Sunshine Act Meeting Notice, 5553-5555 [2017-01138]

Download as PDF Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices Filed Date: 1/11/17. Accession Number: 20170111–5096. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER16–1724–001. Applicants: Paulding Wind Farm III LLC. Description: Notice of Non-Material Change in Status of Paulding Wind Farm III LLC. Filed Date: 1/11/17. Accession Number: 20170111–5075. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–204–001. Applicants: Quantum Power Corp. Description: Tariff Amendment: MBR Tariff Amendment Filing to be effective 1/1/2017. Filed Date: 1/11/17. Accession Number: 20170111–5046. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–771–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Queue Position AB1–098, Original Service Agreement No. 4595 to be effective 12/12/2016. Filed Date: 1/11/17. Accession Number: 20170111–5031. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–772–000. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Order No. 825 Compliance Filing to be effective 5/11/2017. Filed Date: 1/11/17. Accession Number: 20170111–5077. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–773–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: Rate Schedule No. 154-Concurrence RS 76Cancel RS 77 and RS147 to be effective 1/1/2017. Filed Date: 1/11/17. Accession Number: 20170111–5083. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–774–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. Description: Compliance filing: Compliance with Order No. 825; Docket No. RM15–24–000 to be effective 12/1/ 2017. Filed Date: 1/11/17. Accession Number: 20170111–5084. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–775–000. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance Filing pursuant to Commission’s Final Rule in RM15–24; Order No. 825 to be effective 2/1/2018. Filed Date: 1/11/17. Accession Number: 20170111–5108. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–776–000. Applicants: San Diego Gas & Electric Company. Description: Initial rate filing: Certificate of Concurrence in LGIA to be effective 3/6/2017. Filed Date: 1/11/17. Accession Number: 20170111–5109. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–777–000. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2017– 01–11 Order No. 825 Compliance to be effective N/A. Filed Date: 1/11/17. Accession Number: 20170111–5112. Comments Due: 5 p.m. ET 2/1/17. Docket Numbers: ER17–778–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2017– 01–11_Order 825 Price Formation Compliance Filing to be effective 3/1/ 2018. Filed Date: 1/11/17. Accession Number: 20170111–5125. Comments Due: 5 p.m. ET 2/1/17. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 11, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–00987 Filed 1–17–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: January 19, 2017 10:00 a.m. Room 2C, 888 First Street NE., Washington, DC 20426. PLACE: STATUS: Open. MATTERS TO BE CONSIDERED: Agenda * Note—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https:// ferc.capitolconnection.org/ sing the eLibrary link, or may be examined in the Commission’s Public Reference Room. 1034th—MEETING; REGULAR MEETING mstockstill on DSK3G9T082PROD with NOTICES [January 19, 2017, 10 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 A–2 AD16–7–000 .................................................................. AD16–1–000 .................................................................. VerDate Sep<11>2014 17:41 Jan 17, 2017 Jkt 241001 PO 00000 Frm 00032 Customer Matters, Reliability, Security and Market Operations. Agency Administrative Matters. Fmt 4703 Sfmt 4703 5553 E:\FR\FM\18JAN1.SGM 18JAN1 5554 Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices 1034th—MEETING; REGULAR MEETING—Continued [January 19, 2017, 10 a.m.] Item No. Docket No. Company ELECTRIC E–1 RM17–2–000 ................................................................. E–2 E–3 E–4 E–5 E–6 E–7 E–12 PL17–2–000 .................................................................. OMITTED ....................................................................... OMITTED. OMITTED. OMITTED. ER09–1256–002, ........................................................... ER12–2708–003 ............................................................ ER13–2483–001 ............................................................ ER16–1483–002, ........................................................... ER16–1483–0004 .......................................................... EL14–37–000 ................................................................ ER13–1654–001, ........................................................... ER13–1654–002 ............................................................ RM16–7–000 ................................................................. E–13 E–14 RM16–20–000 ............................................................... RM15–11–001 ............................................................... E–15 E–18 E–19 ER16–1807–000, ........................................................... ER10–1459–008 ............................................................ ER10–1469–004 ............................................................ ER10–1467–004 ............................................................ ER10–1468–004 ............................................................ ER13–785–003 .............................................................. ER13–713–003 .............................................................. ER10–1453–004 ............................................................ ER16–835–000 .............................................................. EL16–117–001 .............................................................. Montana Environmental Information Center v. Montana Public Service Commission.. ER16–1904–001 ............................................................ EL13–88–001 ................................................................ E–20 E–21 E–22 ER16–1967–000 ............................................................ ER16–1969–000 ............................................................ ER16–1969–001 (Not Consolidated). EL16–120–000 .............................................................. ER17–408–000 .............................................................. ER17–411–000 .............................................................. E–8 E–9 E–10 E–11 E–16 E–17 Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators. Utilization of Electric Storage Resources for Multiple Services When Receiving Cost-Based Rate Recovery. Potomac-Appalachian Transmission Highline, LLC PJM Interconnection, L.L.C. Old Dominion Electric Cooperative. California Independent System Operator Corporation. PJM Interconnection, L.L.C. PJM Interconnection, L.L.C. Disturbance Control Standard—Contingency Reserve for Recovery from a Balancing Contingency Event Reliability Standard. Remedial Action Schemes Reliability Standard. Reliability Standard for Transmission System Planned Performance for Geomagnetic Disturbance Events. FirstEnergy Solutions Corp. The Cleveland Electric Illuminating Company. Ohio Edison Company. The Toledo Edison Company. FirstEnergy Generation, LLC. FirstEnergy Nuclear Generation, LLC. FirstEnergy Generation Mansfield Unit 1 Corp. New York Independent System Operator, Inc. Vote Solar Initiative and ISO New England Inc. Northern Indiana Public Service Company v. Midcontinent Independent System Operator, Inc. and PJM Interconnection, L.L.C. PJM Interconnection, L.L.C. Midcontinent Independent System Operator, Inc. New England Power Generators Association, Inc. v. ISO New England Inc. California Independent System Operator Corporation. California Independent System Operator Corporation. GAS G–1 G–2 RP17–303–000 .............................................................. RP17–302–000 .............................................................. Natural Gas Pipeline Company of America LLC. Wyoming Interstate Company, L.L.C. HYDRO H–1 H–2 H–3 H–4 P–1971–079 P–1864–164 P–2114–277 P–4254–011 .................................................................. .................................................................. .................................................................. .................................................................. Idaho Power Company. Upper Peninsula Power Company. Public Utility District No. 2 of Grant County, Washington. Brentwood Dam Ventures, LLC. CERTIFICATES mstockstill on DSK3G9T082PROD with NOTICES C–1 C–2 C–3 OMITTED. OMITTED. CP15–514–000 .............................................................. CP15–539–000 .............................................................. VerDate Sep<11>2014 17:41 Jan 17, 2017 Jkt 241001 PO 00000 Frm 00033 Columbia Gas Transmission, LLC. Columbia Gulf Transmission, LLC. Fmt 4703 Sfmt 4703 E:\FR\FM\18JAN1.SGM 18JAN1 Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices Issued: January 12, 2017. Kimberly D. Bose, Secretary. A free webcast of this event is available through https:// ferc.capitolconnection.org/. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https:// ferc.capitolconnection.org/ or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2017–01138 Filed 1–13–17; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2305–058] mstockstill on DSK3G9T082PROD with NOTICES Sabine River Authority of Texas, Sabine River Authority, State of Louisiana; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for approval of Final Drought Contingency Plan. b. Project No.: 2305–058. c. Date Filed: December 15, 2016. d. Applicant: Sabine River Authority of Texas, Sabine River Authority, State of Louisiana. e. Name of Project: Toledo Bend Hydroelectric Project. f. Location: Sabine River on the Texas-Louisiana border in Panola, Shelby, Sabine, and Newton Counties in Texas and DeSoto, Sabine, and Vernon Parishes in Louisiana. VerDate Sep<11>2014 17:41 Jan 17, 2017 Jkt 241001 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Jim Brown, Compliance Officer, Toledo Bend Project Joint Operation, Sabine River Authority, Texas, P.O. Box 579, Orange, TX 77631–0579, (409) 746–2192, jbrown@sratx.org. i. FERC Contact: Mr. John Aedo, (415) 369–3335, or john.aedo@ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is February 9, 2017. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 2305–058) on any comments, motions to intervene, protests, or recommendations filed. Comments emailed to Commission staff are not considered part of the Commission record. k. Description of Request: The licensee requests Commission approval of its Drought Contingency Plan under License Article 416. The plan identifies the public access measures and reservoir public access measures that the licensees would implement during drought conditions. Specifically, the plan outlines actions that the licensee would implement when reservoir elevations drop to 168 feet-msl and lower, including changes to hydropower generation and water deliveries, implementation of conservation measures, public announcements, and agency notification. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document (P–2305–058). You may also register online at https://www.ferc.gov/ PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 5555 docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208- 3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the E:\FR\FM\18JAN1.SGM 18JAN1

Agencies

[Federal Register Volume 82, Number 11 (Wednesday, January 18, 2017)]
[Notices]
[Pages 5553-5555]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-01138]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: January 19, 2017 10:00 a.m.

PLACE:  Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS:  Open.

MATTERS TO BE CONSIDERED: 

Agenda

    * Note--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://ferc.capitolconnection.org/ sing the 
eLibrary link, or may be examined in the Commission's Public Reference 
Room.

                    1034th--Meeting; Regular Meeting
                       [January 19, 2017, 10 a.m.]
------------------------------------------------------------------------
           Item No.               Docket No.             Company
------------------------------------------------------------------------
                             ADMINISTRATIVE
------------------------------------------------------------------------
A-1..........................  AD16-7-000......  Customer Matters,
                                                  Reliability, Security
                                                  and Market Operations.
A-2..........................  AD16-1-000......  Agency Administrative
                                                  Matters.

[[Page 5554]]

 
                                ELECTRIC
------------------------------------------------------------------------
E-1..........................  RM17-2-000......  Uplift Cost Allocation
                                                  and Transparency in
                                                  Markets Operated by
                                                  Regional Transmission
                                                  Organizations and
                                                  Independent System
                                                  Operators.
E-2..........................  PL17-2-000......  Utilization of Electric
E-3..........................  OMITTED.........   Storage Resources for
                                                  Multiple Services When
                                                  Receiving Cost-Based
                                                  Rate Recovery.
E-4..........................  OMITTED.........
E-5..........................  OMITTED.........
E-6..........................  OMITTED.........
E-7..........................  ER09-1256-002,..  Potomac-Appalachian
                               ER12-2708-003...   Transmission Highline,
                                                  LLC PJM
                                                  Interconnection,
                                                  L.L.C.
E-8..........................  ER13-2483-001...  Old Dominion Electric
                                                  Cooperative.
E-9..........................  ER16-1483-002,..  California Independent
                               ER16-1483-0004..   System Operator
                                                  Corporation.
E-10.........................  EL14-37-000.....  PJM Interconnection,
                                                  L.L.C.
E-11.........................  ER13-1654-001,..  PJM Interconnection,
                               ER13-1654-002...   L.L.C.
E-12.........................  RM16-7-000......  Disturbance Control
                                                  Standard--Contingency
                                                  Reserve for Recovery
                                                  from a Balancing
                                                  Contingency Event
                                                  Reliability Standard.
E-13.........................  RM16-20-000.....  Remedial Action Schemes
                                                  Reliability Standard.
E-14.........................  RM15-11-001.....  Reliability Standard
                                                  for Transmission
                                                  System Planned
                                                  Performance for
                                                  Geomagnetic
                                                  Disturbance Events.
E-15.........................  ER16-1807-000,..  FirstEnergy Solutions
                               ER10-1459-008...   Corp.
                               ER10-1469-004...  The Cleveland Electric
                                                  Illuminating Company.
                               ER10-1467-004...  Ohio Edison Company.
                               ER10-1468-004...  The Toledo Edison
                                                  Company.
                               ER13-785-003....  FirstEnergy Generation,
                                                  LLC.
                               ER13-713-003....  FirstEnergy Nuclear
                                                  Generation, LLC.
                               ER10-1453-004...  FirstEnergy Generation
                                                  Mansfield Unit 1 Corp.
E-16.........................  ER16-835-000....  New York Independent
                                                  System Operator, Inc.
E-17.........................  EL16-117-001....  Vote Solar Initiative
                                                  and
                               Montana
                                Environmental
                                Information
                                Center v.
                                Montana Public
                                Service
                                Commission..
E-18.........................  ER16-1904-001...  ISO New England Inc.
E-19.........................  EL13-88-001.....  Northern Indiana Public
                                                  Service Company v.
                                                  Midcontinent
                                                  Independent System
                                                  Operator, Inc. and PJM
                                                  Interconnection,
                                                  L.L.C.
                               ER16-1967-000...  PJM Interconnection,
                                                  L.L.C.
                               ER16-1969-000...  Midcontinent
                                                  Independent System
                                                  Operator, Inc.
                               ER16-1969-001
                                (Not
                                Consolidated).
E-20.........................  EL16-120-000....  New England Power
                                                  Generators
                                                  Association, Inc. v.
                                                  ISO New England Inc.
E-21.........................  ER17-408-000....  California Independent
                                                  System Operator
                                                  Corporation.
E-22.........................  ER17-411-000....  California Independent
                                                  System Operator
                                                  Corporation.
------------------------------------------------------------------------
                                   GAS
------------------------------------------------------------------------
G-1..........................  RP17-303-000....  Natural Gas Pipeline
                                                  Company of America
                                                  LLC.
G-2..........................  RP17-302-000....  Wyoming Interstate
                                                  Company, L.L.C.
------------------------------------------------------------------------
                                  HYDRO
------------------------------------------------------------------------
H-1..........................  P-1971-079......  Idaho Power Company.
H-2..........................  P-1864-164......  Upper Peninsula Power
                                                  Company.
H-3..........................  P-2114-277......  Public Utility District
                                                  No. 2 of Grant County,
                                                  Washington.
H-4..........................  P-4254-011......  Brentwood Dam Ventures,
                                                  LLC.
------------------------------------------------------------------------
                              CERTIFICATES
------------------------------------------------------------------------
C-1..........................  OMITTED.........
C-2..........................  OMITTED.........
C-3..........................  CP15-514-000....  Columbia Gas
                               CP15-539-000....   Transmission, LLC.
                                                 Columbia Gulf
                                                  Transmission, LLC.
------------------------------------------------------------------------



[[Page 5555]]

    Issued: January 12, 2017.
Kimberly D. Bose,
Secretary.

    A free webcast of this event is available through https://ferc.capitolconnection.org/. Anyone with Internet access who desires to 
view this event can do so by navigating to www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://ferc.capitolconnection.org/ or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2017-01138 Filed 1-13-17; 11:15 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.