Combined Notice of Filings #2, 8417-8418 [2017-01633]
Download as PDF
Federal Register / Vol. 82, No. 15 / Wednesday, January 25, 2017 / Notices
feasibility of the Snow River
Hydroelectric Project (Snow River
Project or project) to be located on the
Snow River, near Seward in the Kenai
Peninsula Borough, Alaska. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission. The project
would utilize 15,957 acres of land
owned by the U.S. Forest Service.
The project consists of two
alternatives both using the following
new facilities: (1) A 700-foot-long, 300foot-high concrete-faced rockfill or
roller compacted concrete gravity dam
with a 400-foot-long spillway built into
the crest of the dam; (2) a 300-foot-long,
60-foot-high concrete-faced rockfill or
roller compacted concrete gravity
auxiliary dam on the right bank; (3) a
500-foot-long, 80-foot-high concretefaced rockfill or roller compacted
concrete gravity auxiliary dam on the
left bank; and (4) a 5,321-acre reservoir.
Alternative 1
(1) A 10,040-foot-long, 14 footdiameter horseshoe intake tunnel; (2) a
1,140-foot long, 173-inch-diameter steel
penstock; (3) an 80-foot-long, 100-footwide pre-engineered metal powerhouse
with three turbine units rated at 25
megawatts (MW) each for 75 MW total;
(4) a submerged tailrace discharge; (5) a
2.55-mile-long, 69-kilovolt (kV)
transmission line tying into an existing
high voltage transmission line located
west of the proposed powerhouse; (6) a
1,410-foot-long access road to the intake
tunnel and dam; (7) a 6,858-foot-long
access road to the powerhouse; and (8)
appurtenant facilities.
mstockstill on DSK3G9T082PROD with NOTICES
Alternative 2
(1) A 3,310-foot-long, 14 foot-diameter
horseshoe intake tunnel; (2) a 2,650-foot
long, 173-inch-diamater steel penstock;
(3) the same powerhouse, turbine,
tailrace and transmission line as
described above for Alternative 1; (4) a
12,600-foot-long access road to the
intake tunnel and dam; (5) a 8,000-footlong access road to the powerhouse; and
(6) appurtenant facilities.
The estimated annual generation of
the Snow River Project would be 341
gigawatt-hours.
Applicant Contact: Mr. Paul Risse,
Senior Vice President, Chugach Electric
Association, Inc., 5601 Electron Drive,
Anchorage, AK 99518; phone: (907)
563–7494.
VerDate Sep<11>2014
20:29 Jan 24, 2017
Jkt 241001
FERC Contact: Julia Kolberg, phone:
(202) 502–8261 or email: Julia.kolberg@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14810–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14810) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 18, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–01675 Filed 1–24–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–310–001.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Clarify TCR Electrically Equivalent
Settlement Location Compliance Filing
to be effective 1/5/2017.
Filed Date: 1/17/17.
Accession Number: 20170117–5154.
Comments Due: 5 p.m. ET 2/7/17.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
8417
Docket Numbers: ER17–800–000.
Applicants: CED White River Solar 2,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rates Tariff
to be effective 1/18/2017.
Filed Date: 1/17/17.
Accession Number: 20170117–5173.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17–801–000.
Applicants: Constellation Power
Source Generation, LLC.
Description: § 205(d) Rate Filing:
Reactive Service Rate Schedule Filings
to be effective 3/17/2017.
Filed Date: 1/17/17.
Accession Number: 20170117–5223.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17–802–000.
Applicants: Exelon Generation
Company, LLC.
Description: § 205(d) Rate Filing:
Reactive Service Rate Schedules to be
effective 3/17/2017.
Filed Date: 1/17/17.
Accession Number: 20170117–5224.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17–803–000.
Applicants: Handsome Lake Energy,
LLC.
Description: § 205(d) Rate Filing:
Reactive Service Rate Schedule Filings
to be effective 3/17/2017.
Filed Date: 1/17/17.
Accession Number: 20170117–5225.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17–804–000.
Applicants: Coram California
Development, L.P.
Description: § 205(d) Rate Filing:
Revisions to Market-Based Rate Tariff to
be effective 1/18/2017.
Filed Date: 1/17/17.
Accession Number: 20170117–5259.
Comments Due: 5 p.m. ET 2/7/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\25JAN1.SGM
25JAN1
8418
Federal Register / Vol. 82, No. 15 / Wednesday, January 25, 2017 / Notices
Dated: January 17, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: January 18, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–01633 Filed 1–24–17; 8:45 am]
[FR Doc. 2017–01679 Filed 1–24–17; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. AC17–40–000]
mstockstill on DSK3G9T082PROD with NOTICES
Black Marlin Pipeline Company; Notice
of Petition for Waiver
Take notice that on January 17, 2017,
Black Marlin Pipeline Company filed a
petition for waiver of CPA Certification
Statement for its FERC Form 2–A
submittals encompassing the report
years 2016 and 2017, as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
February 7, 2017.
VerDate Sep<11>2014
20:29 Jan 24, 2017
Jkt 241001
Notice of Staff Attendance at the
Southwest Power Pool Regional Entity
Trustee, Regional State Committee,
Members’ Committee and Board of
Directors’ Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meetings of the Southwest
Power Pool, Inc. Regional Entity Trustee
(RET), Regional State Committee (RSC),
Members’ Committee and Board of
Directors as noted below. Their
attendance is part of the Commission’s
ongoing outreach efforts.
All meetings will be held at the
Doubletree Hotel, 4099 Valley View
Lane, Dallas, TX 75244. The phone
number is (972) 385–9000. All meetings
are Central Time.
SPP RET
January 30, 2017 (8:00–5:00 p.m.)
SPP RSC
January 30, 2017 (1:00 p.m.–5:00
p.m.)
SPP Members/Board of Directors
January 31, 2017 (8:00 a.m.–3:00 p.m.)
The discussions may address matters
at issue in the following proceedings:
Docket No. ER11–1844, Midcontinent
Independent System Operator, Inc.
Docket No. ER12–1179, Southwest
Power Pool, Inc.
Docket No. ER14–2850, Southwest
Power Pool, Inc.
Docket No. ER15–1499, Southwest
Power Pool, Inc.
Docket No. ER15–1775, Southwest
Power Pool, Inc.
Docket No. ER15–1777, Southwest
Power Pool, Inc.
Docket No. ER15–1943, Southwest
Power Pool, Inc.
Docket No. ER15–1976, Southwest
Power Pool, Inc.
Docket No. ER15–2028, Southwest
Power Pool, Inc.
Docket No. ER15–2115, Southwest
Power Pool, Inc.
Docket No. ER15–2324, Southwest
Power Pool, Inc.
Docket No. ER15–2347, Southwest
Power Pool, Inc.
Docket No. ER15–2351, Southwest
Power Pool, Inc.
Docket No. ER15–2356, Southwest
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Power Pool, Inc.
Docket No. EL16–91, Southwest
Power Pool, Inc.
Docket No. EL16–108, Tilton Energy
v. Midcontinent Independent
System Operator, Inc.
Docket No. EL16–110, Southwest
Power Pool, Inc.
Docket No. ER16–13, Southwest
Power Pool, Inc.
Docket No. ER16–204, Southwest
Power Pool, Inc.
Docket No. ER16–209, Southwest
Power Pool, Inc.
Docket No. ER16–791, Southwest
Power Pool, Inc.
Docket No. ER16–829, Southwest
Power Pool, Inc.
Docket No. ER16–846, Southwest
Power Pool, Inc.
Docket No. ER16–862, Southwest
Power Pool, Inc.
Docket No. ER16–863, Southwest
Power Pool, Inc.
Docket No. ER16–932, Southwest
Power Pool, Inc.
Docket No. ER16–1211, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–1305, Southwest
Power Pool, Inc.
Docket No. ER16–1351, Westar
Energy, Inc.
Docket No. ER16–1314, Southwest
Power Pool, Inc.
Docket No. ER16–1341, Southwest
Power Pool, Inc.
Docket No. ER16–1546, Southwest
Power Pool, Inc.
Docket No. ER16–1797, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–1799, Southwest
Power Pool, Inc.
Docket No. ER16–1912, Southwest
Power Pool, Inc.
Docket No. ER16–1945, Southwest
Power Pool, Inc.
Docket No. ER16–2522, Southwest
Power Pool, Inc.
Docket No. ER16–2523, Southwest
Power Pool, Inc.
Docket No. EL17–11, Alabama Power
Co.
Docket No. EL17–21, Kansas Electric
Co.
Docket No. EL17–29, American
Municipal Power
Docket No. ER17–236, Southwestern
Public Service Co.
Docket No. ER17–238, Southwestern
Public Service Co.
Docket No. ER17–253, Southwest
Power Pool, Inc.
Docket No. ER17–264, Southwest
Power Pool, Inc.
Docket No. ER17–267, Southwestern
Public Service Co.
Docket No. ER17–300, Southwest
Power Pool, Inc.
Docket No. ER17–353, Southwest
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 82, Number 15 (Wednesday, January 25, 2017)]
[Notices]
[Pages 8417-8418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-01633]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-310-001.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Clarify TCR Electrically Equivalent
Settlement Location Compliance Filing to be effective 1/5/2017.
Filed Date: 1/17/17.
Accession Number: 20170117-5154.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17-800-000.
Applicants: CED White River Solar 2, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Market-Based
Rates Tariff to be effective 1/18/2017.
Filed Date: 1/17/17.
Accession Number: 20170117-5173.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17-801-000.
Applicants: Constellation Power Source Generation, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Service Rate
Schedule Filings to be effective 3/17/2017.
Filed Date: 1/17/17.
Accession Number: 20170117-5223.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17-802-000.
Applicants: Exelon Generation Company, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Service Rate
Schedules to be effective 3/17/2017.
Filed Date: 1/17/17.
Accession Number: 20170117-5224.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17-803-000.
Applicants: Handsome Lake Energy, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Service Rate
Schedule Filings to be effective 3/17/2017.
Filed Date: 1/17/17.
Accession Number: 20170117-5225.
Comments Due: 5 p.m. ET 2/7/17.
Docket Numbers: ER17-804-000.
Applicants: Coram California Development, L.P.
Description: Sec. 205(d) Rate Filing: Revisions to Market-Based
Rate Tariff to be effective 1/18/2017.
Filed Date: 1/17/17.
Accession Number: 20170117-5259.
Comments Due: 5 p.m. ET 2/7/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 8418]]
Dated: January 17, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-01633 Filed 1-24-17; 8:45 am]
BILLING CODE 6717-01-P