National Fuel Gas Supply Corporation; Notice of Schedule for Environmental Review of the Proposed Line QP, Line Q, and Queen Storage Project, 5562-5563 [2017-00927]
Download as PDF
5562
Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on February 9, 2017.
Dated: January 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–00932 Filed 1–17–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Revocation of Market-Based
Rate Tariff
Docket Nos.
Electric Quarterly Reports ...........................................................................................................................................................
Bargain Energy, LLC ...................................................................................................................................................................
CES Placerita, Incorporated ........................................................................................................................................................
DES Wholesale, LLC ..................................................................................................................................................................
DownEast Power Company, LLC ...............................................................................................................................................
Escanaba Green Energy, LLC ....................................................................................................................................................
LVI Power, LLC ...........................................................................................................................................................................
Madstone Energy Corp ...............................................................................................................................................................
NiGen, LLC ..................................................................................................................................................................................
R&R Energy, Inc .........................................................................................................................................................................
Tall Bear Group, LLC ..................................................................................................................................................................
mstockstill on DSK3G9T082PROD with NOTICES
On October 27, 2016, the Commission
issued an order announcing its intent to
revoke the market-based rate authority
of the public utilities listed in the
caption of that order, which had failed
to file their required Electric Quarterly
Reports.1 The Commission directed
those public utilities to file the required
Electric Quarterly Reports within 15
days of the date of issuance of the order
or face revocation of their authority to
sell power at market-based rates and
termination of their electric marketbased rate tariffs.2
The time period for compliance with
the October 27 Order has elapsed. The
above-captioned companies failed to file
their delinquent Electric Quarterly
Reports. The Commission hereby
revokes the market-based rate authority
and terminates the electric market-based
rate tariff of each of the companies who
are named in the caption of this order.
Dated: January 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–00930 Filed 1–17–17; 8:45 am]
BILLING CODE 6717–01–P
1 Electric Quarterly Reports, 157 FERC 61,058
(2016) (October 27 Order).
2 Id. at Ordering Paragraph A.
VerDate Sep<11>2014
17:41 Jan 17, 2017
Jkt 241001
ER02–2001–020
ER14–1343–001
ER14–57–000
ER12–1770–001
ER10–1304–002
ER12–2307–001
ER12–2484–000
ER11–4482–000
ER15–567–001
ER11–4711–002
ER12–2374–000
All interested persons and staff are
permitted to attend. For further
information please contact Tehseen
Rana at (202) 502–8639 or
tehseen.rana@ferc.gov.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP17–197–000]
Dominion Cove Point LNG, LP; Notice
of Technical Conference
Dated: January 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–00997 Filed 1–17–17; 8:45 am]
The Commission’s December 30, 2016
order in the above-captioned
proceeding 1 directed that a technical
conference be held to address the effect
of the tariff changes proposed by
Dominion Cove Point LNG, LP in its
November 23, 2016 filing in this docket.
Take notice that a technical
conference will be held on Thursday
February 2, 2017 at 10:00 a.m., in
Hearing Room #2 at the offices of the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
1 Dominion Cove Point LNG, LP, 157 FERC ¶
61,249 (2016).
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–28–000]
National Fuel Gas Supply Corporation;
Notice of Schedule for Environmental
Review of the Proposed Line QP, Line
Q, and Queen Storage Project
On December 3, 2015, National Fuel
Gas Supply Corporation (National Fuel)
filed an application in Docket No.
CP16–28–000 requesting a Certificate of
Public Convenience and Necessity
pursuant to Sections 7(b) and 7(c) of the
Natural Gas Act to abandon, construct
and operate certain natural gas pipeline
facilities. The proposed project is
known as the Line QP, Line Q, and
Queen Storage Project (Project) located
E:\FR\FM\18JAN1.SGM
18JAN1
Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices
in Forest and Warren Counties,
Pennsylvania.
On December 16, 2015, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA: April 13, 2017
90-day Federal Authorization Decision
Deadline: July 12, 2017
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
mstockstill on DSK3G9T082PROD with NOTICES
Project Description
National Fuel seeks authorization to
abandon by sale all of its facilities
comprising its Queen Storage Field,
including the base gas in the field, its
Queen Compressor Station, and a
segment of its Line Q, approximately 5.5
miles in length, beginning at the Queen
Compressor Station and traversing
northwest to a location just south of the
Allegheny River (the ‘‘Line Q
Segment’’). Also, National Fuel seeks
authorization to construct and operate
approximately 5 miles of new 4-inchdiameter plastic pipeline (‘‘Line QP’’)
beginning at a point just north of the
Allegheny River, and traversing
southeast along or adjacent to the
existing Line Q right-of-way, to a point
approximately 2,000 feet west of the
Queen Compressor Station.
Background
On January 20, 2016, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Line QP, Line Q, and Queen
Storage Project and Request for
Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the NOI,
the Commission received comments
from the United States Army Corps of
Engineers, Pittsburgh District (USACE).
The USACE stated concern regarding
the proposed Project’s impact on
VerDate Sep<11>2014
17:41 Jan 17, 2017
Jkt 241001
federally listed species within the Wild
and Scenic River portion of the
Allegheny River. The U.S. Forest
Service, Allegheny National Forest
office; USACE; and the Pennsylvania
Fish and Boat Commission are
cooperating agencies in the preparation
of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP16–28), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: January 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–00927 Filed 1–17–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–769–000]
Stream Energy Massachusetts LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Stream
Energy Massachusetts LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
5563
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 31,
2017.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: January 11, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–00995 Filed 1–17–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
E:\FR\FM\18JAN1.SGM
18JAN1
Agencies
[Federal Register Volume 82, Number 11 (Wednesday, January 18, 2017)]
[Notices]
[Pages 5562-5563]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-00927]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-28-000]
National Fuel Gas Supply Corporation; Notice of Schedule for
Environmental Review of the Proposed Line QP, Line Q, and Queen Storage
Project
On December 3, 2015, National Fuel Gas Supply Corporation (National
Fuel) filed an application in Docket No. CP16-28-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Sections
7(b) and 7(c) of the Natural Gas Act to abandon, construct and operate
certain natural gas pipeline facilities. The proposed project is known
as the Line QP, Line Q, and Queen Storage Project (Project) located
[[Page 5563]]
in Forest and Warren Counties, Pennsylvania.
On December 16, 2015, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA: April 13, 2017
90-day Federal Authorization Decision Deadline: July 12, 2017
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
National Fuel seeks authorization to abandon by sale all of its
facilities comprising its Queen Storage Field, including the base gas
in the field, its Queen Compressor Station, and a segment of its Line
Q, approximately 5.5 miles in length, beginning at the Queen Compressor
Station and traversing northwest to a location just south of the
Allegheny River (the ``Line Q Segment''). Also, National Fuel seeks
authorization to construct and operate approximately 5 miles of new 4-
inch-diameter plastic pipeline (``Line QP'') beginning at a point just
north of the Allegheny River, and traversing southeast along or
adjacent to the existing Line Q right-of-way, to a point approximately
2,000 feet west of the Queen Compressor Station.
Background
On January 20, 2016, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Line QP, Line Q,
and Queen Storage Project and Request for Comments on Environmental
Issues (NOI). The NOI was sent to affected landowners; federal, state,
and local government agencies; elected officials; environmental and
public interest groups; Native American tribes; other interested
parties; and local libraries and newspapers. In response to the NOI,
the Commission received comments from the United States Army Corps of
Engineers, Pittsburgh District (USACE). The USACE stated concern
regarding the proposed Project's impact on federally listed species
within the Wild and Scenic River portion of the Allegheny River. The
U.S. Forest Service, Allegheny National Forest office; USACE; and the
Pennsylvania Fish and Boat Commission are cooperating agencies in the
preparation of the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP16-28), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rule makings.
Dated: January 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-00927 Filed 1-17-17; 8:45 am]
BILLING CODE 6717-01-P