Application To Export Electric Energy; BP Energy Company, 5549 [2017-01031]

Download as PDF Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices sufficiency of supply or reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https://energy.gov/ node/11845, or by emailing Angela Troy at Angela.Troy@hq.doe.gov. Issued in Washington, DC, on January 11, 2017. Christopher Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2017–01032 Filed 1–17–17; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [OE Docket No. EA–314–B] Application To Export Electric Energy; BP Energy Company Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. AGENCY: BP Energy Company (BP Energy or Applicant) has applied to renew its authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act. DATES: Comments, protests, or motions to intervene must be submitted on or before February 17, 2017. ADDRESSES: Comments, protests, motions to intervene, or requests for more information should be addressed to: Office of Electricity Delivery and Energy Reliability, Mail Code: OE–20, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585–0350. Because of delays in handling conventional mail, it is recommended that documents be transmitted by overnight mail, by electronic mail to Electricity.Exports@ hq.doe.gov, or by facsimile to 202–586– 8008. SUPPLEMENTARY INFORMATION: Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)). On May 3, 2012, DOE issued Order No. EA–314–A to BP Energy, which authorized the Applicant to transmit electric energy from the United States to Mexico as a power marketer for a fiveyear term using existing international transmission facilities. That authority mstockstill on DSK3G9T082PROD with NOTICES SUMMARY: VerDate Sep<11>2014 19:04 Jan 17, 2017 Jkt 241001 expires on February 21, 2017. On December 29, 2016, BP Energy filed an application with DOE for renewal of the export authority contained in Order No. EA–314 for an additional five-year term. In its application, BP Energy states that it does not own or operate any electric generation or transmission facilities, and it does not have a franchised service area. The electric energy that BP Energy proposes to export to Mexico would be purchased from third parties such as electric utilities and Federal power marketing agencies pursuant to voluntary agreements. The existing international transmission facilities to be utilized by BP Energy have previously been authorized by Presidential Permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties. Procedural Matters: Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the Federal Energy Regulatory Commission’s (FERC) Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (18 CFR 385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above. Comments and other filings concerning BP Energy’s application to export electric energy to Mexico should be clearly marked with OE Docket No. EA–314–B. An additional copy is to be provided directly to both Betsy Carr, BP America Inc., 201 Helios Way, Houston, TX 77079, and Eric Schubert, BP Energy Company, 201 Helios Way, Houston, TX 77079. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE’s National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the sufficiency of supply or reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https://energy.gov/ node/11845, or by emailing Angela Troy at Angela.Troy@hq.doe.gov. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 5549 Issued in Washington, DC, on January 11, 2017. Christopher Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2017–01031 Filed 1–17–17; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Request for Information—Challenges and Opportunities for Sustainable Development of Hydropower in Undeveloped Stream Reaches of the United States; Notice of Reopening of Comment Period Water Power Technologies Office, Office of Energy Efficiency and Renewable Energy, Department of Energy (DOE). ACTION: Notice of reopening of comment period. AGENCY: On November 9, 2016, the Water Power Technologies Office (WPTO) within the Department of Energy (DOE) issued a request for information (RFI) in the Federal Register to invite input from the public regarding challenges and opportunities associated with hydropower development in undeveloped streamreaches. The WPTO is reopening the comment period until February 10, 2017, to provide interested parties with additional time to submit comments. DATES: Responses must be received no later than 5:00 p.m. (ET) on Friday, February 10, 2017. ADDRESSES: Responses to this RFI must be submitted electronically to HydroNextFOA@ee.doe.gov as Microsoft Word (.docx) attachments to an email, and be no more than 6 pages in length, 12 point font, 1 inch margins. It is recommended that attachments with file sizes exceeding 25 MB be compressed (i.e., zipped) to ensure message delivery. Please include in the subject line ‘‘Comments for RFI’’. Only electronic responses will be accepted. FOR FURTHER INFORMATION CONTACT: Questions may be directed to: Rajesh Dham, Water Power Technologies Office, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585, Phone: (202) 287–6675, Email: Rajesh.Dham@ ee.doe.gov. SUPPLEMENTARY INFORMATION: On November 9, 2016, the Water Power Technologies Office (WPTO) within the Department of Energy (DOE) issued a request for information (RFI) in the SUMMARY: E:\FR\FM\18JAN1.SGM 18JAN1

Agencies

[Federal Register Volume 82, Number 11 (Wednesday, January 18, 2017)]
[Notices]
[Page 5549]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-01031]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-314-B]


Application To Export Electric Energy; BP Energy Company

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: BP Energy Company (BP Energy or Applicant) has applied to 
renew its authority to transmit electric energy from the United States 
to Mexico pursuant to section 202(e) of the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before February 17, 2017.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
Electricity.Exports@hq.doe.gov, or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On May 3, 2012, DOE issued Order No. EA-314-A to BP Energy, which 
authorized the Applicant to transmit electric energy from the United 
States to Mexico as a power marketer for a five-year term using 
existing international transmission facilities. That authority expires 
on February 21, 2017. On December 29, 2016, BP Energy filed an 
application with DOE for renewal of the export authority contained in 
Order No. EA-314 for an additional five-year term.
    In its application, BP Energy states that it does not own or 
operate any electric generation or transmission facilities, and it does 
not have a franchised service area. The electric energy that BP Energy 
proposes to export to Mexico would be purchased from third parties such 
as electric utilities and Federal power marketing agencies pursuant to 
voluntary agreements. The existing international transmission 
facilities to be utilized by BP Energy have previously been authorized 
by Presidential Permits issued pursuant to Executive Order 10485, as 
amended, and are appropriate for open access transmission by third 
parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedures (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
copies of such comments, protests, or motions to intervene should be 
sent to the address provided above on or before the date listed above.
    Comments and other filings concerning BP Energy's application to 
export electric energy to Mexico should be clearly marked with OE 
Docket No. EA-314-B. An additional copy is to be provided directly to 
both Betsy Carr, BP America Inc., 201 Helios Way, Houston, TX 77079, 
and Eric Schubert, BP Energy Company, 201 Helios Way, Houston, TX 
77079.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at https://energy.gov/node/11845, or by 
emailing Angela Troy at Angela.Troy@hq.doe.gov.

    Issued in Washington, DC, on January 11, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2017-01031 Filed 1-17-17; 8:45 am]
 BILLING CODE 6450-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.