Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG17–42–000.
Applicants: Cotton Plains Wind I,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Cotton Plains Wind
I, LLC.
Filed Date: 1/5/17.
Accession Number: 20170105–5166.
Comments Due: 5 p.m. ET 1/26/17.
Docket Numbers: EG17–43–000.
Applicants: Old Settler Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Old Settler Wind,
LLC.
Filed Date: 1/5/17.
Accession Number: 20170105–5169.
Comments Due: 5 p.m. ET 1/26/17.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–424–001.
Applicants: Footprint Power Salem
Harbor Development.
Description: Tariff Amendment:
Amendment to Application for MBR to
be effective 11/30/2016.
Filed Date: 1/6/17.
Accession Number: 20170106–5021.
Comments Due: 5 p.m. ET 1/27/17.
Docket Numbers: ER17–751–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Queue Position AA1–047, Service
Agreement No. 4598 to be effective 12/
7/2016.
Filed Date: 1/6/17.
Accession Number: 20170106–5050.
Comments Due: 5 p.m. ET 1/27/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
VerDate Sep<11>2014
19:46 Jan 11, 2017
Jkt 241001
Dated: January 6, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–00563 Filed 1–11–17; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2337–077]
PacifiCorp Energy; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2337–077.
c. Date Filed: December 30, 2016.
d. Applicant: PacifiCorp Energy.
e. Name of Project: Prospect No. 3
Hydroelectric Project.
f. Location: On the South Fork Rogue
River, in Jackson County, Oregon. The
project occupies 38.1 acres of United
States lands within the Rogue RiverSiskiyou National Forest under the
jurisdiction of the U.S. Forest Service
(Forest Service).
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steve Albertelli,
Relicensing Project Manager, PacifiCorp
Energy, 925 South Grape Street,
Building 5, Medford, OR 97501; (541)
776–6676 or email at steve.albertelli@
pacificorp.com.
i. FERC Contact: Dianne Rodman at
(202) 502–6077 or email at
dianne.rodman@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
project consists of: (1) A 24-foot-high,
172-foot-long concrete diversion dam
with an integrated 98-foot-long ungated,
uncontrolled ogee spillway section; (2)
a 1-acre reservoir that extends 550 feet
upstream from the dam with a gross
storage capacity of 19 acre-feet at
normal full pool elevation of 3,375 feet
above sea level; (3) an 18-foot-wide
intake structure at the north end of the
dam on the right bank with trash rack;
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
3789
(4) a 15,894-foot-long flow conveyance
system (project waterway) consisting of:
A 273-foot-long concrete-lined canal
fitted with a 25-foot-long, 9.75-foot-wide
fish screen; a 66-inch-diameter, 5,448foot-long woodstave pipe; a 5,805-footlong concrete-lined canal; a 5-foot-wide,
6.5-foot-high, 698-foot-long concretelined horseshoe-shaped tunnel; a 416foot-long canal to the forebay with a
2,486-foot-long side channel spillway
discharging to Daniel Creek; and a 66inch to 48-inch-diameter, 3,254-footlong riveted steel penstock; (5) a
powerhouse containing one verticalshaft Francis-type turbine with an
installed capacity of 7.2 megawatts; (6)
a 20-foot-long, 20-foot-wide, 5-foot-deep
concrete tailrace; (7) a 66-inch-diameter,
887-foot-long wood-stave inverted
siphon that routes flow from the tailrace
to the non-project Middle Fork Canal;
(8) a 6.97-mile-long, 69-kilovolt
transmission line interconnecting at the
Prospect Central substation; (9) an 86foot-long, 15-pool concrete pool-andweir ladder to provide upstream fish
passage past the dam; and (10)
appurtenant facilities. The project
produces an average of 35.05 gigawatthours annually.
PacifiCorp proposes to: Improve fish
ladder function by constructing an
auxiliary bypass flow system, realigning
and extending the existing fish bypass
return pipe, and narrowing the weir
notches; replace the existing woodstave
pipe and inverted wooden siphon with
steel structures to eliminate leakage;
rehabilitate the temporary vehicleaccess bridge over the new steel pipe to
meet current Forest Service standards;
construct a road spur to facilitate passthrough of materials dredged from the
reservoir to the bypassed reach; upgrade
the six existing wildlife crossings of the
project waterway’s canal by widening
the crossings and constructing five new
wildlife crossings; and install a
communications link on the U.S.
Geological Survey’s South Fork Rogue
gage.
PacifiCorp also proposes to increase
the project’s minimum flow releases and
ramping rates limits, as well as
extending the project boundary to
include the inverted siphon and access
roads.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 82, Number 8 (Thursday, January 12, 2017)]
[Notices]
[Page 3789]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-00563]
[[Page 3789]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG17-42-000.
Applicants: Cotton Plains Wind I, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Cotton Plains Wind I, LLC.
Filed Date: 1/5/17.
Accession Number: 20170105-5166.
Comments Due: 5 p.m. ET 1/26/17.
Docket Numbers: EG17-43-000.
Applicants: Old Settler Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Old Settler Wind, LLC.
Filed Date: 1/5/17.
Accession Number: 20170105-5169.
Comments Due: 5 p.m. ET 1/26/17.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-424-001.
Applicants: Footprint Power Salem Harbor Development.
Description: Tariff Amendment: Amendment to Application for MBR to
be effective 11/30/2016.
Filed Date: 1/6/17.
Accession Number: 20170106-5021.
Comments Due: 5 p.m. ET 1/27/17.
Docket Numbers: ER17-751-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Queue Position AA1-047,
Service Agreement No. 4598 to be effective 12/7/2016.
Filed Date: 1/6/17.
Accession Number: 20170106-5050.
Comments Due: 5 p.m. ET 1/27/17.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 6, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-00563 Filed 1-11-17; 8:45 am]