced scope of potential radiological
accidents once all spent fuel has been
moved to dry cask storage within the
onsite SONGS ISFSI, an activity which
is currently scheduled for completion in
2019.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
10601
consequences of an accident previously
evaluated?
Response: No.
The proposed amendments would modify
the SONGS, Units 1, 2 and 3 licenses by
revising the emergency plan and revising the
EAL scheme. The SONGS units have
permanently ceased operation and are
permanently defueled. The proposed
amendments are conditioned on all spent
nuclear fuel being removed from wet storage
in the spent fuel pools and placed in dry
storage within an ISFSI. Occurrence of
postulated accidents associated with spent
fuel stored in a spent fuel pool is no longer
credible in a spent fuel pool devoid of such
fuel. The proposed amendments have no
effect on plant systems, structures, and
components (SSCs) and no effect on the
capability of any plant SSC to perform its
design function. The proposed amendments
would not increase the likelihood of the
malfunction of any plant SSC. The proposed
amendments would have no effect on any of
the previously evaluated accidents in the
SONGS Updated Final Safety Analysis
Report (UFSAR).
Since SONGS has permanently ceased
operation, the generation of fission products
has ceased and the remaining source term
continues to decay. This continues to
significantly reduce the consequences of
previously postulated accidents.
Therefore, the proposed amendments do
not involve a significant increase in the
consequences of a previously evaluated
accident.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed amendments constitute a
revision of the emergency planning function
commensurate with the ongoing and
anticipated reduction in radiological source
term at SONGS.
The proposed amendments do not involve
a physical alteration of the plant. No new or
different types of equipment will be installed
and there are no physical modifications to
existing equipment as a result of the
proposed amendments. Similarly, the
proposed amendments would not physically
change any SSCs involved in the mitigation
of any postulated accidents. Thus, no new
initiators or precursors of a new or different
kind of accident are created. Furthermore,
the proposed amendments do not create the
possibility of a new failure mode associated
with any equipment or personnel failures.
The credible events for the ISFSI remain
unchanged.
Therefore, the proposed amendments do
not create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
Because the 10 CFR part 50 licenses for
SONGS no longer authorize operation of the
reactors or emplacement or retention of fuel
into the reactor vessels, as specified in 10
CFR 50.82(a)(2), the occurrence of postulated
accidents associated with reactor operation is
E:\FR\FM\14FEN1.SGM
14FEN1
10602
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
no longer credible. With all nuclear spent
fuel transferred out of wet storage from the
spent fuel pools and placed in dry storage
within the ISFSI, a fuel handling accident is
no longer credible. There are no longer
credible events that would result in any
releases beyond the Exclusion Area
Boundary (EAB) exceeding the U.S.
Environmental Protection Agency (EPA)
Protective Action Guideline (PAG) exposure
levels, as detailed in the EPA’s ‘‘Protective
Action Guide and Planning Guidance for
Radiological Incidents,’’ Draft for Interim Use
and Public Comment dated March 2013 (PAG
Manual).
The proposed amendments do not involve
a change in the plant’s design, configuration,
or operation. The proposed amendments do
not affect either the way in which the plant
structures, systems, and components perform
their safety function or their design margins.
Because there is no change to the physical
design of the plant, there is no change to any
of these margins.
Therefore, the proposed amendments do
not involve a significant reduction in a
margin of safety.
sradovich on DSK3GMQ082PROD with NOTICES
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Walker A.
Matthews, Esquire, Southern California
Edison Company, 2244 Walnut Grove
Avenue, Rosemead, California 91770.
NRC Branch Chief: Bruce Watson.
Southern Nuclear Operating Company,
Docket Nos. 52–025 and 52–026, Vogtle
Electric Generating Plant, Units 3 and 4,
Burke County, Georgia
Date of amendment request: August
31, 2016. A publicly-available version is
in ADAMS under Accession No.
ML16244A253.
Description of amendment request:
The amendment request proposes
changes to the Updated Final Safety
Analysis Report (UFSAR) in the form of
departures from the incorporated plantspecific Design Control Document
(DCD) Tier 2 information and a
combined license (COL) License
Condition which references one of the
proposed changes. Additionally, the
proposed changes to the UFSAR
eliminate pressurizer spray line
monitoring during pressurizer surge line
first plant only testing. In addition,
these proposed changes correct
inconsistencies in testing purpose,
testing duration, and the ability to leave
equipment in place following the data
collection period. These changes
involve material which is specifically
referenced in Section 2.D.(2) of the
COLs. This submittal requests approval
VerDate Sep<11>2014
17:41 Feb 13, 2017
Jkt 241001
of the license amendment necessary to
implement these changes.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented below
with NRC staff edits in square brackets:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The design functions of the RCS [reactor
coolant system] include providing an
effective reactor coolant pressure boundary.
The proposed changes for removing the
requirement to install temporary
instrumentation on the pressurizer spray line
during the monitoring of the pressurizer
surge line for thermal stratification and
thermal cycling during hot functional testing
and during the first fuel cycle for the first
plant only, proposed changes to parameter
retention requirements, and proposed change
to remove the pressurizer spray and surge
line valve leakage requirement do not impact
the existing design requirements for the RCS.
These changes are acceptable as they are
consistent with the commitments made for
the pressurizer surge line monitoring
program for the first plant only, and do not
adversely affect the capability of the
pressurizer surge line and pressurizer spray
lines to perform the required reactor coolant
pressure boundary design functions.
These proposed changes to the monitoring
of the pressurizer surge line for thermal
stratification and thermal cycling during hot
functional testing and during the first fuel
cycle for the first plant only, proposed
changes to parameter retention requirements,
and proposed change to remove the
pressurizer spray and surge line valve
leakage requirement as described in the
current licensing basis do not have an
adverse effect on any of the design functions
of the systems. The proposed changes do not
affect the support, design, or operation of
mechanical and fluid systems required to
mitigate the consequences of an accident.
There is no change to plant systems or the
response of systems to postulated accident
conditions. There is no change to the
predicted radioactive releases due to
postulated accident conditions. The plant
response to previously evaluated accidents or
external events is not adversely affected, nor
do the proposed changes create any new
accident precursors.
Therefore, the requested amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes for removing the
requirement to install temporary
instrumentation on the pressurizer spray line
during the monitoring of the pressurizer
surge line for thermal stratification and
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
thermal cycling during hot functional testing
and during the first fuel cycle for the first
plant only, proposed changes to parameter
retention requirements, and proposed change
to remove the pressurizer spray and surge
line valve leakage requirement as described
in the current licensing basis maintain the
required design functions, and are consistent
with other Updated Final Safety Analysis
Report (UFSAR) information. The proposed
changes do not adversely affect the design
requirements for the RCS, including the
pressurizer surge line and pressurizer spray
lines. The proposed changes do not adversely
affect the design function, support, design, or
operation of mechanical and fluid systems.
The proposed changes do not result in a new
failure mechanism or introduce any new
accident precursors. No design function
described in the UFSAR is adversely affected
by the proposed changes.
Therefore, the requested amendment does
not create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
No safety analysis or design basis
acceptance limit/criterion is challenged or
exceeded by the proposed changes, and no
margin of safety is reduced.
Therefore, the requested amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: M. Stanford
Blanton, Balch & Bingham LLP, 1710
Sixth Avenue North, Birmingham, AL
35203–2015.
NRC Branch Chief: Jennifer DixonHerrity.
III. Notice of Issuance of Amendments
to Facility Operating Licenses and
Combined Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and (3)
the Commission’s related letter, Safety
Evaluation and/or Environmental
Assessment as indicated. All of these
items can be accessed as described in
the ‘‘Obtaining Information and
Submitting Comments’’ section of this
document.
Dominion Nuclear Connecticut, Inc.,
Docket No. 50–336, Millstone Power
Station, Unit No. 2, New London
County, Connecticut
Date of amendment request: May 25,
2016, as supplemented by letters dated
June 15, 2016, and October 18, 2016.
Brief description of amendment: The
amendment revised the Millstone Power
Station, Unit No. 2, Technical
Specifications (TSs) to add the
evaluation model EMF–2103(P)(A),
Revision 3, ‘‘Realistic Large Break LOCA
Methodology for Pressurized Water
Reactors’’ (ADAMS Package Accession
No. ML16286A579), to the TS Section
6.9.1.8.b list of analytical methods use
to establish core operating limits.
Date of issuance: January 24, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 332. A publiclyavailable version is in ADAMS under
Accession No. ML17025A218;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–65: Amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: August 30, 2016 (81 FR
59662). The supplemental letters dated
June 15, 2016, and October 18, 2016,
provided additional information that
clarified the application, did not expand
the scope of the application as originally
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 24,
2017.
No significant hazards consideration
comments received: No.
Entergy Nuclear Operations, Inc.,
Docket No. 50–286, Indian Point
Nuclear Generating Unit No. 3,
Westchester County, New York
Entergy Nuclear Operations, Inc.,
Docket No. 50–333, James A. FitzPatrick
Nuclear Power Plant, Oswego County,
New York
Date of amendment request: August
16, 2016.
Brief description of amendments: The
amendments modified license
conditions to reflect the transfer of the
Master Decommissioning Trust from the
Power Authority of the State of New
York to Entergy Nuclear Operations,
Inc., and deletes other conditions so as
to apply the requirements of 10 CFR
50.75(h)(1).
Date of issuance: January 30, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: 262 (Indian Point
Nuclear Generating Unit No. 3); 313
(James A. FitzPatrick Nuclear Power
Plant). A publicly-available version is in
ADAMS under Accession No.
ML17025A288; documents related to
these amendments are listed in the
Safety Evaluation enclosed with the
letter dated January 27, 2017 (ADAMS
Package Accession No. ML16336A488).
Facility Operating License Nos. DPR–
64 and DPR–59: Amendments revised
the Facility Operating Licenses.
Date of initial notice in Federal
Register: September 27, 2016 (81 FR
66305).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 27,
2017.
Entergy Nuclear Operations, Inc.,
Docket No. 50–333, James A. FitzPatrick
Nuclear Power Plant, Oswego County,
New York
Date of amendment request: August
29, 2016, as supplemented by letter
dated November 21, 2016.
Brief description of amendment: The
amendment revised Technical
Specification 5.5.6, ‘‘Primary
Containment Leakage Rate Testing
Program,’’ to allow permanent extension
of Type A and Type C leak rate test
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
10603
intervals through the adoption of
Revision 3–A of Nuclear Energy
Institute (NEI) 94–01 and the limitations
and conditions specified in Revision 2–
A of NEI 94–01 as the guidance
documents for implementation of
performance-based Option B of
appendix J to 10 CFR part 50, Option B,
‘‘Performance-Based Requirements.’’
Based on the guidance in Revision 3–A
of NEI 94–01, the change allows the
maximum interval for the Type A
primary containment integrated leakage
rate test to extend from once in 10 years
to once in 15 years, and the Type C local
leak rate test interval to extend to 75
months, provided acceptable
performance history and other
requirements are maintained.
Date of issuance: January 24, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 132. A publiclyavailable version is in ADAMS under
Accession No. ML17009A372;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–59: The amendment revised
the Renewed Facility Operating License
and the Technical Specifications.
Date of initial notice in Federal
Register: October 11, 2016 (81 FR
70178). The supplemental letter dated
November 21, 2016, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the NRC staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 24,
2017.
No significant hazards consideration
comments received: No.
FirstEnergy Nuclear Operating
Company, et al., Docket No. 50–346,
Davis-Besse Nuclear Power Station
(DBNPS), Unit No. 1, Ottawa County,
Ohio
Date of application for amendment:
February 17, 2016, as supplemented by
letter dated September 6, 2016.
Brief description of amendment: The
amendment changed the DBNPS
emergency plan by revising the
emergency action level scheme.
Date of issuance: January 12, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 180 days from the date of
issuance.
E:\FR\FM\14FEN1.SGM
14FEN1
10604
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
Amendment No.: 294. A publiclyavailable version is in ADAMS under
Accession No. ML16342C946;
documents related to this amendment
are listed in the Safely Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. NPF–3: The amendment revised the
emergency plan.
Date of initial notice in Federal
Register: March 15, 2016 (81 FR
13843).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 12,
2017.
No significant hazards consideration
comments received: No.
South Carolina Electric & Gas Company,
South Carolina Public Service
Authority, Docket No. 50–395, Virgil C.
Summer Nuclear Station, Unit No. 1,
Fairfield County, South Carolina
Date of amendment request: August
29, 2016.
Brief description of amendment: This
amendment approves a change to the
administrative controls associated with
the Limiting Condition for Operation
(LCO) of Technical Specification (TS)
3.5.4, ‘‘Refueling Water Storage Tank.’’
Date of issuance: January 18, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment No.: 207. A publiclyavailable version is in ADAMS under
Accession No. ML16348A200;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. NPF–12: Amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: October 11, 2016 (81 FR
70183).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 18,
2017.
No significant hazards consideration
comments received: No.
sradovich on DSK3GMQ082PROD with NOTICES
Southern California Edison Company, et
al., Docket Nos. 50–361 and 50–362,
San Onofre Nuclear Generating Station
(SONGS), Units 2 and 3, San Diego
County, California
Date of amendment request: June 16,
2016, as supplemented by letter dated
September 6, 2016.
Brief description of amendments: The
amendments revised the scheduled
implementation date for Milestone 8 of
the SONGS, Units 2 and 3, Cyber
Security Plan to December 31, 2019, in
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
order to more fully reflect the
permanently shutdown status of the
facility and accommodate ongoing
decommissioning activities.
Date of issuance: January 23, 2017.
Effective date: As of its date of
issuance and shall be implemented
within 60 days.
Amendment Nos.: Unit 2–234 and
Unit 3–227: A publicly-available version
is in ADAMS under Accession No.
ML16252A207; documents related to
these amendments are listed in the
Safety Evaluation enclosed with the
amendments.
Facility Operating License Nos. NPF–
10 and NPF–15: The amendments
revised the Facility Operating Licenses.
Date of initial notice in Federal
Register: August 2, 2016 (81 FR 50735).
The supplemental letter dated
September 6, 2016, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated January 23,
2017.
No significant hazards consideration
comments received: No.
Southern Nuclear Operating Company,
Inc., Docket No. 50–364, Joseph M.
Farley Nuclear Plant, Unit 2, Houston
County, Alabama
Date of amendment request:
September 8, 2016.
Brief description of amendment: The
amendment corrected an error in the
Joseph M. Farley Nuclear Plant, Unit 2,
Renewed Facility Operating License No.
NPF–8, for Condition 2.C.(23).
Specifically, the Unit 2 referenced date
representing the start of the 20-year
period of extended operation was
incorrectly entered as June 25, 2017.
The Unit 2 correct date corresponding to
the 20-year period of extended
operation is March 31, 2021.
Date of issuance: January 23, 2017.
Effective date: As of its date of
issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 204. A publiclyavailable version is in ADAMS under
Accession No. ML15329A032;
documents related to this amendment is
listed in the Safety Evaluation enclosed
with the amendment.
Renewed Facility Operating License
No. NPF–8: Amendment revised the
Renewed Facility Operating License.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Date of initial notice in Federal
Register: October 25, 2016 (81 FR
73441).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 23,
2017.
No significant hazards consideration
comments received: No.
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–348 and 50–364,
Joseph M. Farley Nuclear Plant (Farley),
Units 1 and 2, Houston County,
Alabama
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–424 and 50–425,
Vogtle Electric Generating Plant
(Vogtle), Units 1 and 2, Burke County,
Georgia
Southern Nuclear Operating Company,
Inc., Georgia Power Company,
Oglethorpe Power Corporation,
Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50–
321 and 50–366, Edwin I. Hatch Nuclear
Plant (Hatch), Unit Nos. 1 and 2,
Appling County, Georgia
Date of amendment request: March
14, 2016, as supplemented by letters
dated May 17, 2016, and October 26,
2016.
Brief description of amendments: The
amendments consist of changes that
insert generic personnel titles in lieu of
plant-specific personnel titles. In
addition, the term ‘‘plant-specific titles’’
is replaced with ‘‘generic titles’’ in
Technical Specification (TS) 5.2.1.a for
each plant. Lastly, this change revised
the Hatch, Unit Nos. 1 and 2, TS 5.1 to
be consistent with the corresponding
Farley, Units 1 and 2, and Vogtle, Units
1 and 2, TS 5.1, and make it consistent
with the corresponding Improved
Standard Technical Specifications
section.
Date of issuance: January 13, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: Farley—Unit 1
(207) and Unit 2 (203); Vogtle—Unit 1
(183) and Unit 2 (166); and Hatch—Unit
No. 1 (282) and Unit No. 2 (227). A
publicly-available version is in ADAMS
under Accession No. ML16291A030;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. NPF–2, NPF–8, NPF–68, NPF–81,
DPR–57, and NPF–5: Amendments
revised the Renewed Facility Operating
Licenses and TSs.
Date of initial notice in Federal
Register: May 24, 2016 (81 FR 32809).
The supplemental letters dated May 17,
E:\FR\FM\14FEN1.SGM
14FEN1
Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
2016, and October 26, 2016, provided
additional information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated January 13,
2017.
No significant hazards consideration
comments received: No.
Susquehanna Nuclear, LLC, Docket No.
50–388, Susquehanna Steam Electric
Station, Unit 2, Luzerne County,
Pennsylvania
Date of amendment request: January
28, 2016, as supplemented by letters
April 6, 2016, and October 10, 2016.
Brief description of amendment: The
amendment revised Technical
Specification (TS) 3.7.1, ‘‘Residual Heat
Removal Service Water (RHRSW)
System and the Ultimate Heat Sink
(UHS),’’ and TS 3.8.7, ‘‘Distribution
Systems—Operating,’’ to increase the
completion time for Conditions A and B
of TS 3.7.1, and Condition C of TS 3.8.7,
from 72 hours to 7 days, in order to
accommodate 480 volt engineered
safeguard system load center
transformer replacements on the
Susquehanna Steam Electric Station,
Unit 1. The change is temporary and
will be annotated by a note in each TS
that specifies the allowance expires on
June 15, 2020.
Date of issuance: January 26, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment No.: 248. A publiclyavailable version is in ADAMS under
Accession No. ML17004A250;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Facility Operating License No. NPF–
22: The amendment revised the
Renewed Facility Operating License and
TSs.
Date of initial notice in Federal
Register: May 24, 2016 (81 FR 32810).
The supplemental letter dated October
10, 2016, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated January 26,
2017.
VerDate Sep<11>2014
16:48 Feb 13, 2017
Jkt 241001
No significant hazards consideration
comments received: No.
Tennessee Valley Authority, Docket
Nos. 50–259, 50–260, and 50–296,
Browns Ferry Nuclear Plant, Units 1, 2
and 3, Limestone County, Alabama
Date of amendment request: August
12, 2016.
Brief description of amendments: The
amendments revised Technical
Specification (TS) 4.3.1.2, ‘‘Fuel Storage
Criticality,’’ for Units 1, 2, and 3, to
preclude the placement of fuel in the
new fuel storage vaults. This TS change
removed the existing TS 4.3.1.2
criticality criteria wording in its
entirety, and replaced it with language
that specifically restricts the placement
of fuel in the new fuel storage vaults.
Date of issuance: January 17, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: 296 (Unit 1), 320
(Unit 2), and 280 (Unit 3). A publiclyavailable version is in ADAMS under
Accession No. ML16330A158;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. DPR–33, DPR–52, and DPR–68:
Amendments revised the Renewed
Facility Operating Licenses and TSs.
Date of initial notice in Federal
Register: October 11, 2016 (81 FR
70187).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 17,
2017.
No significant hazards consideration
comments received: No.
Tennessee Valley Authority, Docket
Nos. 50–390 and 50–391, Watts Bar
Nuclear Plant, Units 1 and 2, Rhea
County, Tennessee
Date of amendment request:
December 8, 2015, as supplemented by
letters dated March 11, October 13,
December 1, and December 8, 2016.
Brief description of amendment: The
amendment revised the Watts Bar
Nuclear Plant, Units 1 and 2, Technical
Specification (TS) 3.8.1, ‘‘AC Sources—
Operating,’’ to extend the Completion
Time for one inoperable Diesel
Generator from 72 hours to 10 days
based on the availability of a
supplemental alternating current power
source (specifically, the FLEX DG added
as part of the mitigating strategies for
beyond-design-basis events in response
to NRC Order EA–12–049). The
amendment also made clarifying
changes to certain TS 3.8.1 Conditions,
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
10605
Required Actions, and Surveillance
Requirements.
Date of issuance: January 13, 2017.
Effective date: As of the date of
issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 110 (Unit 1) and 5
(Unit 2). A publicly-available version is
in ADAMS under Accession No.
ML17006A271; documents related to
this amendment are listed in the Safety
Evaluation enclosed with the
amendment.
Facility Operating License Nos. NPF–
90 and NPF–96: Amendments revised
the Facility Operating Licenses and
Technical Specifications.
Date of initial notice in Federal
Register: May 24, 2016 (81 FR 32810).
The supplement letters dated October
13, November 1, and December 8, 2016,
provided additional information that
clarified the application, did not expand
the scope of the application as originally
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated January 13,
2017.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 6th day
of February 2017.
For the Nuclear Regulatory Commission.
Anne T. Boland,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2017–02795 Filed 2–13–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc., Vogtle Electric Generating
Station, Units 3 and 4; Fire Pump Head
and Diesel Fuel Day Tank Changes
Nuclear Regulatory
Commission.
ACTION: Exemption and combined
license amendment issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is granting an
exemption to allow a departure from the
certification information of Tier 1 of the
generic design control document (DCD)
and is issuing License Amendment No.
58 to Combined Licenses (COL), NPF–
91 and NPF–92. The COLs were issued
to Southern Nuclear Operating
SUMMARY:
E:\FR\FM\14FEN1.SGM
14FEN1
Agencies
[Federal Register Volume 82, Number 29 (Tuesday, February 14, 2017)]
[Notices]
[Pages 10590-10605]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-02795]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2017-0038]
Biweekly Notice; Applications and Amendments to Facility
Operating Licenses and Combined Licenses Involving No Significant
Hazards Considerations
AGENCY: Nuclear Regulatory Commission.
ACTION: Biweekly notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954,
as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is
publishing this regular biweekly notice. The Act requires the
Commission to publish notice of any amendments issued, or proposed to
be issued, and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued, from January 14 to January 30, 2017. The last
biweekly notice was published on January 31, 2017.
DATES: Comments must be filed by March 16, 2017. A request for a
hearing must be filed by April 17, 2017.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0038. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Paula Blechman, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC
20555-0001; telephone: 301-415-2242, email: Paula.Blechman@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2017-0038, facility name, unit
number(s), plant docket number, application date, and subject when
contacting the NRC about the availability of information for this
action. You may obtain publicly-available information related to this
action by any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0038.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
[[Page 10591]]
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2017-0038, facility name, unit
number(s), plant docket number, application date, and subject in your
comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility
Operating Licenses and Combined Licenses and Proposed No Significant
Hazards Consideration Determination
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Sec. 50.92 of title 10 of the Code of
Federal Regulations (10 CFR), this means that operation of the facility
in accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated, or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment
period such that failure to act in a timely way would result, for
example in derating or shutdown of the facility. If the Commission
takes action prior to the expiration of either the comment period or
the notice period, it will publish in the Federal Register a notice of
issuance. If the Commission makes a final no significant hazards
consideration determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the
[[Page 10592]]
filing instructions in the ``Electronic Submissions (E-Filing)''
section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the Commission may issue the amendment and make it
immediately effective, notwithstanding the request for a hearing. Any
hearing would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of the amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by April
17, 2017. The petition must be filed in accordance with the filing
instructions in the ``Electronic Submissions (E-Filing)'' section of
this document, and should meet the requirements for petitions set forth
in this section, except that under 10 CFR 2.309(h)(2) a State, local
governmental body, or Federally-recognized Indian Tribe, or agency
thereof does not need to address the standing requirements in 10 CFR
2.309(d) if the facility is located within its boundaries.
Alternatively, a State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may participate as a non-party under 10
CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562, August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public Web site at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals.html, by
email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on
[[Page 10593]]
all other participants. Filing is considered complete by first-class
mail as of the time of deposit in the mail, or by courier, express
mail, or expedited delivery service upon depositing the document with
the provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
For further details with respect to these license amendment
applications, see the application for amendment which is available for
public inspection in ADAMS and at the NRC's PDR. For additional
direction on accessing information related to this document, see the
``Obtaining Information and Submitting Comments'' section of this
document.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287,
Oconee Nuclear Station Units 1, 2, and 3 (ONS), Oconee County, South
Carolina
Date of amendment request: July 20, 2016. Publicly-available
version is in ADAMS under Accession No. ML16209A222.
Description of amendment request: The proposed amendment requests
to revise the Technical Specifications (TSs) associated with dry spent
fuel storage cask loading and unloading requirements for ONS.
Specifically, the license amendment request would revise TS 3.7.12,
``Spent Fuel Pool Boron Concentration''; TS 3.7.18, ``Dry Spent Fuel
Storage Cask Loading and Unloading''; and TS 4.4, ``Dry Spent Fuel
Storage Cask Loading and Unloading,'' to remove certain TS requirements
that no longer pertain to the ONS Independent Spent Fuel Storage
Facility general license, due to changes in 10 CFR 50.68, ``Criticality
accident requirements.''
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below, with NRC edits in square
brackets:
1. Does the proposed change [amendment] involve a significant
increase in the probability or consequences of an accident
previously evaluated?
Response: No.
The proposed changes to Technical Specifications (TSs) 3.7.12,
3.7.18 and 4.4, do not modify the method of nuclear fuel storage or
handling at Oconee Nuclear Station (ONS), or make any physical
changes to the facility design, material, or construction standards.
The proposed change revises the criticality requirements contained
in the TSs, as allowed by 10 CFR 50.68(c), that are redundant to
regulatory requirements provided in 10 CFR part 72 and the Nuclear
Regulatory Commission (NRC)-approved Certificate of Compliance (CoC)
for the spent fuel dry shielded canisters utilized at ONS. The
proposed change to the TS requirements neither result[s] in
operation that will increase the probability of initiating an
analyzed event nor alter[s] assumptions relative to mitigation of an
accident or transient event. The change has no effect on the process
variables, structures, systems, and components that must be
maintained consistent with the safety analyses and licensing basis.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes to TSs 3.7.12, 3.7.18 and 4.4, do not
modify the method of nuclear fuel storage or handling at ONS, nor
make any physical changes to the facility design, material, or
construction standards. The change does not alter the plant
configuration (no new or different type of equipment will be
installed) or make changes in the methods governing normal plant
operation. The proposed change to the ONS TS requirements does not
adversely impact the results of the ONS safety analyses and is
compliant with the current licensing basis.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any kind of accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed changes to TS 3.7.12, 3.7.18 and 4.4, do not modify
the method of nuclear fuel storage or handling at ONS, nor make any
physical changes to the facility design, material, or construction
standards. The proposed changes comply with NRC approved regulations
and the station's Part 72 and 50 licensing basis.
Therefore, the proposed TS change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Vice President Nuclear &
EHS Legal Support, Duke Energy Corporation, 526 South Church Street--
EC07H, Charlotte, NC 28202-1802.
NRC Branch Chief: Michael T. Markley.
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287,
Oconee Nuclear Station, Units 1, 2, and 3 (ONS), Oconee County, South
Carolina
Date of amendment request: July 21, 2016. Publicly-available
version is in ADAMS under Accession No. ML16209A223.
Description of amendment request: The proposed amendment requests
to revise the Technical Specifications (TSs) for ONS. Specifically, the
license amendment request would revise TS 2.1.1.1, ``Reactor Core
Safety Limits (SLs),'' and TS 5.6.5, ``Core Operating Limits Report
(COLR),'' to allow the use of the COPERNIC fuel performance code.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below, with NRC edits in square
brackets:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change adds a limit on maximum local fuel pin
centerline temperature to [the] ONS Technical Specifications that is
based on a[n] NRC reviewed and approved fuel performance
[[Page 10594]]
code, and does not require a physical change to plant systems,
structures or components. Plant operations and analysis will
continue to be in accordance with the ONS licensing basis. The peak
fuel centerline temperature is the basis for protecting the fuel and
is consistent with the safety analysis.
The proposed change also adds a topical report for a[n] NRC
reviewed and approved fuel performance code to the list of topical
reports in [the] ONS Technical Specifications, which is
administrative in nature and has no impact on a plant configuration
or system performance relied upon to mitigate the consequences of an
accident. The list of topical reports in the Technical
Specifications used to develop the core operating limits does not
impact either the initiation of an accident or the mitigation of its
consequences.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change adds a limit on maximum local fuel pin
centerline temperature to [the] ONS Technical Specifications that is
based on a[n] NRC reviewed and approved fuel performance code, and
does not require a physical change to plant systems, structures or
components. Specifying maximum local fuel pin centerline temperature
ensures that the fuel design limits are met. Operations and analysis
will continue to be in compliance with NRC regulations. The addition
of a new fuel pin centerline melt temperature versus burnup
relationship does not affect any accident initiators that would
create a new accident.
The proposed change also adds a topical report for a[n] NRC
reviewed and approved fuel performance code to the list of topical
reports in [the] ONS Technical Specifications, which is
administrative in nature and has no impact on a plant configuration
or on system performance. The proposed change updates the list of
NRC-approved topical reports used to develop the core operating
limits. There is no change to the parameters within which the plant
is normally operated. The possibility of a new or different kind of
accident is not created.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change to TS 2.1.1.1 adds a limit on maximum local
fuel pin centerline temperature that is based on an NRC reviewed and
approved fuel performance code, and does not require a physical
change to plant systems, structures or components. Plant operations
and analysis will continue to be in accordance with [the] ONS
licensing basis.
Adding the local fuel pin centerline temperature and burnup
relationship defined by the NRC reviewed and approved fuel
performance code to the ONS Technical Specifications, does not
impact the safety margins established in the ONS licensing basis.
The proposed change also adds a topical report for a[n] NRC
reviewed and approved fuel performance code to the list of topical
reports in [the] ONS Technical Specifications, which is
administrative in nature and does not amend the cycle specific
parameters presently required by the Technical Specifications. The
individual Technical Specifications continue to require operation of
the plant within the bounds of the limits specified in the Core
Operating Limits Report. The proposed change to the list of
analytical methods referenced in the Core Operating Limits Report
does not impact the margin of safety.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Vice President Nuclear &
EHS Legal Support, Duke Energy Corporation, 526 South Church Street--
EC07H, Charlotte, NC 28202-1802.
NRC Branch Chief: Michael T. Markley.
Duke Energy Progress, LLC, Docket Nos. 50-325 and 50-324, Brunswick
Steam Electric Plant, Units 1 and 2 (BSEP), Brunswick County, North
Carolina
Duke Energy Carolinas, LLC, Docket Nos. 50-413 and 50-414, Catawba
Nuclear Station, Units 1 and 2 (CNS), York County, South Carolina
Duke Energy Progress, LLC, Docket No. 50-400, Shearon Harris Nuclear
Power Plant, Unit 1 (HNP), Wake County, North Carolina
Duke Energy Carolinas, LLC, Docket Nos. 50-369 and 50-370, McGuire
Nuclear Station, Units 1 and 2 (MNS), Mecklenburg County, North
Carolina
Duke Energy Carolinas, LLC, Docket Nos. 50-269, 50-270, and 50-287,
Oconee Nuclear Station, Units 1, 2, and 3 (ONS), Oconee County, South
Carolina
Duke Energy Progress, LLC, Docket No. 50-261, H.B. Robinson Steam
Electric Plant, Unit No. 2 (RNP), Darlington County, South Carolina
Duke Energy Carolinas, LLC, Docket Nos. 52-018 and 52-019, William
States Lee III Nuclear Station, Units 1, and 2 (WLS), Cherokee County,
South Carolina
Date of amendment request: April 29, 2016, as supplemented by
letters dated October 3, 2016, and January 16, 2017. Publicly-available
versions are in ADAMS under Accession Nos. ML16120A076, ML16277A521,
and ML17017A210, respectively.
Description of amendment request: The NRC staff previously made a
proposed determination that the amendment request dated April 29, 2016,
involves no significant hazards considerations (81 FR 43650; July 5,
2016). Subsequently, by letter dated January 16, 2017, the licensee
provided additional information that expanded the scope of the
amendment request as originally noticed. Accordingly, this notice
supersedes the previous notice in its entirety.
The amendments would (1) consolidate the Emergency Operations
Facilities (EOFs) for BSEP, HNP, and RNP with the Duke Energy Progress,
LLC (Duke Energy) corporate EOF in Charlotte, North Carolina; (2)
decrease the frequency for a multi-site drill from once per 6 years to
once per 8 years; (3) allow the multi-site drill performance with sites
other than CNS, MNS, or ONS, (4) change the BSEP, HNP, and RNP
augmentation times to be consistent with those of the sites currently
supported by the Duke Energy corporate EOF, and (5) decrease the
frequency of the unannounced augmentation drill at BSEP from twice per
year to once per year. The January 16, 2017, letter also acknowledges
the addition of WLS to the Duke Energy corporate EOF with the issuance
of the WLS operating license on December 19, 2016 (ADAMS Accession No.
ML16333A329).
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes relocate the BSEP, HNP, and RNP EOFs from
their present onsite or near-site locations to the established
corporate EOF in Charlotte, North Carolina, changes the required
response times for supplementing onsite personnel in response to a
radiological emergency, decreases the multi-site drill frequency,
allows the multi-site drill to be performed with sites other than
ONS, MNS, or CNS, and decreases the frequency of augmentation drills
at BSEP. The functions and capabilities of the relocated EOFs will
continue to meet the applicable regulatory requirements. It has
[[Page 10595]]
been evaluated and determined that the change in response time does
not significantly affect the ability to supplement the onsite staff.
In addition, analysis shows that the onsite staff can acceptably
respond to an event for longer than the requested time for augmented
staff to arrive. The proposed changes have no effect on normal plant
operation or on any accident initiator or precursors, and do not
impact the function of plant structures, systems, or components
(SSCs). The proposed changes do not alter or prevent the ability of
the emergency response organization to perform its intended
functions to mitigate the consequences of an accident or event.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes only impact the implementation of the
affected stations' emergency plans by relocating their onsite or
near-site EOFs to the established corporate EOF in Charlotte, North
Carolina, changing the required response time of responders who
supplement the onsite staff, decreasing the multi-site drill
frequency, allowing the multi-site drill to be performed with sites
other than ONS, MNS, or CNS, and decreasing the frequency of
augmentation drills at BSEP. The functions and capabilities of the
relocated EOFs will continue to meet the applicable regulatory
requirements. It has been evaluated and determined that the change
in response time does not significantly affect the ability to
supplement the onsite staff. In addition, analysis shows that the
onsite staff can acceptably respond to an event for longer than the
requested time for augmented staff to arrive. The proposed changes
will not change the design function or operation of SSCs. The
changes do not impact the accident analysis. The changes do not
involve a physical alteration of the plant, a change in the method
of plant operation, or new operator actions. The proposed changes do
not introduce failure modes that could result in a new accident, and
the changes do not alter assumptions made in the safety analysis.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed changes only impacts the implementation of the
affected stations' emergency plans by relocating their onsite or
near-site EOFs to the established corporate EOF in Charlotte, North
Carolina, changing the required response time of responders who
supplement the onsite staff, decreasing the multi-site drill
frequency, allowing the multi-site drill to be performed with sites
other than ONS, MNS, or CNS, and decreasing the frequency of
augmentation drills at BSEP. The functions and capabilities of the
relocated EOFs will continue to meet the applicable regulatory
requirements. It has been evaluated and determined that the change
in response time does not significantly affect the ability to
supplement the onsite staff. In addition, analysis shows that the
onsite staff can acceptably respond to an event for longer than the
requested time for augmented staff to arrive. Margin of safety is
associated with confidence in the ability of the fission product
barriers (i.e., fuel cladding, reactor coolant system pressure
boundary, and containment structure) to limit the level of radiation
dose to the public. The proposed changes are associated with the
emergency plans and do not impact operation of the plant or its
response to transients or accidents. The changes do not affect the
Technical Specifications. The changes do not involve a change in the
method of plant operation, and no accident analyses will be affected
by the proposed changes. Safety analysis acceptance criteria are not
affected. The emergency plans will continue to provide the necessary
response staff for emergencies as demonstrated by staffing and
functional analyses including the necessary timeliness of performing
major tasks for the functional areas of the emergency plans.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara S. Nichols, Deputy General Counsel,
Duke Energy Corporation, 550 South Tyron Street, Mail Code DEC45A,
Charlotte, NC 28202.
NRC Branch Chief: Benjamin G. Beasley.
Duke Energy Progress, LLC, Docket No. 50-400, Shearon Harris Nuclear
Power Plant (HNP), Unit 1, Wake and Chatham Counties, North Carolina
Date of amendment request: December 2, 2016. A publicly-available
version is in ADAMS under Accession No. ML16337A249.
Description of amendment request: The amendment would revise HNP
Technical Specifications (TSs) to relocate selected figures and values
from the TSs to the Core Operating Limits Report (COLR), remove all
references to a specific plant procedure as it pertains to the COLR,
and adopt Technical Specification Task Force (TSTF)-5, ``Delete Safety
Limit Violation Notification Requirements,'' Revision 1, which deletes
duplicate notification, reporting and restart requirements from the
Administrative Controls section of TSs.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
[Response: No.]
The proposed changes do not involve a significant increase in
the probability or consequences of an accident previously evaluated.
The proposed changes are administrative in nature, facilitate
improved content and presentation of Administrative controls, and
alter only the format and location of cycle-specific parameter
figures and limits from the TS to the COLR. This relocation does not
result in the alteration of the design, material, or construction
standards that were applicable prior to the change. The proposed
changes will not result in modification of any system interface that
would increase the likelihood of an accident since these events are
independent of the proposed change. The proposed amendment will not
change, degrade, or prevent actions, or alter any assumptions
previously made in evaluating the radiological consequences of an
accident described in the Final Safety Analysis Report (FSAR).
Therefore, the proposed changes do not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any previously evaluated?
[Response: No.]
The proposed changes do not create the possibility of a new or
different kind of accident from any accident previously evaluated.
The proposed changes do not involve any change to the configuration
or method of operation of any plant equipment. Accordingly, no new
failure modes have been defined for any plant system or component
important to safety nor has any new limiting single failure been
identified as a result of the proposed changes. Also, there will be
no change in types or increase in the amounts of any effluents
released offsite.
Therefore, the proposed changes do not create the possibility of
a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
[Response: No.]
The proposed changes do not involve a significant reduction in a
margin of safety. Previously-approved methodologies will continue to
be used in determination of cycle-specific core operating limits
that are present in the COLR. The proposed changes are
administrative in nature and will not affect the plant design or
system operating parameters. As such, there is no detrimental impact
on any equipment design parameter and the plant will continue to be
operated within prescribed limits.
[[Page 10596]]
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Lara Nichols, Deputy General Counsel, Duke
Energy Corporation, 550 South Tryon St., M/C DEC45A, Charlotte, NC
28202.
NRC Branch Chief: Benjamin G. Beasley.
Energy Northwest, Docket No. 50-397, Columbia Generating Station,
Benton County, Washington
Date of amendment request: November 8, 2016. A publicly-available
version is in ADAMS under Accession No. ML16313A573.
Description of amendment request: The proposed amendment would, on
a one-time basis, extend the Completion Time by 7 days for Technical
Specification Conditions 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A. This
onetime extension will be used to support preventive maintenance, which
replaces the residual heat removal train A subsystem's pump and motor.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment does not increase the probability of an
accident because the residual heat removal (RHR) system cannot
initiate an accident. The RHR system provides coolant injection to
the reactor core, cooling of the suppression pool water inventory,
and drywell sprays following a design basis accident.
The proposed one time completion time (CT) change for RHR train
A does not alter the conditions, operating configurations, or
minimum amount of operating equipment assumed in the safety analysis
for accident mitigation. No changes are proposed in the manner in
which the emergency core cooling system (ECCS) provides plant
protection or which create new modes of plant operation. In
addition, a probabilistic safety assessment (PSA) evaluation
concluded that the risk contribution of the increased CT is a very
small increase in risk. The proposed change in CT will not affect
the probability of any event initiators. There will be no
degradation in the performance of, or an increase in the number of
challenges imposed on, safety related equipment assumed to function
during an accident situation. There will be no change to normal
plant operating parameters or accident mitigation performance.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any previously evaluated?
Response: No.
The proposed amendment will not create the possibility of a new
or different kind of accident because inoperability of one RHR
subsystem is not an accident precursor. There are no hardware
changes nor are there any changes in the method by which any plant
system performs a safety function. This request does not affect the
normal method of plant operation. The proposed amendment does not
introduce new equipment, or new way of operation of the system which
could create a new or different kind of accident. No new external
threats, release pathways, or equipment failure modes are created.
No new accident scenarios, transient precursors, failure mechanisms,
or limiting single failures are introduced as a result of this
request.
Therefore, the implementation of the proposed amendment will not
create a possibility for an accident of a new or different type than
those previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Columbia's ECCS is designed with sufficient redundancy such that
a low pressure ECCS subsystem may be removed from service for
maintenance or testing. The remaining subsystems are capable of
providing water and removing heat loads to satisfy the final safety
analysis report (FSAR) requirements for accident mitigation or plant
shutdown. A PSA evaluation concluded that the risk contribution of
the CT extension is very small. There will be no change to the
manner in which safety limits or limiting safety system settings are
determined nor will there be any change to those plant systems
necessary to assure the accomplishment of protection functions.
There will be no change to post-LOCA peak clad temperatures.
For these reasons, the proposed amendment does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: William A. Horin, Esq., Winston & Strawn,
1700 K Street NW., Washington, DC 20006-3817.
NRC Branch Chief: Robert J. Pascarelli.
Entergy Nuclear Operations, Inc., Docket No. 50-255, Palisades Nuclear
Plant, Van Buren County, Michigan
Date of amendment request: November 9, 2016. A publicly-available
version is in ADAMS under Accession No. ML16314A027.
Description of amendment request: The proposed amendment would
revise Technical Specification (TS) 5.5.10, ``Ventilation Filter
Testing Program,'' to correct and modify the description of the control
room ventilation and fuel handling area ventilation systems. In
addition, the proposed amendment would correct an editorial omission in
TS Limiting Condition for Operation 3.0.9.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes to the Palisades Nuclear Plant (PNP)
Technical Specifications (TS) are editorial or administrative in
nature. The changes make an editorial correction in the TS, and
correct and modify the component descriptions in the ventilation
filter testing program TS. These changes do not alter accident
analysis assumptions, add any initiators, or affect the function of
plant systems or the manner in which systems are operated,
maintained, modified, tested, or inspected. The proposed changes do
not require any plant modifications which affect the performance
capability of the structures, systems, and components relied upon to
mitigate the consequences of postulated accidents, and have no
impact on the probability or consequences of an accident previously
evaluated.
Therefore, the proposed changes do not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes to the PNP TS are editorial or
administrative in nature. The changes make an editorial correction
in the TS, and correct and modify the component descriptions within
the ventilation filter testing program TS. The proposed changes do
not alter accident analysis assumptions, add any initiators, or
affect the function of plant systems or the manner in which systems
are operated, maintained, modified, tested, or inspected. The
proposed changes do not require any plant modifications which affect
the performance capability of the structures, systems, and
components relied upon to mitigate the consequences of postulated
[[Page 10597]]
accidents, and do not create the possibility of a new or different
kind of accident from any accident previously evaluated.
Therefore, the proposed changes do not create the possibility of
a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
Plant safety margins are established through limiting conditions
for operation, limiting safety system settings, and safety limits
specified in the technical specifications. The proposed changes to
the TS are editorial or administrative in nature and do not impact
any safety margins. Because there is no impact on established safety
margins as a result of these changes, the proposed change does not
involve a significant reduction in a margin of safety.
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Jeanne Cho, Senior Counsel, Entergy
Services, Inc., 440 Hamilton Ave., White Plains, NY 10601.
NRC Branch Chief: David J. Wrona.
Exelon Generation Company, LLC, Docket Nos. 50-373 and 50-374, LaSalle
County Station (LSCS), Units 1 and 2, LaSalle County, Illinois
Date of amendment request: October 26, 2016. A publicly-available
version is in ADAMS under Accession No. ML16300A200.
Description of amendment request: The proposed change revises TS
5.5.13, ``Primary Containment Leakage Rate Testing Program,'' to allow
for the permanent extension of the Type A Integrated Leak Rate Testing
(ILRT) and Type C Leak Rate Testing frequencies, to change the
documents used by LSCS to implement the performance-based leakage
testing program, and to delete the information regarding the
performance of the next LSCS Type A tests to be performed.
Additionally, this license amendment request (LAR) proposes to
delete Condition 2.D.(e) of the LSCS Unit 1 Renewed Facility Operating
License regarding conducting the third Type A Test of each 10-year
service period when the plant is shutdown for the 10-year plant
inservice inspection (ISI). Similarly, this LAR proposes to delete
Condition 2.D.(c) of the LSCS Unit 2 Renewed Facility Operating License
regarding conducting the third Type A test of each 10-year service
period when the plant is shutdown for the 10 year plant ISI.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment to the TS involves the extension of the
LSCS Type A containment test interval to 15 years and the extension
of the Type C test interval to 75 months. The current Type A test
interval of 120 months (10 years) would be extended on a permanent
basis to no longer than 15 years from the last Type A test. The
current Type C test interval of 60 months for selected components
would be extended on a performance basis to no longer than 75
months. Extensions of up to nine months (total maximum interval of
84 months for Type C tests) are permissible only for non-routine
emergent conditions.
The proposed extension does not involve either a physical change
to the plant or a change in the manner in which the plant is
operated or controlled. The containment is designed to provide an
essentially leak tight barrier against the uncontrolled release of
radioactivity to the environment for postulated accidents. As such,
the containment and the testing requirements invoked to periodically
demonstrate the integrity of the containment exist to ensure the
plant's ability to mitigate the consequences of an accident, and do
not involve the prevention or identification of any precursors of an
accident. The change in dose risk for changing the Type A test
frequency from three-per-ten years to once-per-fifteen years,
measured as an increase to the total integrated dose risk for all
internal events accident sequences for LSCS, is 1.23E-02 person-rem/
yr (0.33%) using the EPRI [Electric Power Research Institute]
guidance with the base case corrosion included. The change in dose
risk drops to 3.15E-03 person-rem/yr (0.08%) when using the EPRI
Expert Elicitation methodology. The values calculated per the EPRI
guidance are all lower than the acceptance criteria of <=1.0 person-
rem/yr or <1.0% person-rem/yr defined in Section 1.3 of Attachment 3
of this submittal. The results of the risk assessment for this
amendment meet these criteria. Moreover, the risk impact for the
ILRT extension when compared to other severe accident risks is
negligible. Therefore, this proposed extension does not involve a
significant increase in the probability of an accident previously
evaluated.
As documented in NUREG-1493, Type B and C tests have identified
a very large percentage of containment leakage paths, and the
percentage of containment leakage paths that are detected only by
Type A testing is very small. The LSCS Type A test history supports
this conclusion.
The integrity of the containment is subject to two types of
failure mechanisms that can be categorized as: (1) Activity based
and (2) time based. Activity based failure mechanisms are defined as
degradation due to system and/or component modifications or
maintenance. Local leak rate test requirements and administrative
controls such as configuration management and procedural
requirements for system restoration ensure that containment
integrity is not degraded by plant modifications or maintenance
activities. The design and construction requirements of the
containment combined with the containment inspections performed in
accordance with ASME [American Society of Mechanical Engineers]
Section XI and TS requirements serve to provide a high degree of
assurance that the containment would not degrade in a manner that is
detectable only by a Type A test. Based on the above, the proposed
extensions do not significantly increase the consequences of an
accident previously evaluated.
The proposed amendment also deletes exceptions previously
granted to allow one-time extensions of the ILRT test frequency for
LSCS. These exceptions were for activities that would have already
taken place by the time this amendment is approved; therefore, their
deletion is solely an administrative action that has no effect on
any component and no impact on how the unit is operated.
Therefore, the proposed change does not result in a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed amendment to the TS involves the extension of the
LSCS Type A containment test interval to 15 years and the extension
of the Type C test interval to 75 months. The containment and the
testing requirements to periodically demonstrate the integrity of
the containment exist to ensure the plant's ability to mitigate the
consequences of an accident do not involve any accident precursors
or initiators. The proposed change does not involve a physical
change to the plant (i.e., no new or different type of equipment
will be installed) or a change to the manner in which the plant is
operated or controlled.
The proposed amendment also deletes exceptions previously
granted to allow one-time extensions of the ILRT test frequency for
LSCS. These exceptions were for activities that would have already
taken place by the time this amendment is approved; therefore, their
deletion is solely an administrative action that does not result in
any change in how the unit is operated.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed amendment to TS 5.5.13 involves the extension of
the LSCS Type A
[[Page 10598]]
containment test interval to 15 years and the extension of the Type
C test interval to 75 months for selected components. This amendment
does not alter the manner in which safety limits, limiting safety
system set points, or limiting conditions for operation are
determined. The specific requirements and conditions of the TS
Containment Leak Rate Testing Program exist to ensure that the
degree of containment structural integrity and leak-tightness that
is considered in the plant safety analysis is maintained. The
overall containment leak rate limit specified by TS is maintained.
The proposed change involves only the extension of the interval
between Type A containment leak rate tests and Type C tests for
LSCS. The proposed surveillance interval extension is bounded by the
15-year ILRT Interval and the 75-month Type C test interval
currently authorized within NEI [Nuclear Energy Institute] 94-01,
Revision 3-A. Industry experience supports the conclusion that Type
B and C testing detects a large percentage of containment leakage
paths and that the percentage of containment leakage paths that are
detected only by Type A testing is small. The containment
inspections performed in accordance with ASME Section XI and TS
serve to provide a high degree of assurance that the containment
would not degrade in a manner that is detectable only by Type A
testing. The combination of these factors ensures that the margin of
safety in the plant safety analysis is maintained. The design,
operation, testing methods and acceptance criteria for Type A, B,
and C containment leakage tests specified in applicable codes and
standards would continue to be met, with the acceptance of this
proposed change, since these are not affected by changes to the Type
A and Type C test intervals.
The proposed amendment also deletes exceptions previously
granted to allow one time extensions of the ILRT test frequency for
LSCS. These exceptions were for activities that would have already
taken place by the time this amendment is approved; therefore, their
deletion is solely an administrative action and does not change how
the unit is operated and maintained. Thus, there is no reduction in
any margin of safety.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
requested amendments involve no significant hazards consideration.
Attorney for licensee: Tamra Domeyer, Associate General Counsel,
Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL
60555.
NRC Branch Chief: David J. Wrona.
South Carolina Electric & Gas Company (SCE&G) and South Carolina Public
Service Authority, Docket Nos. 52-027 and 52-028, Virgil C. Summer
Nuclear Station (VCSNS) Units 2 and 3, Fairfield County, South Carolina
Date of amendment request: November 10, 2016. A publicly-available
version is in ADAMS under Accession No. ML16316A003.
Description of amendment request: The amendment request proposes to
add to License Condition 2.D.(1) of the VCSNS Units 2 and 3 combined
licenses (COLs), an Interim Amendment Request process for changes
during construction when emergent conditions are present.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below with NRC staff edits in square
brackets:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment would add an Interim Amendment Request
process to Condition 2.D.(1) of the VCSNS 2 and 3 COLs to allow
construction to continue, at SCE&G's own risk, in emergent
conditions, where a non-conforming condition that has little or no
safety significance is discovered and the work activity cannot be
adjusted. The Interim Amendment Request process would require SCE&G
to submit a Nuclear Construction Safety Assessment which (1)
identifies the proposed change; (2) evaluates whether emergent
conditions are present; (3) evaluates whether the change would
result in any material decrease in safety; and (4) evaluates whether
continued construction would make the non-conforming condition
irreversible. Only if the continued construction would have no
material decrease in safety would the NRC issue a determination that
construction could continue pending SCE&G's initiation of the COL-
ISG-025 PAR [preliminary amendment request]/LAR [license amendment
request] process. The requirement to include a Nuclear Construction
Safety Assessment ensures that the proposed amendment would not
involve a significant increase in the probability or consequences of
an accident previously evaluated. If the continued construction
would result a material decrease in safety, then continued
construction would not be authorized.
The proposed amendment does not modify the design, construction,
or operation of any plant structures, systems, or components (SSCs),
nor does it change any procedures or method of control for any SSCs.
Because the proposed amendment does not change the design,
construction, or operation of any SSCs, it does not adversely affect
any design function as described in the Updated Final Safety
Analysis Report.
The proposed amendment does not affect the probability of an
accident previously evaluated. Similarly, because the proposed
amendment does not alter the design or operation of the nuclear
plant or any plant SSCs, the proposed amendment does not represent a
change to the radiological effects of an accident, and therefore,
does not involve an increase in the consequences of an accident
previously evaluated.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed amendment would add an Interim Amendment Request
process to Condition 2.D.(1) of the VCSNS 2 and 3 COLs to allow
construction to continue, at SCE&G's own risk, in emergent
conditions, where a non-conforming condition that has little or no
safety significance is discovered and the work activity cannot be
adjusted. The Interim Amendment Request process would require SCE&G
to submit a Nuclear Construction Safety Assessment which (1)
identifies the proposed change; (2) evaluates whether emergent
conditions are present; (3) evaluates whether the change would
result in any material decrease in safety; and (4) evaluates whether
continued construction would make the non-conforming condition
irreversible. Only if the continued construction would have no
material decrease in safety would NRC issue a determination that
construction could continue pending SCE&G's initiation of the COL-
ISG-025 PAR/LAR process.
The proposed amendment is not a modification, addition to, or
removal of any plant SSCs. Furthermore, the proposed amendment is
not a change to procedures or method of control of the nuclear plant
or any plant SSCs. The proposed amendment only adds a new screening
process and does not change the design, construction, or operation
of the nuclear plant or any plant operations.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed amendment would add an Interim Amendment Request
process to Condition 2.D.(1) of the VCSNS 2 and 3 COLs to allow
construction to continue, at SCE&G's own risk, in emergent
conditions, where a non-conforming condition that has little or no
safety significance is discovered and the work activity cannot be
adjusted. The Interim Amendment Request process would require SCE&G
to submit a Nuclear Construction Safety Assessment which (1)
identifies the proposed change; (2) evaluates whether emergent
conditions are present; (3) evaluates whether the change would
result in any material decrease in safety; and (4) evaluates whether
continued construction would make the non-conforming condition
irreversible. Only if the continued
[[Page 10599]]
construction would have no material decrease in safety would the NRC
issue determination that construction could continue pending SCE&G's
initiation of the COL-ISG-025 PAR/LAR process.
The proposed amendment is not a modification, addition to, or
removal of any plant SSCs. Furthermore, the proposed amendment is
not a change to procedures or method of control of the nuclear plant
or any plant SSCs. The proposed amendment does not alter any design
function or safety analysis. Consequently, no safety analysis or
design basis acceptance limit/criterion is challenged or exceeded by
the proposed amendment, thus the margin of safety is not reduced.
The only impact of this activity is the addition of an Interim
Amendment Request process.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP,
1710 Sixth Avenue North, Birmingham, AL 35203-2015.
NRC Branch Chief: Jennifer Dixon-Herrity.
South Carolina Electric & Gas Company and South Carolina Public Service
Authority, Docket Nos. 52-027 and 52-028, Virgil C. Summer Nuclear
Station, Units 2 and 3, Fairfield, South Carolina
Date of amendment request: September 15, 2016. A publicly-available
version is in ADAMS under Accession No. ML16259A315.
Description of amendment request: The amendment request proposes
changes to the Updated Final Safety Analysis Report (UFSAR) in the form
of departures from the incorporated plant-specific Design Control
Document Tier 2 information and a combined license (COL) License
Condition which references one of the proposed changes. Additionally,
the proposed changes to the UFSAR eliminate pressurizer spray line
monitoring during pressurizer surge line first plant only testing. In
addition, these proposed changes correct inconsistencies in testing
purpose, testing duration, and the ability to leave equipment in place
following the data collection period. These changes involve material
which is specifically referenced in Section 2.D.(2) of the COL. This
submittal requests approval of the license amendment necessary to
implement these changes.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below with NRC staff edits in square
brackets:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The design functions of the RCS [reactor coolant system] include
providing an effective reactor coolant pressure boundary. The
proposed changes for removing the requirement to install temporary
instrumentation on the pressurizer spray line during the monitoring
of the pressurizer surge line for thermal stratification and thermal
cycling during hot functional testing and during the first fuel
cycle for the first plant only, proposed changes to parameter
retention requirements, and proposed change to remove the
pressurizer spray and surge line valve leakage requirement do not
impact the existing design requirements for the RCS. These changes
are acceptable as they are consistent with the commitments made for
the pressurizer surge line monitoring program for the first plant
only, and do not adversely affect the capability of the pressurizer
surge line and pressurizer spray lines to perform the required
reactor coolant pressure boundary design functions.
These proposed changes to the monitoring of the pressurizer
surge line for thermal stratification and thermal cycling during hot
functional testing and during the first fuel cycle for the first
plant only, proposed changes to parameter retention requirements,
and proposed change to remove the pressurizer spray and surge line
valve leakage requirement as described in the current licensing
basis do not have an adverse effect on any of the design functions
of the systems. The proposed changes do not affect the support,
design, or operation of mechanical and fluid systems required to
mitigate the consequences of an accident. There is no change to
plant systems or the response of systems to postulated accident
conditions. There is no change to the predicted radioactive releases
due to postulated accident conditions. The plant response to
previously evaluated accidents or external events is not adversely
affected, nor do the proposed changes create any new accident
precursors.
Therefore, the requested amendment does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes for removing the requirement to install
temporary instrumentation on the pressurizer spray line during the
monitoring of the pressurizer surge line for thermal stratification
and thermal cycling during hot functional testing and during the
first fuel cycle for the first plant only, proposed changes to
parameter retention requirements, and proposed change to remove the
pressurizer spray and surge line valve leakage requirement as
described in the current licensing basis maintain the required
design functions, and are consistent with other Updated Final Safety
Analysis Report (UFSAR) information. The proposed changes do not
adversely affect the design requirements for the RCS, including the
pressurizer surge line and pressurizer spray lines. The proposed
changes do not adversely affect the design function, support,
design, or operation of mechanical and fluid systems. The proposed
changes do not result in a new failure mechanism or introduce any
new accident precursors. No design function described in the UFSAR
is adversely affected by the proposed changes.
Therefore, the requested amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
No safety analysis or design basis acceptance limit/criterion is
challenged or exceeded by the proposed changes, and no margin of
safety is reduced. Therefore, the requested amendment does not
involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius, LLC, 1111 Pennsylvania Ave. NW., Washington, DC 20004-2514.
NRC Branch Chief: Jennifer Dixon-Herrity.
South Carolina Electric & Gas Company and South Carolina Public Service
Authority, Docket Nos. 52-027 and 52-028, Virgil C. Summer Nuclear
Station, Units 2 and 3, Fairfield, South Carolina
Date of amendment request: November 16, 2016. A publicly-available
version is in ADAMS under Accession No. ML16323A020.
Description of amendment request: The amendment request proposes
changes to plant-specific Tier 1 information, with corresponding
changes to the associated Combined License (COL) Appendix C
information, and involves associated Tier 2 information in the Updated
Final Safety Analysis Report (UFSAR). Specifically, the requested
amendment proposes clarifications to a plant-specific Tier 1 (and COL
Appendix C) table and a UFSAR table in regard to the inspections of the
excore source, intermediate, and power range detectors. Pursuant to the
provisions of 10 CFR 52.63(b)(1), an exemption from
[[Page 10600]]
elements of the design as certified in the 10 CFR part 52, appendix D,
design certification rule is also requested for the plant-specific
Design Control Document Tier 1 material departures.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below with NRC staff's edits in
square brackets:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to specify the inspection of the excore
source, intermediate, and power range detectors is done to verify
that aluminum surfaces are contained in stainless steel or titanium,
and avoids the introduction of aluminum into the post-loss of
coolant accident (LOCA) containment environment due to detector
materials. The proposed change does not alter any safety related
functions. The materials of construction are compatible with the
post-LOCA conditions inside containment and will not significantly
contribute to hydrogen generation or chemical precipitates. The
change does not affect the operation of any systems or equipment
that initiate an analyzed accident or alter any structures, systems,
and components (SSC) accident initiator or initiating sequence of
events.
The change does not impact the support, design, or operation of
mechanical and fluid systems. There is no change to plant systems or
the response of systems to postulated accident conditions. There is
no change to the predicted radioactive releases due to normal
operation or postulated accident conditions. Consequently, the plant
response to previously evaluated accidents or external events is not
adversely affected, nor does the proposed change create any new
accident precursors.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change does not affect the operation of any systems
or equipment that may initiate a new or different kind of accident,
or alter any SSC such that a new accident initiator or initiating
sequence of events is created. The proposed change to specify the
inspection of the excore source, intermediate, and power range
detectors is done to verify that aluminum surfaces are contained in
stainless steel or titanium, and avoids the introduction of aluminum
into the post-LOCA containment environment due to detector
materials. In addition, the proposed change to the ITAAC
[inspections, tests, analysis, and acceptance criteria] verified
materials of construction does not alter the design function of the
excore detectors. The detector canning materials of construction are
compatible with the post-LOCA containment environment and do not
contribute a significant amount of hydrogen or chemical
precipitates. The change to the ITAAC aligns the inspection with the
Tier 2 design feature. Consequently, because the excore detectors
functions are unchanged, there are no adverse effects on accidents
previously evaluated in the UFSAR.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change to specify the inspection of the excore
source, intermediate, and power range detectors is done to verify
that aluminum surfaces are contained in stainless steel or titanium,
and avoids the introduction of aluminum into the post-LOCA
containment environment, does not alter any safety-related
equipment, applicable design codes, code compliance, design
function, or safety analysis. Consequently, no safety analysis or
design basis acceptance limit/criterion is challenged or exceeded by
the proposed change, thus the margin of safety is not reduced.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Ms. Kathryn M. Sutton, Morgan, Lewis &
Bockius, LLC, 1111 Pennsylvania Avenue NW., Washington, DC 20004-2514.
NRC Branch Chief: Jennifer Dixon-Herrity.
Southern California Edison Company, et al., Docket Nos. 50-206, 50-361,
and 50-362, San Onofre Nuclear Generating Station (SONGS), Units 1, 2,
and 3, San Diego County, California
Date of amendment request: December 15, 2016. A publicly-available
version is in ADAMS under Accession No. ML16355A014.
Description of amendment request: The proposed amendment would
revise the Facility Operating Licenses and associated Technical
Specifications (TS) for SONGS, Units 1, 2, and 3, to reflect removal of
all spent nuclear fuel from the SONGS, Units 2 and 3 spent fuel pools
(SFPs) and its transfer to dry cask storage within an onsite
independent spent fuel storage installation (ISFSI). The proposed
changes would also make conforming changes to the SONGS, Unit 1 TS and
combine them with the SONGS, Units 2 and 3 TS. These changes will more
fully reflect the permanently shutdown and defueled status of the
facility, as well as the reduced scope of structures, systems, and
components necessary to ensure plant safety once all spent fuel has
been permanently moved to the SONGS ISFSI, an activity which is
currently scheduled for completion in 2019.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment would modify the SONGS, Units 2 and 3
facility operating licenses and TS by deleting the portions of the
licenses and TSs that are no longer applicable to a facility with no
spent nuclear fuel stored in the SFP, while modifying the remaining
portions to correspond to all nuclear fuel stored within an ISFSI.
This amendment becomes effective upon removal of all spent nuclear
fuel from the SONGS, Units 2 and 3 SFP and its transfer to dry cask
storage within an ISFSI.
Additionally, the proposed change would revise the Unit 1 TSs
for consistency with the proposed changes to the Units 2 and 3 TSs.
Similar to the changes for Units 2 and 3, the Unit 1 changes delete
portions of the TSs that are no longer applicable to a facility with
spent fuel no longer stored in the SFP, while modifying the
remaining portions to correspond to all nuclear fuel in dry storage.
The Unit 1 TSs are also proposed to be combined with the Units 2 and
3 TSs.
The definition of safety-related Structures, Systems, and
Components (SSCs) in 10 CFR 50.2 states that safety-related SSCs are
those relied on to remain functional during and following design
basis events to assure:
1. The integrity of the reactor coolant boundary;
2. The capability to shutdown the reactor and maintain it in a
safe shutdown condition; or
3. The capability to prevent or mitigate the consequences of
accidents which could result in potential offsite exposures
comparable to the applicable guideline exposures set forth in 10 CFR
50.43(a)(1) or 100.11.
The first two criteria (integrity of the reactor coolant
pressure boundary and safe shutdown of the reactor) are not
applicable to a plant in a permanently defueled condition. The third
criterion is related to preventing or mitigating the consequences of
accidents that could result in potential offsite exposures exceeding
limits. However, after all nuclear spent fuel assemblies have been
transferred to dry cask storage within an ISFSI, none of the SSCs at
SONGS, Units 2 and 3 are required to be relied on for accident
mitigation. Therefore, none of the SSCs at
[[Page 10601]]
SONGS, Units 2 and 3 meet the definition of a safety-related SSC
stated in 10 CFR 50.2. The proposed deletion of requirements in the
TSs is not related to any systems credited in an accident analysis
at SONGS, Units 2 and 3.
Chapter 15 of the SONGS, Units 2 and 3 Updated Final Safety
Analysis Report (UFSAR) described the design basis accidents (DBAs)
related to the SFP. The majority of these postulated accidents are
predicated on spent fuel being stored in the SFP. With the removal
of the spent fuel from the SFP, there are no remaining spent fuel
assemblies to be monitored and there are no credible accidents that
require the actions of a Certified Fuel Handler, Shift Manager, or a
Certified Operator to prevent occurrence or mitigate the
consequences of an accident.
With all of the SONGS 1 operating plant above-ground structures
having been demolished and removed, and all Unit 1 spent fuel having
been removed from the SFP, there are no remaining design basis
accidents or transients in Chapter 8 of the Unit 1 Defueled Safety
Analysis Report (DSAR).
The proposed changes do not have an adverse impact on the
remaining decommissioning activities or any of their potential
consequences.
The proposed changes related to the relocation of certain
administrative requirements do not affect operating procedures or
administrative controls that have the function of preventing or
mitigating any accidents applicable to the safe management of
irradiated fuel or decommissioning of the facility.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes eliminate the operational requirements and
certain design requirements associated with the storage of the spent
fuel in the SFP, and relocate certain administrative controls to the
Decommissioning Quality Assurance Program or Licensee Controlled
Specifications (LCS).
After the removal of the spent fuel from the Units 2 and 3 SFP
and transfer to the ISFSI, there are no spent fuel assemblies that
remain in a SFP on site. Coupled with a prohibition against storage
of fuel in the Units 2 and 3 SFP (the Unit 1 SFP has been
dismantled), the potential for fuel related accidents is removed.
The proposed changes do not introduce any new failure modes.
Therefore, the proposed amendment does not create the
possibility of a new or different kind of accident from any
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The removal of all spent nuclear fuel from the SFPs into storage
in casks within an ISFSI, coupled with a prohibition against future
storage of fuel within the Units 2 and 3 SFPs (the Unit 1 SFP has
been dismantled), removes the potential for fuel related accidents.
The design basis and accident assumptions within the SONGS,
Units 1, 2 and 3 UFSARs and the TSs relating to safe management and
safe storage of spent fuel in the SFP are no longer applicable. The
proposed changes do not affect remaining plant operations, systems,
or components supporting decommissioning activities.
The proposed deletion of TS requirements is not related to any
SSCs that will be credited in the accident analysis for an
applicable postulated accident. As a result, the proposed deletions
do not affect the margin of safety associated with the accident
analysis.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Walker A. Matthews, Esquire, Southern
California Edison Company, 2244 Walnut Grove Avenue, Rosemead,
California 91770.
NRC Branch Chief: Bruce Watson.
Southern California Edison Company, et al., Docket Nos. 50-206, 50-361,
and 50-362, San Onofre Nuclear Generating Station (SONGS), Units 1, 2,
and 3, San Diego County, California
Date of amendment request: December 15, 2016. A publicly-available
version is in ADAMS under Accession No. ML16355A015.
Description of amendment request: The proposed amendment would
revise the Permanently Defueled Emergency Plan into an Independent
Spent Fuel Storage Facility Installation (ISFSl)-Only Emergency Plan,
and revise the Emergency Action Level (EAL) scheme into an ISFSl-Only
EAL scheme, for SONGS, Units 1, 2, and 3. The proposed changes would
more fully reflect the permanently shutdown and defueled status of the
facility, as well as the reduced scope of potential radiological
accidents once all spent fuel has been moved to dry cask storage within
the onsite SONGS ISFSI, an activity which is currently scheduled for
completion in 2019.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendments would modify the SONGS, Units 1, 2 and 3
licenses by revising the emergency plan and revising the EAL scheme.
The SONGS units have permanently ceased operation and are
permanently defueled. The proposed amendments are conditioned on all
spent nuclear fuel being removed from wet storage in the spent fuel
pools and placed in dry storage within an ISFSI. Occurrence of
postulated accidents associated with spent fuel stored in a spent
fuel pool is no longer credible in a spent fuel pool devoid of such
fuel. The proposed amendments have no effect on plant systems,
structures, and components (SSCs) and no effect on the capability of
any plant SSC to perform its design function. The proposed
amendments would not increase the likelihood of the malfunction of
any plant SSC. The proposed amendments would have no effect on any
of the previously evaluated accidents in the SONGS Updated Final
Safety Analysis Report (UFSAR).
Since SONGS has permanently ceased operation, the generation of
fission products has ceased and the remaining source term continues
to decay. This continues to significantly reduce the consequences of
previously postulated accidents.
Therefore, the proposed amendments do not involve a significant
increase in the consequences of a previously evaluated accident.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed amendments constitute a revision of the emergency
planning function commensurate with the ongoing and anticipated
reduction in radiological source term at SONGS.
The proposed amendments do not involve a physical alteration of
the plant. No new or different types of equipment will be installed
and there are no physical modifications to existing equipment as a
result of the proposed amendments. Similarly, the proposed
amendments would not physically change any SSCs involved in the
mitigation of any postulated accidents. Thus, no new initiators or
precursors of a new or different kind of accident are created.
Furthermore, the proposed amendments do not create the possibility
of a new failure mode associated with any equipment or personnel
failures. The credible events for the ISFSI remain unchanged.
Therefore, the proposed amendments do not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
Because the 10 CFR part 50 licenses for SONGS no longer
authorize operation of the reactors or emplacement or retention of
fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2),
the occurrence of postulated accidents associated with reactor
operation is
[[Page 10602]]
no longer credible. With all nuclear spent fuel transferred out of
wet storage from the spent fuel pools and placed in dry storage
within the ISFSI, a fuel handling accident is no longer credible.
There are no longer credible events that would result in any
releases beyond the Exclusion Area Boundary (EAB) exceeding the U.S.
Environmental Protection Agency (EPA) Protective Action Guideline
(PAG) exposure levels, as detailed in the EPA's ``Protective Action
Guide and Planning Guidance for Radiological Incidents,'' Draft for
Interim Use and Public Comment dated March 2013 (PAG Manual).
The proposed amendments do not involve a change in the plant's
design, configuration, or operation. The proposed amendments do not
affect either the way in which the plant structures, systems, and
components perform their safety function or their design margins.
Because there is no change to the physical design of the plant,
there is no change to any of these margins.
Therefore, the proposed amendments do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Walker A. Matthews, Esquire, Southern
California Edison Company, 2244 Walnut Grove Avenue, Rosemead,
California 91770.
NRC Branch Chief: Bruce Watson.
Southern Nuclear Operating Company, Docket Nos. 52-025 and 52-026,
Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia
Date of amendment request: August 31, 2016. A publicly-available
version is in ADAMS under Accession No. ML16244A253.
Description of amendment request: The amendment request proposes
changes to the Updated Final Safety Analysis Report (UFSAR) in the form
of departures from the incorporated plant-specific Design Control
Document (DCD) Tier 2 information and a combined license (COL) License
Condition which references one of the proposed changes. Additionally,
the proposed changes to the UFSAR eliminate pressurizer spray line
monitoring during pressurizer surge line first plant only testing. In
addition, these proposed changes correct inconsistencies in testing
purpose, testing duration, and the ability to leave equipment in place
following the data collection period. These changes involve material
which is specifically referenced in Section 2.D.(2) of the COLs. This
submittal requests approval of the license amendment necessary to
implement these changes.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below with NRC staff edits in square
brackets:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The design functions of the RCS [reactor coolant system] include
providing an effective reactor coolant pressure boundary. The
proposed changes for removing the requirement to install temporary
instrumentation on the pressurizer spray line during the monitoring
of the pressurizer surge line for thermal stratification and thermal
cycling during hot functional testing and during the first fuel
cycle for the first plant only, proposed changes to parameter
retention requirements, and proposed change to remove the
pressurizer spray and surge line valve leakage requirement do not
impact the existing design requirements for the RCS. These changes
are acceptable as they are consistent with the commitments made for
the pressurizer surge line monitoring program for the first plant
only, and do not adversely affect the capability of the pressurizer
surge line and pressurizer spray lines to perform the required
reactor coolant pressure boundary design functions.
These proposed changes to the monitoring of the pressurizer
surge line for thermal stratification and thermal cycling during hot
functional testing and during the first fuel cycle for the first
plant only, proposed changes to parameter retention requirements,
and proposed change to remove the pressurizer spray and surge line
valve leakage requirement as described in the current licensing
basis do not have an adverse effect on any of the design functions
of the systems. The proposed changes do not affect the support,
design, or operation of mechanical and fluid systems required to
mitigate the consequences of an accident. There is no change to
plant systems or the response of systems to postulated accident
conditions. There is no change to the predicted radioactive releases
due to postulated accident conditions. The plant response to
previously evaluated accidents or external events is not adversely
affected, nor do the proposed changes create any new accident
precursors.
Therefore, the requested amendment does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes for removing the requirement to install
temporary instrumentation on the pressurizer spray line during the
monitoring of the pressurizer surge line for thermal stratification
and thermal cycling during hot functional testing and during the
first fuel cycle for the first plant only, proposed changes to
parameter retention requirements, and proposed change to remove the
pressurizer spray and surge line valve leakage requirement as
described in the current licensing basis maintain the required
design functions, and are consistent with other Updated Final Safety
Analysis Report (UFSAR) information. The proposed changes do not
adversely affect the design requirements for the RCS, including the
pressurizer surge line and pressurizer spray lines. The proposed
changes do not adversely affect the design function, support,
design, or operation of mechanical and fluid systems. The proposed
changes do not result in a new failure mechanism or introduce any
new accident precursors. No design function described in the UFSAR
is adversely affected by the proposed changes.
Therefore, the requested amendment does not create the
possibility of a new or different kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
No safety analysis or design basis acceptance limit/criterion is
challenged or exceeded by the proposed changes, and no margin of
safety is reduced.
Therefore, the requested amendment does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP,
1710 Sixth Avenue North, Birmingham, AL 35203-2015.
NRC Branch Chief: Jennifer Dixon-Herrity.
III. Notice of Issuance of Amendments to Facility Operating Licenses
and Combined Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR chapter I, which are set
forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or combined license, as applicable, proposed no
significant
[[Page 10603]]
hazards consideration determination, and opportunity for a hearing in
connection with these actions, was published in the Federal Register as
indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental Assessment as
indicated. All of these items can be accessed as described in the
``Obtaining Information and Submitting Comments'' section of this
document.
Dominion Nuclear Connecticut, Inc., Docket No. 50-336, Millstone Power
Station, Unit No. 2, New London County, Connecticut
Date of amendment request: May 25, 2016, as supplemented by letters
dated June 15, 2016, and October 18, 2016.
Brief description of amendment: The amendment revised the Millstone
Power Station, Unit No. 2, Technical Specifications (TSs) to add the
evaluation model EMF-2103(P)(A), Revision 3, ``Realistic Large Break
LOCA Methodology for Pressurized Water Reactors'' (ADAMS Package
Accession No. ML16286A579), to the TS Section 6.9.1.8.b list of
analytical methods use to establish core operating limits.
Date of issuance: January 24, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 332. A publicly-available version is in ADAMS under
Accession No. ML17025A218; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-65: Amendment revised
the Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: August 30, 2016 (81 FR
59662). The supplemental letters dated June 15, 2016, and October 18,
2016, provided additional information that clarified the application,
did not expand the scope of the application as originally noticed, and
did not change the staff's original proposed no significant hazards
consideration determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 24, 2017.
No significant hazards consideration comments received: No.
Entergy Nuclear Operations, Inc., Docket No. 50-286, Indian Point
Nuclear Generating Unit No. 3, Westchester County, New York
Entergy Nuclear Operations, Inc., Docket No. 50-333, James A.
FitzPatrick Nuclear Power Plant, Oswego County, New York
Date of amendment request: August 16, 2016.
Brief description of amendments: The amendments modified license
conditions to reflect the transfer of the Master Decommissioning Trust
from the Power Authority of the State of New York to Entergy Nuclear
Operations, Inc., and deletes other conditions so as to apply the
requirements of 10 CFR 50.75(h)(1).
Date of issuance: January 30, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: 262 (Indian Point Nuclear Generating Unit No. 3);
313 (James A. FitzPatrick Nuclear Power Plant). A publicly-available
version is in ADAMS under Accession No. ML17025A288; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the letter dated January 27, 2017 (ADAMS Package Accession No.
ML16336A488).
Facility Operating License Nos. DPR-64 and DPR-59: Amendments
revised the Facility Operating Licenses.
Date of initial notice in Federal Register: September 27, 2016 (81
FR 66305).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 27, 2017.
Entergy Nuclear Operations, Inc., Docket No. 50-333, James A.
FitzPatrick Nuclear Power Plant, Oswego County, New York
Date of amendment request: August 29, 2016, as supplemented by
letter dated November 21, 2016.
Brief description of amendment: The amendment revised Technical
Specification 5.5.6, ``Primary Containment Leakage Rate Testing
Program,'' to allow permanent extension of Type A and Type C leak rate
test intervals through the adoption of Revision 3-A of Nuclear Energy
Institute (NEI) 94-01 and the limitations and conditions specified in
Revision 2-A of NEI 94-01 as the guidance documents for implementation
of performance-based Option B of appendix J to 10 CFR part 50, Option
B, ``Performance-Based Requirements.'' Based on the guidance in
Revision 3-A of NEI 94-01, the change allows the maximum interval for
the Type A primary containment integrated leakage rate test to extend
from once in 10 years to once in 15 years, and the Type C local leak
rate test interval to extend to 75 months, provided acceptable
performance history and other requirements are maintained.
Date of issuance: January 24, 2017.
Effective date: As of the date of issuance and shall be implemented
within 120 days of issuance.
Amendment No.: 132. A publicly-available version is in ADAMS under
Accession No. ML17009A372; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. DPR-59: The amendment
revised the Renewed Facility Operating License and the Technical
Specifications.
Date of initial notice in Federal Register: October 11, 2016 (81 FR
70178). The supplemental letter dated November 21, 2016, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the NRC staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 24, 2017.
No significant hazards consideration comments received: No.
FirstEnergy Nuclear Operating Company, et al., Docket No. 50-346,
Davis-Besse Nuclear Power Station (DBNPS), Unit No. 1, Ottawa County,
Ohio
Date of application for amendment: February 17, 2016, as
supplemented by letter dated September 6, 2016.
Brief description of amendment: The amendment changed the DBNPS
emergency plan by revising the emergency action level scheme.
Date of issuance: January 12, 2017.
Effective date: As of the date of issuance and shall be implemented
within 180 days from the date of issuance.
[[Page 10604]]
Amendment No.: 294. A publicly-available version is in ADAMS under
Accession No. ML16342C946; documents related to this amendment are
listed in the Safely Evaluation enclosed with the amendment.
Renewed Facility Operating License No. NPF-3: The amendment revised
the emergency plan.
Date of initial notice in Federal Register: March 15, 2016 (81 FR
13843).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 12, 2017.
No significant hazards consideration comments received: No.
South Carolina Electric & Gas Company, South Carolina Public Service
Authority, Docket No. 50-395, Virgil C. Summer Nuclear Station, Unit
No. 1, Fairfield County, South Carolina
Date of amendment request: August 29, 2016.
Brief description of amendment: This amendment approves a change to
the administrative controls associated with the Limiting Condition for
Operation (LCO) of Technical Specification (TS) 3.5.4, ``Refueling
Water Storage Tank.''
Date of issuance: January 18, 2017.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment No.: 207. A publicly-available version is in ADAMS under
Accession No. ML16348A200; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. NPF-12: Amendment revised
the Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: October 11, 2016 (81 FR
70183).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 18, 2017.
No significant hazards consideration comments received: No.
Southern California Edison Company, et al., Docket Nos. 50-361 and 50-
362, San Onofre Nuclear Generating Station (SONGS), Units 2 and 3, San
Diego County, California
Date of amendment request: June 16, 2016, as supplemented by letter
dated September 6, 2016.
Brief description of amendments: The amendments revised the
scheduled implementation date for Milestone 8 of the SONGS, Units 2 and
3, Cyber Security Plan to December 31, 2019, in order to more fully
reflect the permanently shutdown status of the facility and accommodate
ongoing decommissioning activities.
Date of issuance: January 23, 2017.
Effective date: As of its date of issuance and shall be implemented
within 60 days.
Amendment Nos.: Unit 2-234 and Unit 3-227: A publicly-available
version is in ADAMS under Accession No. ML16252A207; documents related
to these amendments are listed in the Safety Evaluation enclosed with
the amendments.
Facility Operating License Nos. NPF-10 and NPF-15: The amendments
revised the Facility Operating Licenses.
Date of initial notice in Federal Register: August 2, 2016 (81 FR
50735). The supplemental letter dated September 6, 2016, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated January 23, 2017.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Inc., Docket No. 50-364, Joseph M.
Farley Nuclear Plant, Unit 2, Houston County, Alabama
Date of amendment request: September 8, 2016.
Brief description of amendment: The amendment corrected an error in
the Joseph M. Farley Nuclear Plant, Unit 2, Renewed Facility Operating
License No. NPF-8, for Condition 2.C.(23). Specifically, the Unit 2
referenced date representing the start of the 20-year period of
extended operation was incorrectly entered as June 25, 2017. The Unit 2
correct date corresponding to the 20-year period of extended operation
is March 31, 2021.
Date of issuance: January 23, 2017.
Effective date: As of its date of issuance and shall be implemented
within 90 days of issuance.
Amendment No.: 204. A publicly-available version is in ADAMS under
Accession No. ML15329A032; documents related to this amendment is
listed in the Safety Evaluation enclosed with the amendment.
Renewed Facility Operating License No. NPF-8: Amendment revised the
Renewed Facility Operating License.
Date of initial notice in Federal Register: October 25, 2016 (81 FR
73441).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 23, 2017.
No significant hazards consideration comments received: No.
Southern Nuclear Operating Company, Inc., Docket Nos. 50-348 and 50-
364, Joseph M. Farley Nuclear Plant (Farley), Units 1 and 2, Houston
County, Alabama
Southern Nuclear Operating Company, Inc., Docket Nos. 50-424 and 50-
425, Vogtle Electric Generating Plant (Vogtle), Units 1 and 2, Burke
County, Georgia
Southern Nuclear Operating Company, Inc., Georgia Power Company,
Oglethorpe Power Corporation, Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50-321 and 50-366, Edwin I. Hatch
Nuclear Plant (Hatch), Unit Nos. 1 and 2, Appling County, Georgia
Date of amendment request: March 14, 2016, as supplemented by
letters dated May 17, 2016, and October 26, 2016.
Brief description of amendments: The amendments consist of changes
that insert generic personnel titles in lieu of plant-specific
personnel titles. In addition, the term ``plant-specific titles'' is
replaced with ``generic titles'' in Technical Specification (TS)
5.2.1.a for each plant. Lastly, this change revised the Hatch, Unit
Nos. 1 and 2, TS 5.1 to be consistent with the corresponding Farley,
Units 1 and 2, and Vogtle, Units 1 and 2, TS 5.1, and make it
consistent with the corresponding Improved Standard Technical
Specifications section.
Date of issuance: January 13, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: Farley--Unit 1 (207) and Unit 2 (203); Vogtle--Unit
1 (183) and Unit 2 (166); and Hatch--Unit No. 1 (282) and Unit No. 2
(227). A publicly-available version is in ADAMS under Accession No.
ML16291A030; documents related to these amendments are listed in the
Safety Evaluation enclosed with the amendments.
Renewed Facility Operating License Nos. NPF-2, NPF-8, NPF-68, NPF-
81, DPR-57, and NPF-5: Amendments revised the Renewed Facility
Operating Licenses and TSs.
Date of initial notice in Federal Register: May 24, 2016 (81 FR
32809). The supplemental letters dated May 17,
[[Page 10605]]
2016, and October 26, 2016, provided additional information that
clarified the application, did not expand the scope of the application
as originally noticed, and did not change the staff's original proposed
no significant hazards consideration determination as published in the
Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated January 13, 2017.
No significant hazards consideration comments received: No.
Susquehanna Nuclear, LLC, Docket No. 50-388, Susquehanna Steam Electric
Station, Unit 2, Luzerne County, Pennsylvania
Date of amendment request: January 28, 2016, as supplemented by
letters April 6, 2016, and October 10, 2016.
Brief description of amendment: The amendment revised Technical
Specification (TS) 3.7.1, ``Residual Heat Removal Service Water (RHRSW)
System and the Ultimate Heat Sink (UHS),'' and TS 3.8.7, ``Distribution
Systems--Operating,'' to increase the completion time for Conditions A
and B of TS 3.7.1, and Condition C of TS 3.8.7, from 72 hours to 7
days, in order to accommodate 480 volt engineered safeguard system load
center transformer replacements on the Susquehanna Steam Electric
Station, Unit 1. The change is temporary and will be annotated by a
note in each TS that specifies the allowance expires on June 15, 2020.
Date of issuance: January 26, 2017.
Effective date: As of the date of issuance and shall be implemented
within 30 days of issuance.
Amendment No.: 248. A publicly-available version is in ADAMS under
Accession No. ML17004A250; documents related to this amendment are
listed in the Safety Evaluation enclosed with the amendment.
Facility Operating License No. NPF-22: The amendment revised the
Renewed Facility Operating License and TSs.
Date of initial notice in Federal Register: May 24, 2016 (81 FR
32810). The supplemental letter dated October 10, 2016, provided
additional information that clarified the application, did not expand
the scope of the application as originally noticed, and did not change
the staff's original proposed no significant hazards consideration
determination as published in the Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated January 26, 2017.
No significant hazards consideration comments received: No.
Tennessee Valley Authority, Docket Nos. 50-259, 50-260, and 50-296,
Browns Ferry Nuclear Plant, Units 1, 2 and 3, Limestone County, Alabama
Date of amendment request: August 12, 2016.
Brief description of amendments: The amendments revised Technical
Specification (TS) 4.3.1.2, ``Fuel Storage Criticality,'' for Units 1,
2, and 3, to preclude the placement of fuel in the new fuel storage
vaults. This TS change removed the existing TS 4.3.1.2 criticality
criteria wording in its entirety, and replaced it with language that
specifically restricts the placement of fuel in the new fuel storage
vaults.
Date of issuance: January 17, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment Nos.: 296 (Unit 1), 320 (Unit 2), and 280 (Unit 3). A
publicly-available version is in ADAMS under Accession No. ML16330A158;
documents related to these amendments are listed in the Safety
Evaluation enclosed with the amendments.
Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68:
Amendments revised the Renewed Facility Operating Licenses and TSs.
Date of initial notice in Federal Register: October 11, 2016 (81 FR
70187).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 17, 2017.
No significant hazards consideration comments received: No.
Tennessee Valley Authority, Docket Nos. 50-390 and 50-391, Watts Bar
Nuclear Plant, Units 1 and 2, Rhea County, Tennessee
Date of amendment request: December 8, 2015, as supplemented by
letters dated March 11, October 13, December 1, and December 8, 2016.
Brief description of amendment: The amendment revised the Watts Bar
Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.1, ``AC
Sources--Operating,'' to extend the Completion Time for one inoperable
Diesel Generator from 72 hours to 10 days based on the availability of
a supplemental alternating current power source (specifically, the FLEX
DG added as part of the mitigating strategies for beyond-design-basis
events in response to NRC Order EA-12-049). The amendment also made
clarifying changes to certain TS 3.8.1 Conditions, Required Actions,
and Surveillance Requirements.
Date of issuance: January 13, 2017.
Effective date: As of the date of issuance and shall be implemented
within 60 days of issuance.
Amendment No.: 110 (Unit 1) and 5 (Unit 2). A publicly-available
version is in ADAMS under Accession No. ML17006A271; documents related
to this amendment are listed in the Safety Evaluation enclosed with the
amendment.
Facility Operating License Nos. NPF-90 and NPF-96: Amendments
revised the Facility Operating Licenses and Technical Specifications.
Date of initial notice in Federal Register: May 24, 2016 (81 FR
32810). The supplement letters dated October 13, November 1, and
December 8, 2016, provided additional information that clarified the
application, did not expand the scope of the application as originally
noticed, and did not change the staff's original proposed no
significant hazards consideration determination as published in the
Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated January 13, 2017.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 6th day of February 2017.
For the Nuclear Regulatory Commission.
Anne T. Boland,
Director, Division of Operating Reactor Licensing, Office of Nuclear
Reactor Regulation.
[FR Doc. 2017-02795 Filed 2-13-17; 8:45 am]
BILLING CODE 7590-01-P