Download as PDF Federal Register / Vol. 82, No. 21 / Thursday, February 2, 2017 / Notices CMS’ August 22, 2016 final rule. For FY17, the market basket is 2.7 percent. Note: Medicare’s FY17 market basket index adjusts according to hospitals’ compliance with quality data and electronic health record meaningful use submissions. These adjustments do not apply to the TRICARE Program. E. Outlier Payments Since TRICARE does not include capital payments in our DRG-based payments (TRICARE reimburses hospitals for their capital costs as reported annually to the contractor on a pass through basis), we will use the fixed loss cost outlier threshold calculated by CMS for paying cost outliers in the absence of capital prospective payments. For FY17, the TRICARE fixed loss cost outlier threshold is based on the sum of the applicable DRG-based payment rate plus any amounts payable for IDME plus a fixed dollar amount. Thus, for FY17, in order for a case to qualify for cost outlier payments, the costs must exceed the TRICARE DRG base payment rate (wage adjusted) for the DRG plus the IDME payment (if applicable) plus $21,710 (wage adjusted). The marginal cost factor for cost outliers continues to be 80 percent. mstockstill on DSK3G9T082PROD with NOTICES F. National Operating Standard Cost as a Share of Total Costs The FY17 TRICARE National Operating Standard Cost as a Share of Total Costs (NOSCASTC) used in calculating the cost outlier threshold is 0.921. TRICARE uses the same methodology as CMS for calculating the NOSCASTC; however, the variables are different because TRICARE uses national cost to charge ratios while CMS uses hospital specific cost to charge ratios. G. IDME Adjustment Passage of the Medical Modernization Act of 2003 modified the formula multipliers to be used in the calculation of IDME adjustment factor. Since the IDME formula used by TRICARE does not include disproportionate share hospitals, the variables in the formula are different than Medicare’s; however, the percentage reductions that will be applied to Medicare’s formula will also be applied to the TRICARE IDME formula. The multiplier for the IDME adjustment factor for TRICARE for FY17 is 1.02. H. Cost to Charge Ratio TRICARE uses a national Medicare cost-to-charge ratio (CCR). For FY17, the Medicare CCR used for the TRICARE DRG-based payment system for acute VerDate Sep<11>2014 16:31 Feb 01, 2017 Jkt 241001 care hospitals and neonates will be 0.2541. This is based on a weighted average of the hospital-specific Medicare CCRs (weighted by the number of Medicare discharges) after excluding hospitals not subject to the TRICARE DRG system (Sole Community Hospitals, Indian Health Service hospitals, and hospitals in Maryland). The Medicare CCR is used to calculate cost outlier payments, except for children’s hospitals. The Medicare CCR has been increased by a factor of 1.0065 to include an additional allowance for bad debt. The 1.0065 factor reflects the provisions of the Middle Class Tax Relief and Job Creation Act of 2012. For children’s hospital cost outliers, the CCR used is 0.2760. I. Pricing of Claims The final rule published on May 21, 2014 (79 FR 29085) set forth all final claims with discharge dates of October 1, 2014, or later and reimbursed under the TRICARE DRG-Based payment system, are to be priced using the rules, weights and rates in effect on as of the date of discharge. Prior to this, all final claims were priced using the rules, weights, and rates in effective as of the date of admission. J. Updated Rates and Weights The updated rates and weights are accessible through the Internet at https:// www.health.mil/rates. The implementing regulations for the TRICARE/CHAMPUS DRG-based payment system are in 32 CFR part 199. Dated: January 30, 2017. Aaron Siegel, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 2017–02202 Filed 2–1–17; 8:45 am] BILLING CODE 5001–06–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC17–68–000. Applicants: AIA Energy North America LLC, Duquesne Light Company, Duquesne Power, LLC. Description: Application for Authorization under Section 203 of the FPA and Request for Expedited Action, et al. of AIA Energy North America LLC, et al. Filed Date: 1/26/17. Accession Number: 20170126–5201. PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 9063 Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: EC17–69–000. Applicants: American Electric Power Service Corporation, Indiana Michigan Power Company. Description: Application for Authorization under Section 203 of the FPA of American Electric Power Service Corporation, et al. Filed Date: 1/26/17. Accession Number: 20170126–5208. Comments Due: 5 p.m. ET 2/16/17. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1316–003; ER11–2753–004; ER13–413–004; ER11– 1933–006; ER12–1329–004; ER16–1888– 003. Applicants: Silver State Solar Power North, LLC, Cedar Point Wind, LLC, USG Oregon LLC, Green Mountain Power Corporation, Wildcat Wind Farm I, LLC, Tidal Energy Marketing Inc. Description: Notice of Change in Status of Silver State Solar Power North, LLC, et al. Filed Date: 1/26/17. Accession Number: 20170126–5207. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER15–535–003. Applicants: Nevada Power Company. Description: Compliance filing: OATT Order No. 676–H Compliance Filing 01.25.17 to be effective 2/1/2017. Filed Date: 1/26/17. Accession Number: 20170126–5095. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER17–626–001. Applicants: Long Beach Peakers LLC. Description: Tariff Amendment: Amendment to Tariff Revision Filing to be effective 12/23/2016. Filed Date: 1/26/17. Accession Number: 20170126–5115. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER17–856–000. Applicants: PJM Interconnection, L.L.C., Rockland Electric Company. Description: § 205(d) Rate Filing: RECO Request for Increase of Annual Transmission Revenue Requirement to be effective 4/3/2017. Filed Date: 1/26/17. Accession Number: 20170126–5152. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER17–857–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: Revisions to Attach. K Related to Public Policy Trans. Study Process Timeline to be effective 3/27/2017. Filed Date: 1/26/17. Accession Number: 20170126–5166. Comments Due: 5 p.m. ET 2/16/17. E:\FR\FM\02FEN1.SGM 02FEN1 mstockstill on DSK3G9T082PROD with NOTICES 9064 Federal Register / Vol. 82, No. 21 / Thursday, February 2, 2017 / Notices Docket Numbers: ER17–858–000. Applicants: 67RK 8me LLC. Description: § 205(d) Rate Filing: CoTenancy Agreement to be effective 1/27/ 2017. Filed Date: 1/26/17. Accession Number: 20170126–5167. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER17–859–000. Applicants: 65HK 8me LLC. Description: § 205(d) Rate Filing: CoTenancy Agreement to be effective 1/27/ 2017. Filed Date: 1/26/17. Accession Number: 20170126–5168. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER17–860–000. Applicants: 87RL 8me LLC. Description: § 205(d) Rate Filing: CoTenancy Agreement to be effective 1/27/ 2017. Filed Date: 1/26/17. Accession Number: 20170126–5169. Comments Due: 5 p.m. ET 2/16/17. Docket Numbers: ER17–861–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2017–01–27_Schedule 31 Annual Update Filing to be effective 4/1/2017. Filed Date: 1/27/17. Accession Number: 20170127–5029. Comments Due: 5 p.m. ET 2/17/17. Docket Numbers: ER17–862–000. Applicants: Bethel Wind Farm LLC. Description: § 205(d) Rate Filing: Amendment of Bethel Wind Farm MBR Tariff to be effective 1/28/2017. Filed Date: 1/27/17. Accession Number: 20170127–5031. Comments Due: 5 p.m. ET 2/17/17. Docket Numbers: ER17–863–000. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Commonwealth Edison Company Submits PBOP Filing to be effective 3/ 27/2017. Filed Date: 1/27/17. Accession Number: 20170127–5034. Comments Due: 5 p.m. ET 2/17/17. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH17–7–000. Applicants: Oaktree Capital Group, LLC. Description: Oaktree Capital Group, LLC FERC 65–B Waiver Notification. Filed Date: 1/26/17. Accession Number: 20170126–5211. Comments Due: 5 p.m. ET 2/16/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings VerDate Sep<11>2014 16:31 Feb 01, 2017 Jkt 241001 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 27, 2017. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2017–02225 Filed 2–1–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF17–3–000] Cheniere Midstream Holdings, Inc.; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Midcontinent Supply Header Interstate Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Sessions The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Midcontinent Supply Header Interstate Pipeline Project (MIDSHIP Project) involving construction and operation of facilities by Cheniere Midstream Holdings, Inc. (Cheniere Midstream) in Kingfisher, Canadian, Grady, Garvin, Stephens, Carter, Johnston, and Bryan Counties, Oklahoma and leased capacity on existing pipeline infrastructure in Oklahoma, Texas, and Louisiana. The Commission will use this EIS in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EIS. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before February 27, 2017. If you sent comments on this project to the Commission before the opening of this docket on November 9, 2016, you will need to file those comments in Docket No. PF17–3–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. A fact sheet prepared by FERC entitled ‘‘An Interstate Natural Gas Facility on My Land? What Do I Need to Know?’’ is available for viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Public Participation For your convenience, there are four methods you can use to submit your comments to the Commission. The Commission will provide equal consideration to all comments received, whether filed in written form or provided verbally. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to E:\FR\FM\02FEN1.SGM 02FEN1

Agencies

[Federal Register Volume 82, Number 21 (Thursday, February 2, 2017)]
[Notices]
[Pages 9063-9064]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-02225]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC17-68-000.
    Applicants: AIA Energy North America LLC, Duquesne Light Company, 
Duquesne Power, LLC.
    Description: Application for Authorization under Section 203 of the 
FPA and Request for Expedited Action, et al. of AIA Energy North 
America LLC, et al.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5201.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: EC17-69-000.
    Applicants: American Electric Power Service Corporation, Indiana 
Michigan Power Company.
    Description: Application for Authorization under Section 203 of the 
FPA of American Electric Power Service Corporation, et al.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5208.
    Comments Due: 5 p.m. ET 2/16/17.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-1316-003; ER11-2753-004; ER13-413-004; ER11-
1933-006; ER12-1329-004; ER16-1888-003.
    Applicants: Silver State Solar Power North, LLC, Cedar Point Wind, 
LLC, USG Oregon LLC, Green Mountain Power Corporation, Wildcat Wind 
Farm I, LLC, Tidal Energy Marketing Inc.
    Description: Notice of Change in Status of Silver State Solar Power 
North, LLC, et al.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5207.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER15-535-003.
    Applicants: Nevada Power Company.
    Description: Compliance filing: OATT Order No. 676-H Compliance 
Filing 01.25.17 to be effective 2/1/2017.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5095.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER17-626-001.
    Applicants: Long Beach Peakers LLC.
    Description: Tariff Amendment: Amendment to Tariff Revision Filing 
to be effective 12/23/2016.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5115.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER17-856-000.
    Applicants: PJM Interconnection, L.L.C., Rockland Electric Company.
    Description: Sec.  205(d) Rate Filing: RECO Request for Increase of 
Annual Transmission Revenue Requirement to be effective 4/3/2017.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5152.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER17-857-000.
    Applicants: ISO New England Inc., New England Power Pool 
Participants Committee.
    Description: Sec.  205(d) Rate Filing: Revisions to Attach. K 
Related to Public Policy Trans. Study Process Timeline to be effective 
3/27/2017.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5166.
    Comments Due: 5 p.m. ET 2/16/17.


[[Page 9064]]


    Docket Numbers: ER17-858-000.
    Applicants: 67RK 8me LLC.
    Description: Sec.  205(d) Rate Filing: Co-Tenancy Agreement to be 
effective 1/27/2017.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5167.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER17-859-000.
    Applicants: 65HK 8me LLC.
    Description: Sec.  205(d) Rate Filing: Co-Tenancy Agreement to be 
effective 1/27/2017.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5168.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER17-860-000.
    Applicants: 87RL 8me LLC.
    Description: Sec.  205(d) Rate Filing: Co-Tenancy Agreement to be 
effective 1/27/2017.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5169.
    Comments Due: 5 p.m. ET 2/16/17.

    Docket Numbers: ER17-861-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2017-01-27_Schedule 31 
Annual Update Filing to be effective 4/1/2017.
    Filed Date: 1/27/17.
    Accession Number: 20170127-5029.
    Comments Due: 5 p.m. ET 2/17/17.

    Docket Numbers: ER17-862-000.
    Applicants: Bethel Wind Farm LLC.
    Description: Sec.  205(d) Rate Filing: Amendment of Bethel Wind 
Farm MBR Tariff to be effective 1/28/2017.
    Filed Date: 1/27/17.
    Accession Number: 20170127-5031.
    Comments Due: 5 p.m. ET 2/17/17.

    Docket Numbers: ER17-863-000.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: Commonwealth Edison Company 
Submits PBOP Filing to be effective 3/27/2017.
    Filed Date: 1/27/17.
    Accession Number: 20170127-5034.
    Comments Due: 5 p.m. ET 2/17/17.

    Take notice that the Commission received the following public 
utility holding company filings:

    Docket Numbers: PH17-7-000.
    Applicants: Oaktree Capital Group, LLC.
    Description: Oaktree Capital Group, LLC FERC 65-B Waiver 
Notification.
    Filed Date: 1/26/17.
    Accession Number: 20170126-5211.
    Comments Due: 5 p.m. ET 2/16/17.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 27, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-02225 Filed 2-1-17; 8:45 am]