Projects Rescinded for Consumptive Uses of Water, 10177 [2017-02680]
Download as PDF
Federal Register / Vol. 82, No. 26 / Thursday, February 9, 2017 / Notices
SURFACE TRANSPORTATION BOARD
[Docket No. FD 36090]
sradovich on DSK3GMQ082PROD with NOTICES
Watco Holdings, Inc.—Continuance in
Control Exemption—Jacksonville Port
Terminal Railroad, L.L.C.
Watco Holdings, Inc. (Watco), a
noncarrier, has filed a verified notice of
exemption pursuant to 49 CFR
1180.2(d)(2) to continue in control of
Jacksonville Port Terminal Railroad,
L.L.C. (JXPT), upon JXPT’s becoming a
Class III rail carrier. Watco owns,
indirectly, 100% of the issued and
outstanding stock of JXPT, a limited
liability company.
This transaction is related to a
concurrently filed verified notice of
exemption in Jacksonville Port Terminal
Railroad, L.L.C.—Operating
Exemption—The Jacksonville Port
Authority, Docket No. FD 36089, in
which JXPT seeks Board approval to
operate over approximately 10 miles of
rail line owned by The Jacksonville Port
Authority at the Talleyrand Docks and
Terminal in Jacksonville, Duval County,
Fla. (the Line). The Line runs from F&J
Junction (between Norfolk Southern
Railway milepost 5–C and CSX
Transportation milepost 632.08) to
Municipal Docks Railway milepost
10.33 within the Talleyrand Marine
Terminal.
The transaction may be consummated
on or after February 23, 2017, the
effective date of the exemption.
Watco currently controls, indirectly,
34 Class III rail carriers and one Class
II rail carrier, collectively operating in
24 states. For a complete list of these
rail carriers and the states in which they
operate, see Watco’s notice of
exemption filed on January 24, 2017.
The notice is available on the Board’s
Web site at ‘‘WWW.STB.GOV.’’
Watco represents that: (1) The rail line
to be operated by JXPT does not connect
with any other railroads operated by the
carrier in the Watco’s corporate family;
(2) the continuance in control is not part
of a series of anticipated transactions
that would connect the rail line to be
operated by JXPT with any other
railroad in applicant’s corporate family;
and (3) the transaction does not involve
a Class I rail carrier. Therefore, the
transaction is exempt from the prior
approval requirements of 49 U.S.C.
11323. See 49 CFR 1180.2(d)(2).
Under 49 U.S.C. 10502(g), the Board
may not use its exemption authority to
relieve a rail carrier of its statutory
obligation to protect the interests of its
employees. Because the transaction
involves control of one Class II and one
or more Class III rail carriers, the
transaction is subject to the labor
VerDate Sep<11>2014
18:11 Feb 08, 2017
Jkt 241001
protection requirements of Section
11326(b) and Wisconsin Central Ltd.—
Acquisition Exemption—Lines of Union
Pacific Railroad, 2 S.T.B. 218 (1997).
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Stay petitions must be
filed no later than February 16, 2017 (at
least seven days before the exemption
becomes effective).
An original and 10 copies of all
pleadings, referring to Docket No. FD
36090, must be filed with the Surface
Transportation Board, 395 E Street SW.,
Washington, DC 20423–0001. In
addition, one copy of each pleading
must be served on Karl Morell, Karl
Morell & Associates, Suite 225, 655
Fifteenth St. NW., Washington, DC
20005.
Board decisions and notices are
available on our Web site at
‘‘WWW.STB.GOV.’’
Decided: February 3, 2017.
By the Board, Scott M. Zimmerman, Acting
Director, Office of Proceedings.
Raina S. Contee,
Clearance Clerk.
[FR Doc. 2017–02705 Filed 2–8–17; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Rescinded for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists the approved
by rule projects rescinded by the
Susquehanna River Basin Commission
during the period set forth in DATES.
DATES: January 1–31, 2017.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel,
telephone: (717) 238–0423, ext. 1312;
fax: (717) 238–2436; email: joyler@
srbc.net. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, being rescinded for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(e)
SUMMARY:
PO 00000
Frm 00195
Fmt 4703
Sfmt 4703
10177
and 806.22(f) for the time period
specified above:
Rescinded ABR Issued
1. XTO Energy Incorporated, Pad ID:
Booth, ABR–20091226.R1, Shrewsbury
Township, Lycoming County, Pa.;
Rescind Date: January 12, 2017.
2. XTO Energy Incorporated, Pad ID:
Hazlak, ABR–20090715.R1, Shrewsbury
Township, Lycoming County, Pa.;
Rescind Date: January 12, 2017
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806, 807, and 808.
Dated: February 6, 2017.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2017–02680 Filed 2–8–17; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists the projects
approved by rule by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: January 1–31, 2017.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel,
telephone: (717) 238–0423, ext. 1312;
fax: (717) 238–2436; email: joyler@
srbc.net. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(f) for
the time period specified above:
SUMMARY:
Approvals by Rule Issued Under 18
CFR 806.22(f)
1. Cabot Oil & Gas Corporation, Pad
ID: Jeffers Farms P1, ABR–
201112003.R1, Harford Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 3.5750 mgd; Approval
Date: January 4, 2017.
2. Cabot Oil & Gas Corporation, Pad
ID: ZuppK P1, ABR–201112004.R1,
Harford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
3.5750 mgd; Approval Date: January 4,
2017.
3. Cabot Oil & Gas Corporation, Pad
ID: MacDowallR P1, ABR–
E:\FR\FM\09FEN1.SGM
09FEN1
Agencies
[Federal Register Volume 82, Number 26 (Thursday, February 9, 2017)]
[Notices]
[Page 10177]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-02680]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Rescinded for Consumptive Uses of Water
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists the approved by rule projects rescinded by
the Susquehanna River Basin Commission during the period set forth in
DATES.
DATES: January 1-31, 2017.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel,
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email:
joyler@srbc.net. Regular mail inquiries may be sent to the above
address.
SUPPLEMENTARY INFORMATION: This notice lists the projects, described
below, being rescinded for the consumptive use of water pursuant to the
Commission's approval by rule process set forth in 18 CFR 806.22(e) and
806.22(f) for the time period specified above:
Rescinded ABR Issued
1. XTO Energy Incorporated, Pad ID: Booth, ABR-20091226.R1,
Shrewsbury Township, Lycoming County, Pa.; Rescind Date: January 12,
2017.
2. XTO Energy Incorporated, Pad ID: Hazlak, ABR-20090715.R1,
Shrewsbury Township, Lycoming County, Pa.; Rescind Date: January 12,
2017
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: February 6, 2017.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2017-02680 Filed 2-8-17; 8:45 am]
BILLING CODE 7040-01-P