National Fuel Gas Supply Corporation; Notice of Schedule for Environmental Review of the Proposed Line QP, Line Q, and Queen Storage Project, 5562-5563 [2017-00927]

Download as PDF 5562 Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on February 9, 2017. Dated: January 10, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–00932 Filed 1–17–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Revocation of Market-Based Rate Tariff Docket Nos. Electric Quarterly Reports ........................................................................................................................................................... Bargain Energy, LLC ................................................................................................................................................................... CES Placerita, Incorporated ........................................................................................................................................................ DES Wholesale, LLC .................................................................................................................................................................. DownEast Power Company, LLC ............................................................................................................................................... Escanaba Green Energy, LLC .................................................................................................................................................... LVI Power, LLC ........................................................................................................................................................................... Madstone Energy Corp ............................................................................................................................................................... NiGen, LLC .................................................................................................................................................................................. R&R Energy, Inc ......................................................................................................................................................................... Tall Bear Group, LLC .................................................................................................................................................................. mstockstill on DSK3G9T082PROD with NOTICES On October 27, 2016, the Commission issued an order announcing its intent to revoke the market-based rate authority of the public utilities listed in the caption of that order, which had failed to file their required Electric Quarterly Reports.1 The Commission directed those public utilities to file the required Electric Quarterly Reports within 15 days of the date of issuance of the order or face revocation of their authority to sell power at market-based rates and termination of their electric marketbased rate tariffs.2 The time period for compliance with the October 27 Order has elapsed. The above-captioned companies failed to file their delinquent Electric Quarterly Reports. The Commission hereby revokes the market-based rate authority and terminates the electric market-based rate tariff of each of the companies who are named in the caption of this order. Dated: January 9, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–00930 Filed 1–17–17; 8:45 am] BILLING CODE 6717–01–P 1 Electric Quarterly Reports, 157 FERC 61,058 (2016) (October 27 Order). 2 Id. at Ordering Paragraph A. VerDate Sep<11>2014 17:41 Jan 17, 2017 Jkt 241001 ER02–2001–020 ER14–1343–001 ER14–57–000 ER12–1770–001 ER10–1304–002 ER12–2307–001 ER12–2484–000 ER11–4482–000 ER15–567–001 ER11–4711–002 ER12–2374–000 All interested persons and staff are permitted to attend. For further information please contact Tehseen Rana at (202) 502–8639 or tehseen.rana@ferc.gov. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP17–197–000] Dominion Cove Point LNG, LP; Notice of Technical Conference Dated: January 11, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–00997 Filed 1–17–17; 8:45 am] The Commission’s December 30, 2016 order in the above-captioned proceeding 1 directed that a technical conference be held to address the effect of the tariff changes proposed by Dominion Cove Point LNG, LP in its November 23, 2016 filing in this docket. Take notice that a technical conference will be held on Thursday February 2, 2017 at 10:00 a.m., in Hearing Room #2 at the offices of the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an email to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or (202) 502– 8659 (TTY), or send a fax to (202) 208– 2106 with the required accommodations. 1 Dominion Cove Point LNG, LP, 157 FERC ¶ 61,249 (2016). PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP16–28–000] National Fuel Gas Supply Corporation; Notice of Schedule for Environmental Review of the Proposed Line QP, Line Q, and Queen Storage Project On December 3, 2015, National Fuel Gas Supply Corporation (National Fuel) filed an application in Docket No. CP16–28–000 requesting a Certificate of Public Convenience and Necessity pursuant to Sections 7(b) and 7(c) of the Natural Gas Act to abandon, construct and operate certain natural gas pipeline facilities. The proposed project is known as the Line QP, Line Q, and Queen Storage Project (Project) located E:\FR\FM\18JAN1.SGM 18JAN1 Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices in Forest and Warren Counties, Pennsylvania. On December 16, 2015, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. Schedule for Environmental Review Issuance of EA: April 13, 2017 90-day Federal Authorization Decision Deadline: July 12, 2017 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. mstockstill on DSK3G9T082PROD with NOTICES Project Description National Fuel seeks authorization to abandon by sale all of its facilities comprising its Queen Storage Field, including the base gas in the field, its Queen Compressor Station, and a segment of its Line Q, approximately 5.5 miles in length, beginning at the Queen Compressor Station and traversing northwest to a location just south of the Allegheny River (the ‘‘Line Q Segment’’). Also, National Fuel seeks authorization to construct and operate approximately 5 miles of new 4-inchdiameter plastic pipeline (‘‘Line QP’’) beginning at a point just north of the Allegheny River, and traversing southeast along or adjacent to the existing Line Q right-of-way, to a point approximately 2,000 feet west of the Queen Compressor Station. Background On January 20, 2016, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Line QP, Line Q, and Queen Storage Project and Request for Comments on Environmental Issues (NOI). The NOI was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments from the United States Army Corps of Engineers, Pittsburgh District (USACE). The USACE stated concern regarding the proposed Project’s impact on VerDate Sep<11>2014 17:41 Jan 17, 2017 Jkt 241001 federally listed species within the Wild and Scenic River portion of the Allegheny River. The U.S. Forest Service, Allegheny National Forest office; USACE; and the Pennsylvania Fish and Boat Commission are cooperating agencies in the preparation of the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP16–28), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: January 10, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–00927 Filed 1–17–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER17–769–000] Stream Energy Massachusetts LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Stream Energy Massachusetts LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 5563 Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is January 31, 2017. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 11, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017–00995 Filed 1–17–17; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives E:\FR\FM\18JAN1.SGM 18JAN1

Agencies

[Federal Register Volume 82, Number 11 (Wednesday, January 18, 2017)]
[Notices]
[Pages 5562-5563]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-00927]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-28-000]


National Fuel Gas Supply Corporation; Notice of Schedule for 
Environmental Review of the Proposed Line QP, Line Q, and Queen Storage 
Project

    On December 3, 2015, National Fuel Gas Supply Corporation (National 
Fuel) filed an application in Docket No. CP16-28-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Sections 
7(b) and 7(c) of the Natural Gas Act to abandon, construct and operate 
certain natural gas pipeline facilities. The proposed project is known 
as the Line QP, Line Q, and Queen Storage Project (Project) located

[[Page 5563]]

in Forest and Warren Counties, Pennsylvania.
    On December 16, 2015, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA: April 13, 2017
90-day Federal Authorization Decision Deadline: July 12, 2017

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    National Fuel seeks authorization to abandon by sale all of its 
facilities comprising its Queen Storage Field, including the base gas 
in the field, its Queen Compressor Station, and a segment of its Line 
Q, approximately 5.5 miles in length, beginning at the Queen Compressor 
Station and traversing northwest to a location just south of the 
Allegheny River (the ``Line Q Segment''). Also, National Fuel seeks 
authorization to construct and operate approximately 5 miles of new 4-
inch-diameter plastic pipeline (``Line QP'') beginning at a point just 
north of the Allegheny River, and traversing southeast along or 
adjacent to the existing Line Q right-of-way, to a point approximately 
2,000 feet west of the Queen Compressor Station.

Background

    On January 20, 2016, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Proposed Line QP, Line Q, 
and Queen Storage Project and Request for Comments on Environmental 
Issues (NOI). The NOI was sent to affected landowners; federal, state, 
and local government agencies; elected officials; environmental and 
public interest groups; Native American tribes; other interested 
parties; and local libraries and newspapers. In response to the NOI, 
the Commission received comments from the United States Army Corps of 
Engineers, Pittsburgh District (USACE). The USACE stated concern 
regarding the proposed Project's impact on federally listed species 
within the Wild and Scenic River portion of the Allegheny River. The 
U.S. Forest Service, Allegheny National Forest office; USACE; and the 
Pennsylvania Fish and Boat Commission are cooperating agencies in the 
preparation of the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP16-28), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

    Dated: January 10, 2017.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-00927 Filed 1-17-17; 8:45 am]
 BILLING CODE 6717-01-P